VG Estimating · Capture Form · Form 02

Structural Engineering Foundation · Framing · Beams · Insulation

Fill at
Structural engineering report delivery
Date
2026-05-05
Status
Draft 1
Fill when structural engineering report arrives. Resolves scope for foundation, framing, and beam work. Required before P1 bidding begins.
Property address
Property address
Date
PM / person capturing
§ 01Site Work
Feeds: P1W04-SITE-WORK
Linear feet of retaining wall
retaining_wall_lnft:
§ 02Foundation & Drainage
Feeds: P1W05-FOUNDATION-DRAINAGE
Linear feet of drainage system
drainage_lnft:
Waterproofing system scope
waterproofing_type:
e.g. interior / exterior / both
Required frost depth / engineer spec
footing_depth:
Height of new foundation walls
foundation_wall_ht:
§ 03Framing
Feeds: P1W06-FRAMING
Engineered beams (LVL / steel)
beam_count:
Trusses in scope — yes/no and type
truss_plan:
e.g. yes - roof / yes - floor / yes - both / no
Count of new structural openings
major_openings:
§ 04Insulation & Soundproofing
Feeds: P2W07-INSULATION-SOUNDPROOFING
Linear feet of rim joist to insulate
rim_joist_lnft:
observations not captured above