VG Estimating · Capture Form · Form 04

MEP Engineering HVAC · Plumbing · Electrical · MEP finishes

Fill at
MEP engineering report delivery
Date
2026-05-05
Status
Draft 1
Fill when MEP engineering report and load calculations arrive. Resolves equipment specifications, panel sizing, and fixture schedules before P2 bidding.
Property address
Property address
Date
PM / person capturing
§ 01HVAC
Feeds: P2W03-HVAC
Confirmed heating fuel from MEP design — refines Form 00 placeholder
utilities_fuel:
e.g. gas / oil / electric
Number of HVAC zones
zone_count:
Total HVAC tonnage from equipment schedule
equipment_tonnage:
HVAC duct type
duct_type:
e.g. rigid / flex / combination
§ 02Plumbing
Feeds: P2W02-PLUMBING
Number of wet bars with plumbing
wet_bar_count:
Laundry room sink included
laundry_sink:
e.g. yes / no
Number of exterior hose bibs
outdoor_hose_bibs:
§ 03Electrical
Feeds: P2W04-ELECTRICAL
Total light fixture count (all floors)
fixture_count_elec:
Total circuits from panel schedule
circuit_count:
§ 04MEP Finishes
Feeds: P3W14-MEP-FINISHES
Total plumbing fixtures (from selections schedule)
plumbing_fix_count:
Total light fixtures (from electrical plan)
lighting_fix_count:
Total HVAC supply / return grilles
hvac_grille_count:
observations not captured above