Fill when MEP engineering report and load calculations arrive. Resolves equipment specifications, panel sizing, and fixture schedules before P2 bidding.
Confirmed heating fuel from MEP design — refines Form 00 placeholder
utilities_fuel:
e.g. gas / oil / electric
Total HVAC tonnage from equipment schedule
HVAC duct type
duct_type:
e.g. rigid / flex / combination
Number of wet bars with plumbing
Laundry room sink included
laundry_sink:
e.g. yes / no
Number of exterior hose bibs
Total light fixture count (all floors)
Total circuits from panel schedule
Total plumbing fixtures (from selections schedule)
Total light fixtures (from electrical plan)
Total HVAC supply / return grilles
observations not captured above