Fill when environmental survey results and permit determinations arrive. Required before demolition starts and before insulation is specified. Hazmat scope here resolves the flag set in Form 00 / Form 01. Tank removal confirms the Form 00 / Form 01 oil tank flag.
Tree removal permit required by municipality
permit_tree:
e.g. yes / no
Oil tank removal required
tank_removal:
e.g. yes / no
Hazmat abatement scope (from survey results)
hazmat_scope:
e.g. none / encapsulation / full removal
Required R-values by zone from energy code
observations not captured above