VG Estimating · Capture Form · Form 02

Structural Engineering Foundation · Framing · Beams · Insulation

Fill at
Structural engineering report delivery
Filled by
PM
Date
2026-05-04
Status
Draft 1
Fill when structural engineering report arrives. Resolves scope for foundation, framing, and beam work. Required before P1 bidding begins.
Property address
Date
PM / person capturing
§ 01P1WO4 — Site Work
Feeds: P1WO4 (Site Work)
Linear feet of retaining wall
retaining_wall_lnft
§ 02P1WO5 — Foundation & Drainage
Feeds: P1WO5 (Foundation & Drainage)
Linear feet of drainage system
drainage_lnft
Waterproofing system scope
waterproofing_type
e.g. interior / exterior / both
Required frost depth / engineer spec
footing_depth
Height of new foundation walls
foundation_wall_ht
§ 03P1WO6 — Framing
Feeds: P1WO6 (Framing)
Engineered beams (LVL / steel)
beam_count
Trusses in scope — yes/no and type
truss_plan
e.g. yes - roof / yes - floor / yes - both / no
Count of new structural openings
major_openings
§ 04P2WO7 — Insulation & Soundproofing
Feeds: P2WO7 (Insulation & Soundproofing)
Linear feet of rim joist to insulate
rim_joist_lnft
observations not captured above