VG Estimating · Capture Form · Form 04

MEP Engineering HVAC · Plumbing · Electrical · MEP finishes

Fill at
MEP engineering report delivery
Filled by
PM
Date
2026-05-04
Status
Draft 1
Fill when MEP engineering report and load calculations arrive. Resolves equipment specifications, panel sizing, and fixture schedules before P2 bidding.
Property address
Date
PM / person capturing
§ 01P2WO3 — HVAC
Feeds: P2WO3 (HVAC)
Confirmed heating fuel from MEP design — refines Form 00 placeholder
utilities_fuel
e.g. gas / oil / electric
Number of HVAC zones
zone_count
Total HVAC tonnage from equipment schedule
equipment_tonnage
HVAC duct type
duct_type
e.g. rigid / flex / combination
§ 02P2WO2 — Plumbing
Feeds: P2WO2 (Plumbing)
Number of wet bars with plumbing
wet_bar_count
Laundry room sink included
laundry_sink
e.g. yes / no
Number of exterior hose bibs
outdoor_hose_bibs
§ 03P2WO4 — Electrical
Feeds: P2WO4 (Electrical)
Total light fixture count (all floors)
fixture_count_elec
Total circuits from panel schedule
circuit_count
§ 04P3WO14 — MEP Finishes
Feeds: P3WO14 (MEP Finishes)
Total plumbing fixtures (from selections schedule)
plumbing_fix_count
Total light fixtures (from electrical plan)
lighting_fix_count
Total HVAC supply / return grilles
hvac_grille_count
observations not captured above