VG Home Buyers · Acquisition · Property Intake · Draft 3

Property Intake Checklist
what to capture, when, and why

Use at  Offer · Contract · Purchase
Filled by  Shlomo + Andrew (PM)
Status  Draft 3
Date  2026-05-01
Capture form  Form 00

Capturing the right variables at acquisition is the single highest-leverage act in a project. These inputs drive every Phase 1–3 estimate, set Andrew's pre-approved budget, and determine the accuracy of every cost projection that follows. A complete intake takes less than an hour and saves dozens of judgment calls downstream.

Step 1 — At offer
Property Basics + Deal Terms
Shlomo provides · Andrew estimates
Step 2 — Under contract
Condition Assessment + Legal & Zoning
Andrew (PM) — inspection · Shlomo / title / assessor
Step 3 — At purchase
Phase Scope + Pre-Approved Budget
Andrew confirms · Shlomo approves budget
§ 01 · At offer

Property basics & deal terms
the variables that drive every formula

Property identity & dimensions Shlomo / MLS / assessor
property_address
sqft_total all levels combined → holding costs, overhead
sqft_above_grade conditioned above-grade area → framing, HVAC, painting, drywall
stories
1 1.5 2 3
→ framing, HVAC zoning, stairs
lot_sqft total lot area → landscape, driveway, fencing
full_bath_count → plumbing, tile, accessories
half_bath_count → plumbing fixtures
kitchen_count note ADU kitchens separately → cabinets, plumbing, appliances
Deal terms & financing Shlomo
purchase_price final contracted price — 12.x
loan_amount hard money / construction loan — 13.x
interest_rate annualized, for holding cost calc
monthly_holding_rate taxes + utilities + insurance + lawn
§ 02 · Under contract — PM walkthrough

Condition assessment
Andrew's site evaluation

Structure & shell condition Andrew (PM) — physical inspection
demo_scope
partial (0.6×) selective (0.8×) full (1.0×)
→ demolition estimate (32.x)
foundation_type
existing new repair
→ foundation estimate (42.x) · canonical: existing / new / repair
pitch
flat (1.0) 4:12 (1.05) 6:12 (1.12) 8:12 (1.19) 12:12 (1.41)
→ roofing multiplier (53.x)
material
shingle (1.0) flat-TPO (0.9) metal (1.8)
→ roofing material rate (53.x) · owner-confirmed in Form 08
sqft_footprint building footprint (roof plan area) → foundation + roofing takeoff
addition
yes no
→ framing complexity (52.x)
window_count → windows estimate (54.x)
window_grade
standard premium custom
→ windows unit rate
ext_door_count exterior doors only — not garage → exterior doors (54.x)
garage_door_count overhead garage doors → garage door cost (54.x)
siding_type
vinyl fiber cement wood
→ siding material rate (58.x)
Systems condition Andrew (PM) — systems assessment
hvac_scope
repair (0.3×) replace (1.0×) new (1.2×)
→ HVAC estimate (62.x)
system_type
central mini-split dual
→ HVAC system multiplier
panel_upgrade
yes no
→ electrical estimate (64.x)
service_size
100A 200A 400A
→ electrical service cost
Legal, zoning & property characteristics Shlomo / title search / assessor / physical inspection
block_lot_taxmap block, lot, and tax map number → required on permit application
zone R1 / R2 / B1 / etc. → setbacks, height limits, use restrictions
flood_zone_status
X (minimal) AE AO VE
→ may restrict design, add insurance
easement_status
none yes — note type
→ affects buildable area + site plan
historic_status
none contributing designated
→ may restrict exterior changes
steep_slope / wetlands
neither steep slope wetlands both
→ environmental review required
legal_residences existing / proposed → zoning compliance + permit category
garage_status
none 1-car 2-car
attached detached
→ parking compliance, framing scope
ceiling_heights bsmt / 1st floor / 2nd floor / attic → required for IHA elevation drawings
utilities_water
city well
→ plumbing scope, permit type
utilities_sewer
city septic
→ plumbing scope, ejector pump
utilities_fuel
gas oil electric
→ HVAC system selection (62.x)
driveway_status
dedicated shared none
→ site plan, parking count
lot_dimensions frontage × depth (ft) → setback compliance, site plan
§ 03 · At purchase — PM + Owner

Phase scope & PM timeline
locking what's in and out before estimates run

Projected timeline Andrew (PM) — construction duration estimate
months_holding PM's projected construction duration → holding cost total: months × monthly_rate — 14.x
construction_start_date estimated
Phase scope matrix Andrew (PM) confirms · Shlomo approves budget
Phase Work included In scope?
P1 — Shell Demo · Foundation · Framing · Roofing · Windows · Siding
InOut
P2 — Systems HVAC · Plumbing · Electrical · Insulation · Drywall · Exterior
InOut
P3 — Finishes Tile · Flooring · Cabinets · Carpentry · Painting · Appliances
InOut
P3 — Specialty Trim Coffered ceilings · Wainscoting · Built-ins · Shiplap · Beams
InOut
P2 — Exterior Deck · Patio · Driveway · Landscape · Fencing
InOut
A complete intake unlocks
what becomes possible once all fields are filled
Estimate
Full P0–P3 cost estimate

Every WO formula in the cost model can run. No WO left at "rough guess."

Approval
Andrew's pre-approved budget

Andrew signs off on scope by phase. His compliance gate during construction becomes a fast verification, not a fresh decision.

Cash flow
Holding cost projection

months × monthly_rate — P0WO14. Cash flow planning possible from day one.

AP
Vendor assignments can begin

Scope confirmed → SOW requests go out → VPT rows can be created before invoices arrive.

Benchmark
Variance analysis at close

P0 estimate vs. P4 actuals — which WOs ran over, which came in under. Only meaningful if P0 was detailed.

Library
Cost library improvement

Actuals feed back against clearly-defined P0 inputs, improving rate calibration for every future property.

Most critical

sqft_above_grade and stories appear in more cost formulas than any other variable — framing, HVAC, drywall, painting, electrical. A 10% error in above-grade sqft at offer cascades through every construction estimate. Measure or confirm from plans before finalizing the estimate, not from MLS data.