🏗 Cost Code Change SOP (Home Construction)

🔁 Overview

When updating product/service cost codes in our business, all changes must be reflected in:

We recognize three types of changes:


✅ Step 1: Determine the Change Type

Change Type Purpose Examples Action Required
New Add a code for a new type of work or more granular tracking Smart Home Integration Add in QBO, CoConstruct, Sheets
Combine Merge multiple codes into one for simplification Framing Labor + Framing MaterialsFraming Map and reassign entries
Inactivate Remove obsolete or unused codes Satellite Dish Wiring Confirm no active use, then archive

⚙️ Step 2: Implement in QuickBooks

A. For All Change Types

B. If New

C. If Combining

D. If Inactivating


📊 Step 3: Update Google Sheets

A. Cost Code Resource Tabs

B. Remap Entries

C. Validate Integrity


🧱 Step 4: Sync to CoConstruct

A. Cost Catalog & Estimate Templates

B. Active Projects


📣 Step 5: Final Review & Communication

A. Final Checks

B. Communicate to Team


🧾 Mapping Table Template

Old Code New Code Change Type Reason Notes QB Updated? Sheets Updated? CoConstruct Updated?
1700 - Framing Labor 2000 - Framing Combine Simplified tracking Merged w/ Materials

📌 Checklist Summary