VG Reference Document

Work Order Packets Master

Master reference for all VG work order packet content and structure

Source: reference/operations/estimating/work-order-packets-master.md Generated: 2026-06-01

VG Work Order Packets — Master Index

This file is a navigation index and cost-code reference for all 38 WO packets.

Authoritative source for estimating variables: Individual packet files at workspaces/estimating/work-order-packets/phase-{1,2,3}/. Do not maintain variable tables here — they drift. Read the individual packet for Stage 1 / Stage 2 input tables.

INPUTS tab schema: workspaces/estimating/inputs-tab-spec.md Formula layer: workspaces/estimating/formula-layer-spec.md Variable registry: reference/cost-codes/intake-variable-registry.md


Phase 1 — Site, Shell & Structure

Field Manager: Hector Canales

WO Name Cost Codes Packet File
P1W01a Site Management 18.0 · 18.1 · 18.2 · 18.6 · 18.7 · 18.8 · 18.9 phase-1/P1W01a-site-management.md
P1W01b Tree Removal 88.7 · 88.8 phase-1/P1W01b-tree-removal.md
P1W02 Utility Modification / Sewer 20.0 · 22.0 · 24.x · 26.x · 28.x · 29.x phase-1/P1W02-utility-sewer.md
P1W03 Demolition 30.0 · 32.0 · 32.2 · 32.3 · 32.4 · 32.7 phase-1/P1W03-demolition.md
P1W04 Site Work (Excavation, Grading) 40.0 · 44.0–44.9 phase-1/P1W04-site-work.md
P1W05 Foundation & Drainage 42.0 · 42.1 · 42.4 · 44.2 · 44.5 phase-1/P1W05-foundation.md
P1W06 Framing 50.0 · 52.0 · 52.1 · 52.4 · 52.5 phase-1/P1W06-framing.md
P1W07 Roofing 53.0 · 53.1 · 53.4 · 53.7 phase-1/P1W07-roofing.md
P1W08 Windows & Exterior Doors & Garage 54.0 · 54.2 · 54.3 · 54.7 phase-1/P1W08-windows-doors.md
P1W09 Interior Stairs 56.0 · 56.1 · 56.4 phase-1/P1W09-interior-stairs.md
P1W10 Siding & Shutters 58.0–58.9 phase-1/P1W10-siding-shutters.md
P1W11 Gutters & Leaders 53.8 phase-1/P1W11-gutters-leaders.md
P1W12 End of Phase 1 Handoff — (process) phase-1/P1W12-phase-handoff.md

Phase 2 — Building Systems & Exterior

Field Manager: JJ Serrano

WO Name Cost Codes Packet File
P2W01 Phase 2 Pre-Takeover Walkthrough — (process) phase-2/P2W01-phase-takeover.md
P2W02 Plumbing 63.0 · 63.1 · 63.2 · 63.4 · 63.7 phase-2/P2W02-plumbing.md
P2W03 HVAC 60.0 · 62.0–62.9 phase-2/P2W03-hvac.md
P2W04 Electrical 64.0 · 64.1 · 64.2 · 64.4 · 64.7 phase-2/P2W04-electrical.md
P2W05 Security & Technology 64.3 · 64.6 · 64.8 · 65.0 phase-2/P2W05-security-tech.md
P2W06 Fireplaces 66.0 · 66.7 phase-2/P2W06-fireplaces.md
P2W07 Insulation & Soundproofing 67.0–67.7 · 68.0–68.7 phase-2/P2W07-insulation-soundproofing.md
P2W08 Drywall 69.0 · 69.1 · 69.4 · 69.7 phase-2/P2W08-drywall.md
P2W09 Exterior Carpentry & Masonry 80.0 · 82.0–82.7 · 84.0 · 84.8 phase-2/P2W09-exterior-carpentry-masonry.md
P2W10 Landscape & Grounds 88.0 · 88.7 · 88.8 phase-2/P2W10-landscaping.md
P2W11 Yard Fencing 86.0 · 86.1 · 86.4 · 86.7 phase-2/P2W11-fencing.md
P2W12 Driveway 84.7 phase-2/P2W12-driveway.md
P2W13 End of Phase 2 Handoff — (process) phase-2/P2W13-phase-handoff.md

Phase 3 — Finishes & Closeout

Field Manager: Herson Vasquez

WO Name Cost Codes Packet File
P3W01 Phase 3 Pre-Takeover Walkthrough — (process) phase-3/P3W01-phase-takeover.md
P3W02 Tile Installation 71.0 · 71.1 · 71.4 phase-3/P3W02-tile.md
P3W03 Flooring (Non-Tile) 72.0 · 72.2 · 72.3 · 72.5 · 72.6 · 72.7 phase-3/P3W03-flooring.md
P3W04 Cabinetry 73.0 · 73.1 · 73.2 · 73.4 phase-3/P3W04-cabinetry.md
P3W05 Interior Doors 74.1 phase-3/P3W05-interior-doors.md
P3W06 Closet Carpentry 74.2 · 74.5 · 74.6 phase-3/P3W06-closet-carpentry.md
P3W07 Specialty Trim 74.3 · 74.4 · 74.7 · 74.8 · 74.4a–j · 74.8a–j phase-3/P3W07-specialty-trim.md
P3W08 Painting, Wallpaper & Basic Trim 74.3 · 74.7 · 75.0–75.8 · 85.0–85.4 phase-3/P3W08-painting.md
P3W09 Countertops & Stone 73.0 · 73.4 phase-3/P3W09-countertops.md
P3W10 Stain Finishing 72.x · 75.8 phase-3/P3W10-stain-finishing.md
P3W11 Backsplash 71.1 · 71.4 phase-3/P3W11-backsplash.md
P3W12 Interior Accessories 76.0 · 76.1 · 76.4 · 76.7 phase-3/P3W12-accessories.md
P3W13 Door & Cabinet Hardware 73.x · 74.1 phase-3/P3W13-door-cabinet-knobs.md
P3W14 MEP Finishes 63.x · 62.x · 64.x phase-3/P3W14-mep-finishes.md
P3W15 Shower Glass & Mirrors 76.x phase-3/P3W15-shower-glass-mirrors.md
P3W16 Appliances 77.0 · 77.1 · 77.4 phase-3/P3W16-appliances.md
P3W17 Final Punch List 92.4 phase-3/P3W17-punch-list.md
P3W19 Interior Railing (planned) TBD (packet not yet written)