Activity Log
Mon
Fire Dept Inspection 10-12pm
Tue
Work Towards Obtaining the CO
Wed
CLOSING DATE
QB recorded · $1.71M
— seg 99: $1.26M, seg UNKNOWN: $330K · A-R General Contractor_Alberto Landscape & Snow Removal, J & M Contractors LLC — transaction dates may not match exact work timing
Mon
Work Towards Obtaining the CO
Tue
Work Towards Obtaining the CO
Wed
Work Towards Obtaining the CO
Thu
Work Towards Obtaining the CO
Fri
4th of July
QB recorded · $32K
— seg 13: $28K, seg 62: $4K · Blue Ridge Lumber, American Royal Hardware — transaction dates may not match exact work timing
Mon
Work Towards Obtaining the CO
Tue
Work Towards Obtaining the CO
Wed
Work Towards Obtaining the CO
Thu
Work Towards Obtaining the CO
Fri
Work Towards Obtaining the CO
QB recorded · $382
— seg 14: $382 · Borough of Glen Ridge — transaction dates may not match exact work timing
Mon
Prep for Electric Inspection
Tue
Prep for Electric Inspection
Wed
Prep for Electric Inspection
Thu
Final Electric Inspection 12-3pm
QB recorded · $14K
— seg 14: $10K, seg 53: $2K · PSE&G, Marcos Moncada — transaction dates may not match exact work timing
Mon
Prep for Final Inspections
Tue
Prep for Final Inspections
Wed
Prep for Final Inspections
Thu
All Final Inspections 12-3pm / Photos 3:30pm
QB recorded · $4K
— seg 75: $4K, seg 93: $360 · J & M Contractors LLC, Home Depot — transaction dates may not match exact work timing
Mon
Photos 10am
Tue
Driveway Pour
Wed
Punchlist
Thu
Punchlist
Fri
Punchlist
QB recorded · $18K
— seg 72: $4K, seg 84: $4K · Blue Ridge Lumber, Buildesign Home Improvement, LLC — transaction dates may not match exact work timing
Mon
Spindle Install
Tue
Custom Glass Install / Balcony Railings + Siding Arrives
Wed
Balcony Railing Install / Bath Accessories
Thu
Finishes Install
Fri
Cleaning
QB recorded · $27K
— seg 58: $11K, seg 77: $6K · Jaeger Lumber, Blue Ridge Lumber — transaction dates may not match exact work timing
Mon
Shoe Molding / 2nd Coat of Paint / Finishes
Tue
Shoe Molding / 2nd Coat of Paint / Finishes
Wed
Spindle Install / 2nd Coat of Paint / Finishes
Thu
Appliance Delivery / Bevel Siding Arrives
Fri
Appliance / Finishes / 2nd Coat of Paint
QB recorded · $26K
— seg 75: $8K, seg 77: $6K · Jaeger Lumber, Carlos Painting LLC — transaction dates may not match exact work timing
Mon
Finish the Floors / Alberto Install Deck Pavers
Tue
Finish the Floors
Wed
Finish the Floors
Thu
Shoe Molding / 2nd Coat of Paint / Prep for Fiberglass
Fri
Shoe Molding / 2nd Coat of Paint / Fiberglass Deck
QB recorded · $20K
— seg 58: $11K, seg 63: $4K · Jaeger Lumber, Home Depot — transaction dates may not match exact work timing
Mon
Paint
Tue
Paint
Wed
Complete 1st Coat of Paint
Thu
Finish the Floors
Fri
Finish the Floors
QB recorded · $7K
— seg 82: $3K, seg 74: $1K · Jaeger Lumber, Ashpa Management — transaction dates may not match exact work timing
Mon
Paint Prep / Order Decking and Siding / Post and Railing Install
Tue
Paint Prep / Post and Railing Install
Wed
Paint Prep / Decking
Thu
Paint Prep / Decking
Fri
Paint Prep / Decking
QB recorded · $31K
— seg 13: $27K, seg 74: $2K · J & M Contractors LLC, Thomas Klink - — transaction dates may not match exact work timing
Mon
Paint Prep
Tue
Paint Prep
Wed
Finish Interior Trim / Paint Prep
Thu
Finish Interior Trim / Paint Prep
Fri
Paint Prep / Decking / Siding
QB recorded · $10K
— seg 74: $5K, seg 75: $1K · J & M Contractors LLC, Jaeger Lumber — transaction dates may not match exact work timing
Mon
Patch the Floors / Prep for Painters
Tue
Finish Trim and Prep for Painters
Wed
Begin Paint Prep
Thu
Paint Prep
Fri
Paint Prep
QB recorded · $8K
— seg 73: $3K, seg 74: $3K · Jaeger Lumber, J & M Contractors LLC — transaction dates may not match exact work timing
Mon
Spackle Finish Coat
Tue
Sand Spackle Down
Wed
Reinstall Trim and Cabinets
Thu
Reinstall Trim and Cabinets
Fri
Begin Paint Prep
QB recorded · $14K
— seg 52: $4K, seg 16: $4K · J & M Contractors LLC, Jaeger Lumber — transaction dates may not match exact work timing
Mon
Nilson Review Attic Flooring
Tue
Framing Modifications
Wed
Framing Modifications
Thu
Fix Insulation and Sheetrock
Fri
Sheetrock and Spackle 1st Coat
QB recorded · $6K
— seg 74: $2K, seg 63: $1K · J & M Contractors LLC, Ashpa Management — transaction dates may not match exact work timing
Mon
Framing Modifications
Tue
Framing Modifications
Wed
Framing Modifications
Thu
Sheetrock / Spackle & Trim / Tile / Cabinet Install
Fri
Sheetrock / Spackle & Trim / Tile / Cabinet Install
QB recorded · $7K
— seg 71: $2K, seg 13: $2K · Jaeger Lumber, Blue Ridge Lumber — transaction dates may not match exact work timing
Mon
Engineer's Review
Tue
Engineer's Review
Wed
Framing Modifications
Thu
Arch and Engineer Onsite with Hector and JJ 2pm
Fri
Trim / Tile / Cabinet Install
QB recorded · $6K
— seg 71: $3K, seg 69: $2K · Jaeger Lumber, Buildesign Home Improvement, LLC — transaction dates may not match exact work timing
Mon
Trim, Tile, Cabinet Install
Tue
Trim, Tile, Cabinet Install
Wed
Trim, Tile, Cabinet Install
Thu
Trim, Tile, Cabinet Install
Fri
Paint Prep
QB recorded · $13K
— seg 52: $4K, seg 72: $2K · Jaeger Lumber, Ashpa Management — transaction dates may not match exact work timing
Mon
Framing Edits
Tue
Framing Edits
Wed
Framing Edits
Thu
Trim, Tile, Cabinet Install
Fri
Trim, Tile, Cabinet Install
QB recorded · $8K
— seg 73: $2K, seg 52: $2K · Jaeger Lumber, Home Depot — transaction dates may not match exact work timing
Mon
Interior Stairs Arrive
Tue
Stair / Cabinet / Trim Install
Wed
Cabinet / Trim Install
Thu
Interior Doors Arrive
Fri
Door / Trim / Cabinet Install
QB recorded · $81K
— seg 13: $81K, seg 73: $211 · Jaeger Lumber, Thomas Klink - — transaction dates may not match exact work timing
Mon
Cabinet Install
Tue
Interior Trim Arrives
Wed
Cabinet and Trim Install
Thu
Cabinet and Trim Install
Fri
Cabinet and Trim Install
QB recorded · $19K
— seg 69: $13K, seg 74: $6K · Jaeger Lumber, Doctor Drywall — transaction dates may not match exact work timing
Mon
Spackle / Floor Prep
Tue
Floor Install
Wed
Floor Install
Thu
Floor Install
Fri
Cabinets Arrive
QB recorded · $21K
— seg 73: $7K, seg 74: $5K · Ashpa Management, Home Depot — transaction dates may not match exact work timing
Mon
Spackle
Tue
Spackle
Wed
Spackle / Floor Delivery
Thu
Spackle
Fri
Floor Install
QB recorded · $7K
— seg 72: $6K, seg 74: $713 · Jaeger Lumber, Advanced Flooring, LLC — transaction dates may not match exact work timing
Mon
Basement Insulation / Sheetrock Other Floors
Tue
Insulation Inspection (Basement)
Wed
Sheetrock
Thu
Sheetrock
Fri
Sheetrock
QB recorded · $2K
— seg 67: $1K, seg 52: $515 · J & M Contractors LLC, Doctor Drywall — transaction dates may not match exact work timing
Mon
Sheetrock
Tue
Electric Inspection (Basement)
Wed
Basement Insulation / Sheetrock
Thu
Basement Insulation / Sheetrock
Fri
Basement Insulation / Sheetrock
QB recorded · $11K
— seg 69: $8K, seg 52: $3K · Ashpa Management, Bergen-Essex Contractors Inc — transaction dates may not match exact work timing
Mon
Insulation
Tue
Insulation
Wed
Insulation
Thu
Insulation Inspection
Fri
Sheetrock
QB recorded · $16K
— seg 52: $7K, seg 67: $5K · Ashpa Management, Bergen-Essex Contractors Inc — transaction dates may not match exact work timing
Mon
Electric
Tue
Electric
Wed
Electric
Thu
Electric Inspection
Fri
Insulation
QB recorded · $6K
— seg 62: $4K, seg 54: $3K · Blue Ridge Lumber, Rosario AC & Heating — transaction dates may not match exact work timing
Mon
Electric
Tue
Electric Inspection?
Wed
Electric Inspection?
Thu
Electric Inspection?
Fri
Insulation
QB recorded · $36K
— seg 54: $24K, seg 52: $4K · Blue Ridge Lumber, Ashpa Management — transaction dates may not match exact work timing
Mon
HVAC/Electric/Plumbing
Tue
HVAC/Electric/Plumbing
Wed
HVAC/Electric/Plumbing
Thu
Rough Inspections
Fri
Insulation
QB recorded · $30K
— seg 52: $15K, seg 63: $10K · Blue Ridge Lumber, Rosario AC & Heating — transaction dates may not match exact work timing
Mon
HVAC/Electric/Plumbing
Tue
HVAC/Electric/Plumbing
Wed
HVAC/Electric/Plumbing
Thu
HVAC/Electric/Plumbing
Fri
HVAC/Electric/Plumbing
QB recorded · $19K
— seg 62: $11K, seg 14: $7K · Ashpa Management, Simple Tank Services — transaction dates may not match exact work timing
Mon
PVC Install
Tue
PVC Install
Wed
Begin HVAC
Thu
HVAC
Fri
HVAC
QB recorded · $9K
— seg 52: $5K, seg 53: $3K · Bergen-Essex Contractors Inc, Blue Eagle Construction LLC — transaction dates may not match exact work timing
Mon
Basement Framing
Tue
Basement Framing
Wed
PVC Install
Thu
PVC Install
Fri
PVC Install
QB recorded · $20K
— seg 52: $8K, seg 42: $4K · Ashpa Management, Bergen-Essex Contractors Inc — transaction dates may not match exact work timing
Mon
Pour Footings / Basement slab prep
Tue
Finish Back Deck Framing / Basement Slab Prep
Wed
Roof Install / Basement Slab Prep
Thu
Basement Slab Inspection / Deck Framing Inspection / Slab Plumbing
Fri
Pour Basement Slab
QB recorded · $5K
— seg 42: $3K, seg 32: $1K · Quick Concrete Ready Mix, Eduar Raudales — transaction dates may not match exact work timing
Mon
Basement slab removal
Tue
Basement slab removal
Wed
Slab and Deck Footing Prep
Thu
Deck Footing Inspection
Fri
Slab and Deck Footing Prep
QB recorded · $5K
— seg 53: $5K, seg 18: $915 · Ashpa Management, National Building Supply — transaction dates may not match exact work timing
Mon
Framing
Tue
Framing
Wed
Framing
Thu
Framing
Fri
Begin bsmt slab and pier footing
QB recorded · $18K
— seg 52: $10K, seg 32: $8K · Bergen-Essex Contractors Inc, J & J Demo LLC — transaction dates may not match exact work timing
Mon
Framing
Tue
Framing
Wed
Framing
Thu
Framing
Fri
Framing
Mon
Framing
Tue
Framing
Wed
Framing
Thu
Framing
Fri
Framing
QB recorded · $220
— seg 64: $220 · Marcos Moncada — transaction dates may not match exact work timing
Mon
Door / Trim / Cabinet / Tile Install
Tue
Door / Trim / Cabinet / Tile Install
Wed
Meet Rob Onsite 9am
QB recorded · $3K
— seg 16: $3K · Garfinkel Design Group LLC — transaction dates may not match exact work timing
Mon
Door / Trim / Cabinet / Tile Install
Tue
Door / Trim / Cabinet / Tile Install
Wed
Door / Trim / Cabinet / Tile Install
Mon
Door / Trim / Cabinet Install
Tue
Door / Trim / Cabinet Install
Wed
Door / Trim / Cabinet Install
Mon
Interior Doors Arrive
Tue
Door / Trim / Cabinet Install
Wed
Door / Trim / Cabinet Install