Construction Total
$629,823 $1,334,600 +$704,777 47%
Segments:
16 Project Prep last: 2026-03-25
$28,600* -$5,696 120%
$34,296
16.7 Architectural Plans
$17,511
Date Vendor Description Class Amount
2025-09-04 Garfinkel Design Group LLC 185F. Architectural Plans. $4,000
2025-09-26 Garfinkel Design Group LLC 185F. Architectural Plans. $5,000
2025-10-06 Garfinkel Design Group LLC 185F. Architectural Plans. $5,950
2025-12-04 Garfinkel Design Group LLC 185F. Shipping fee $79
2026-01-15 Garfinkel Design Group LLC 185F. Pergola Revisions & Printing $1,470
2026-02-24 Staples Receipts for Blueprints $139
2026-02-27 Garfinkel Design Group LLC 185F. Revision & Printing $820
2026-03-25 Staples Receipt for Shower Elevations Printing $54
16.8 Permits
$15,736
Date Vendor Description Class Amount
2025-05-07 Township of Montclair Interior Demo Permit $103
2025-05-22 Township of Montclair Plumbing Permit $600
2025-05-22 Township of Montclair Electrical Permit $500
2025-10-10 Township of Montclair 185F. Zoning Permit Apllication Fee $50
2025-11-21 PVSC 185F. PVSC Application (Garage ADU) Fee $0
2025-11-26 PVSC 185F. PVSC Application (Garage ADU) Fee $829
2025-12-04 Township of Montclair 185F. Construction Permit Fee $12,685
2025-12-24 Buildesign Home Improvement, LLC 185F. Plumbing Permit Update (Yover - Garage Plumbing): $300185 $300
2026-03-13 Township of Montclair 185F_Covered Porch Permit $669
16.1 Surveys
$925
Date Vendor Description Class Amount
2025-05-01 Safehouse Title Agency LLC Hud line 1304. Survey Fee to Morgan Engineering & Surveying LLC $925
10 - Buying, Holding, and Site Management:16 Project Prep:16.7 Architectural Plans
$124
Date Vendor Description Class Amount
2025-11-14 Staples 185F. Receipt for Architectural Plans $124
18 Site Management last: 2026-06-17 L $618
$98,900* +$40,779 59%
$58,121
10 - Buying, Holding, and Site Management:18 Site Management:18.9 Site Supervision
$33,783
Date Vendor Description Class Amount
2025-05-28 Buildesign Home Improvement, LLC Project Supervision_Hector_Wk 5.19-5.25.25(Met with Andrew and demolition guy) $38
2025-06-11 Buildesign Home Improvement, LLC Project Supervision_Hector_Wk of 2025.06.11(Check Demolition work) $75
2025-06-25 Buildesign Home Improvement, LLC Project Supervision_Hector_Wk 6.16-6.22.2025(Check Demolition work) $38
2025-07-02 Buildesign Home Improvement, LLC Project Supervision_Hector_Wk of 6.23-6.29.25.(Check Demolition Labor) $188
2025-07-09 Buildesign Home Improvement, LLC Project Supervision_Hector_Wk of 6.30-7.06.25(Checks demolition) $38
2025-08-06 Buildesign Home Improvement, LLC Project Supervision_Hector_Wk. 7.27-8.3.25(Shut off / Cut sprinkler system) $150
2025-08-20 Buildesign Home Improvement, LLC Project Supervision_Hector(Check existing signs and demolition) $75
2025-10-22 Buildesign Home Improvement, LLC Project Supervision_Hector_Wk 10.13-19.25(Covered the roof chimnies holes) $112
2025-10-29 Buildesign Home Improvement, LLC Project Supervision_Hector_ Wk 10.20-26.25(Check demolition / Met with Andrew and Rob) $75
2025-11-19 Buildesign Home Improvement, LLC Project Supervision_Hectoer_Wk 11.10-11.16.25(Check the work and go to get the sign and stamp electrical permit) $112
2025-11-26 Buildesign Home Improvement, LLC Project Supervision_Hector_Wk 11.17-11.23.25(Check foundation works / Met with plumber guy) $262
2025-12-03 Buildesign Home Improvement, LLC Project Supervision_Hector_Wk 11.24-11.30.25.(Check work/ Worked with the plumber guys) $300
2025-12-10 Buildesign Home Improvement, LLC Project Supervision_Hector_12.1-12.7.25( Check the work with the mason guys / Check the work) $225
2025-12-17 Buildesign Home Improvement, LLC Project Supervision_Hector_Wk. 12.8-12.14.25(Check project) $38
2025-12-24 Buildesign Home Improvement, LLC Project Supervision_Hector_Wk 12.15-21.25(Worked with demolition guys,footing work and excavation guy) $525
2026-01-02 Buildesign Home Improvement, LLC Project Supervision_Wk. 2026.01.02_Check concrete work $75
2026-01-07 Buildesign Home Improvement, LLC Project Supervision_Hector_Wk 12.29.25-01.04.26(Met with Andrew and J,J / Check work) $225
2026-01-14 Buildesign Home Improvement, LLC Project Supervision_Hector_Wk 01.05-01.11.26(Check under ground plumbing/Met with Andrew for framing work) $165
2026-01-14 J & M Contractors LLC 185F_JJ Project Management_Split 1 of $5500 $3,025
2026-01-21 Buildesign Home Improvement, LLC Project Supervision_Hector_Wk 01.12-01.18.26(Worked with the Framing guys and electrician guy) $495
2026-01-28 Buildesign Home Improvement, LLC Project Supervision_Hector_ Wk 01.19-01.25.26(Check framing and backfill) $371
2026-01-30 J & M Contractors LLC 185F_JJ Project Management_Split 3 of $4K $1,833
2026-02-04 Buildesign Home Improvement, LLC Project Supervision_Hector_Wk. 01.26-02.01.26(Check framing work) $82
2026-02-11 Buildesign Home Improvement, LLC Project Supervision_Hector_Wk 2.2.26-2.8.26(Check framing work) $454
2026-02-18 Buildesign Home Improvement, LLC Project Supervision_Hector_Wk 2.9.26-2.15.26(Check Framing Work) $578
2026-02-24 J & M Contractors LLC 185F_Project Supervision Split 1 of $2500 O-Wk $800
2026-02-24 J & M Contractors LLC 185F__Project Supervision Split 1 of $2500 WK 3 $875
2026-02-24 J & M Contractors LLC 185F__Project Supervision Split 1 of $2250 $698
2026-02-24 J & M Contractors LLC 185F_Project Supervision Split 1 of $2000 $840
2026-02-25 Buildesign Home Improvement, LLC Project Supervision_Hector_Wk 2.16.26-2.22.26|A(Check Framing work) $701
2026-03-04 Buildesign Home Improvement, LLC Project Supervision_Hector_Wk of 2.23.26-3.1.26( Check framing ) $330
2026-03-11 Buildesign Home Improvement, LLC 2026-03-02 | Hector (N2) | 2h: Check framing 2026-03-03 | Hector (N2) | 1h: Check framing 2026-03-05 | Hector (N2) | 2h: Check existing framing details 2026-03-07 | Hector (N2) | 2h: Check framing $289
2026-03-18 Buildesign Home Improvement, LLC 2026-03-09 | Hector (N2) | 2h: Check framing issue with the framing guys 2026-03-10 | Hector (N2) | 2h: Met with Andrew to check extras on framing 2026-03-11 | Hector (N2) | 4h: Check framer issue in the attic 2026-03-12 | Hector (N2) | 3h: Check framing work 2026-03-14 | Hector (N2) | 2h: Check framing work $536
2026-03-25 Buildesign Home Improvement, LLC 2026-03-16 | Hector (N2) | 2h: Check framing work 2026-03-17 | Hector (N2) | 2h: Met with architect to check attic issues 2026-03-18 | Hector (N2) | 2h: Met with framing guys 2026-03-19 | Hector (N2) | 2h: Check framing work 2026-03-20 | Hector (N2) | 4h: Check framing and footing inspection 2026-03-21 | Hector (N2) | 2h: Check framing $578
2026-03-26 J & M Contractors LLC 185F Site Management_22 Days $2,530
2026-03-31 Buildesign Home Improvement, LLC 2026-03-23 | Hector (N2) | 2h: Check elevation Check framing work 2026-03-24 | Hector (N2) | 1h: Met with Nestor 2026-03-26 | Hector (N2) | 2h: Check windows and framing work 2026-03-27 | Hector (N2) | 4h: Check framing and windows work 2026-03-28 | Hector (N2) | 5h: Met with plumber guy to Check me out $578
2026-04-08 Buildesign Home Improvement, LLC 2026-03-30 | Hector (N2) | 4h: Work with the framing guy 2026-03-31 | Hector (N2) | 4h: Check cosmetic Framing 2026-04-01 | Hector (N2) | 4h: Check framing and met with electrician 2026-04-02 | Hector (N2) | 2h: Check cosmetic Framing 2026-04-03 | Hector (N2) | 6h: Met with the Framing guy to check details in attic Framing details 2026-04-04 | Hector (N2) | 1h: Check plumbing work $866
2026-04-15 Buildesign Home Improvement, LLC 2026-04-06 | Hector (N2) | 3h: Met with the electrician 2026-04-07 | Hector (N2) | 2h: Check exterior framing work and electrical work 2026-04-08 | Hector (N2) | 2h: Check deck framing 2026-04-09 | Hector (N2) | 3h: Met with plumbing guy and electrician 2026-04-10 | Hector (N2) | 2h: Check open roof framing 2026-04-11 | Hector (N2) | 2h: Check open roof framing $578
2026-04-20 Buildesign Home Improvement, LLC Hecto(2)(change order ) Install attic fan .Buy materials for weld columns and hungers.Check framing Check the footing layout Check the pier’s layout Footing inspection Inspection Plumbing inspection Worked with sud contractor $784
2026-04-22 Buildesign Home Improvement, LLC 2026-04-13 | Hector (N2) | 2h: Check framing on deck 2026-04-14 | Hector (N2) | 1h: Check check roof framing 2026-04-15 | Hector (N2) | 1h: Check framing 2026-04-16 | Hector (N2) | 4h: Met with Nestor {Met with Nestor ==HVAC layout} 2026-04-17 | Hector (N2) | 4h: Met with Andrew, Nestor and JJ to check HVAC work plan $495
2026-04-25 J & M Contractors LLC 185F_Site Management 6 Full Days from 3/23/2026-3/28/2026(Split 1 of $3000) $500
2026-04-28 J & M Contractors LLC 185F_Site Supervision_18 full days_3/30/2026-4/18/2026(Split 1 of 9K) $1,000
2026-05-06 Buildesign Home Improvement, LLC Hector (N2)Check sud contractor /Met roofing guy.Herson (N2)Met with electrician, and HVAC guy $578
2026-05-06 Buildesign Home Improvement, LLC 2026-04-27 | Hector (N2) | 4h: Check framing and roof demolition 2026-04-28 | Hector (N2) | 2h: Repair existing framing 2026-04-29 | Hector (N2) | 2h: check roofing work 2026-04-30 | Hector (N2) | 5h: Framing repair and met fire place guy And stairs guy 2026-05-01 | Hector (N2) | 3h: Check check contractor 2026-05-02 | Hector (N2) | 2h: Check sud contractor wor $742
2026-05-20 Buildesign Home Improvement, LLC Herson (N2),Check subcontractors work $248
2026-05-20 Buildesign Home Improvement, LLC RFW# 8 - 185F_Herson (N2),Frame out for (5) arched openings as per the plans $330
2026-05-20 Buildesign Home Improvement, LLC RFW# 9 - 185F_Herson_“Rough Framing” - Re-frame to accommodate for the furnace in the basement, frame soffits for furnace ductwork. Re-frame in the basement to accommodate for the electric and plumbing runs. Some framing needed to be moved for installation of utilities. Leveling/adjusting the rafters for the skylights after the roofer installed them. $495
2026-05-26 J & M Contractors LLC 185F_Wk 4.20-5.16.2026 $3,375
2026-05-27 Buildesign Home Improvement, LLC Hector (N2)_Met with Drywall guy Herson (N2)_Change main water line valve Insulation inspection Met and check insulation guys met with subcontractors Chek insulation guys Met with water department guy $1,361
2026-06-03 Buildesign Home Improvement, LLC Herson (N2) Check sub contractor work Check sub contractor work and make materials list Check sub contractor work and materials list Check sub contractor work and organize materials $1,320
2026-06-10 Buildesign Home Improvement, LLC Hector (N2),Herson (N2) Check sub contractor work and make materials list,Met with Subcontractors low voltage guys,Check sud contractor work and buy materials,Pick electrical material $1,526
2026-06-17 Buildesign Home Improvement, LLC Hector (N2),Herson (N2) Check work and buy materials $1,279
10 - Buying, Holding, and Site Management:18 Site Management:18.1 Dumpsters Ongoing
$16,888
Date Vendor Description Class Amount
2026-01-29 Ashpa Management Roll Off & Dumping $888
2026-02-08 Ashpa Management Roll Off & Dumping $987
2026-02-13 Ashpa Management Dumpster Swap $780
2026-02-17 Ashpa Management Dumpster Swap $870
2026-02-20 Ashpa Management Roll Off & Dumping $828
2026-02-26 Ashpa Management Roll Off & Dumping $991
2026-03-03 Ashpa Management Roll Off & Dumping $817
2026-03-05 Ashpa Management Roll Off & Dumping $724
2026-03-13 Ashpa Management Roll Off & Dumping $892
2026-03-19 Ashpa Management 185F_Roll Off & Dumping $718
2026-03-26 Ashpa Management 185F_Roll Off & Dumping $748
2026-04-15 Ashpa Management 185F_Roll Off & Dumping $840
2026-04-16 Ashpa Management 185F_Roll Off & Dumping $796
2026-04-24 Ashpa Management 185F_Roll Off & Dumping $811
2026-05-05 Ashpa Management 185F_Roll of Service (30 yard) $800
2026-05-06 Ashpa Management 185F_Roll of Service (30 Yard) and Dumping Charge per ton $897
2026-05-14 Ashpa Management 185F_ Roll off Service (30 yard) and Dumpinmg $1,011
2026-05-21 Ashpa Management 185F_ Roll off Service (30 yard) and Dumpinmg $825
2026-05-31 Ashpa Management 185F_Roll of Service (30 Yard) and Dumping Charge per ton $743
2026-06-03 Ashpa Management 185F_Roll of Service (30 Yard) and Dumping Charge per ton $925
18.9 Site Supervision
$4,710
Date Vendor Description Class Amount
2025-12-31 J & M Contractors LLC 2025 Project Supervision $4,710
10 - Buying, Holding, and Site Management:18 Site Management:18.2 Porta Potty Rental
$1,893
Date Vendor Description Class Amount
2025-11-19 Ashpa Management 185F_Portable Comfort Station $135
2025-12-18 Ashpa Management 185_Portable Comfort Station $135
2026-01-16 Ashpa Management Portable Comfort Station $135
2026-02-15 Ashpa Management Portable Comfort Sation $135
2026-03-12 Ashpa Management Portable Comfort Station $135
2026-04-08 Ashpa Management 185F_Portable Comfort Station $135
2026-04-29 Ashpa Management 185F_Roll off Service and Dumping $848
2026-05-27 Ashpa Management 185F_Portable Comfort Station 2x per week service $235
10 - Buying, Holding, and Site Management:18 Site Management:18.4 General Project Labor
$618
Date Vendor Description Class Amount
2026-04-15 Buildesign Home Improvement, LLC 2026-04-08 | Pedro Cárdenas (N2) | 8h: Worked in clean up $228
2026-05-06 Buildesign Home Improvement, LLC Roberto (N4)Buy and Pick materials $198
2026-05-06 Buildesign Home Improvement, LLC 2026-04-27 | Nixon (N2) | 8h: Buy materials $192
10 - Buying, Holding, and Site Management:18 Site Management:18.0 Site Management
$228
Date Vendor Description Class Amount
2026-02-18 Buildesign Home Improvement, LLC 2026-02-12 | Pedro Cárdenas (N2) | 8h: Worked garage clean up $228
20 Site Systems last: 2026-01-16
$1,900* +$574 70%
$1,326
28.4 Water Line Repair
$1,326
Date Vendor Description Class Amount
2026-01-16 Ferguson Home/Ferguson 185F. Garage Water line Materials $1,326
32 Demolition last: 2026-02-25 M $2,556 L $3,310
$37,400* +$8,631 77%
$28,769
32.7 Demolition Flat Price
$19,000
Date Vendor Description Class Amount
2025-07-07 J & J Demo LLC Pmt 1- Down Payment $5,000
2025-11-14 J & J Demo LLC Pmt 4 - Complete House Demo to Studs (Pmt 1 of 2) $5,000
2025-11-28 J & J Demo LLC Pmt 2 - Demo and Dispose of the Chimneys Above the 1st floor and Through the Roof $2,500
2025-12-18 J & J Demo LLC Pmt 3 - Demo and Dispose of the Back Deck and Ramp $1,500
2025-12-18 J & J Demo LLC Pmt 4 - Complete House Demo to Studs (Pmt 2 of 2) $5,000
30 - Demolition:32 Demolition:32.3 Dumpsters For Demo Only Not Ongoing
$3,903
Date Vendor Description Class Amount
2025-12-04 Ashpa Management 185F_Roll Off Recycle $790
2025-12-18 Ashpa Management 185F_Roll Off Recycle $840
2025-12-23 Ashpa Management 185F_Roll Off Recycle $743
2025-12-23 Ashpa Management 185F_Roll Off Recycle $840
2026-01-06 Ashpa Management Roll Off Recycle $690
30 - Demolition:32 Demolition:32.4 Demolition Labor
$3,310
Date Vendor Description Class Amount
2026-02-18 Buildesign Home Improvement, LLC 2026-02-13 | Nixon (N2) | 8h: Worked demo hardwood floor and check framing work $192
2026-02-23 J & M Contractors LLC 2026-02-16 | Mario | 8h: 32.4 demolishing the wooden floors 2026-02-17 | Mario | 8h: 32.4 demolishing the wooden floor and loading the dumpster. 2026-02-18 | Mario | 8h: 32.4 demolishing the wooden floors 2026-02-19 | Mario | 8h: 32.4 demolishing the wooden floors. $880
2026-02-23 J & M Contractors LLC 2026-02-12 | Mario | 8h: 92.4 cleaning the garage and loading the dumpster. 2026-02-13 | Mario | 8h: 32.4 demolishing the wooden floors $440
2026-02-23 J & M Contractors LLC 2026-02-04 | Mario | 8h: 32.0 demolishing the chimney and loading the brick, doors, and cleaning the garage. 2026-02-04 | Ramon | 8h: 32.0 demolishing the chimney and loading the brick, doors, and cleaning the garage. $460
2026-02-25 Buildesign Home Improvement, LLC 2026-02-16 | Kristian (N2) | 8h: Worked in floor demolition 2026-02-16 | Nixon (N2) | 8h: Worked in floor demolition 2026-02-17 | Kristian (N2) | 8h: Worked in floor demolition 2026-02-17 | Nixon (N2) | 8h: Worked in floor demolition 2026-02-18 | Kristian (N2) | 8h: Worked in floor demolition 2026-02-18 | Nixon (N2) | 8h: Worked in floor demolition 2026-02-19 | Dany (N3) | 8h: Worked on floor demolition and clean up $1,338
32.2 Demo Materials/Tools/Rentals
$2,556
Date Vendor Description Class Amount
2025-12-15 Rent All Center 185F_Rental Excavator $2,100
2025-12-26 Rent All Center 185F_Rental Excavator-NO receipt yet $456
42 Foundation last: 2026-05-07 M $4,759 L $12,465
$72,900* +$55,676 24%
$17,224
42.4 Foundation Labor (Mason)
$11,415
Date Vendor Description Class Amount
2026-01-15 J & M Contractors LLC SOW1. Foundation Labor, Full Payment $2,760
2026-01-15 J & M Contractors LLC SOW2. Foundation Labor, Full Payment $2,940
2026-01-15 J & M Contractors LLC SOW3. Foundation Labor, Pmt 1 (P1o2) & Pmt 2 $1,790
2026-01-15 J & M Contractors LLC SOW4. Foundation Labor, Full Payment $1,960
2026-01-15 J & M Contractors LLC SOW5. Foundation Labor, Payment 1 $1,715
2026-04-30 J & M Contractors LLC Windows Solid. Pmt 1 - Fill (6) windows (Part 2 of 2 $250
44.2 Drainage Materials
$3,224
Date Vendor Description Class Amount
2025-11-25 E.L. Congdon & Sons Lumber Co 185F_Frence Drain Materials $2,508
2025-12-10 Home Depot 185F. Drainage Materials $269
2025-12-16 Home Depot 185F. Trench Materails $32
2026-01-12 E.L. Congdon & Sons Lumber Co 185F. Utility Trench Materials $415
40 - Foundation and Site Work:42 Foundation:42.4 Foundation Labor (Mason)
$1,050
Date Vendor Description Class Amount
2026-05-06 Buildesign Home Improvement, LLC 2026-04-27 | Dany (N3) | 8h: Install columns and finish welding 2026-04-27 | Kristian (N2) | 8h: Install columns and finish welding 2026-04-27 | Noé (N3) | 8h: Install columns and finish welding 2026-04-27 | Pedro Cárdenas (N2) | 8h: Extra footing for extra column 2026-04-27 | Roberto (N4) | 8h: Extra footing for extra column $1,050
42.1 Foundation Materials
$1,034
Date Vendor Description Class Amount
2025-12-03 Jaeger Lumber 185F_Foundation Materials $166
2025-12-09 Home Depot 185F. Foundation Materials $42
2025-12-09 American Royal Hardware 185F. Foundation Materials $25
2025-12-09 E.L. Congdon & Sons Lumber Co 185F. Foundation Materials $502
2025-12-15 E.L. Congdon & Sons Lumber Co 185F. Additional Foundation Materials $121
2026-01-09 Home Depot MAsonry/Trench $30
2026-05-07 E.L. Congdon & Sons Lumber Co 185F_RFW #1_Foundation materials $148
40 - Foundation and Site Work:42 Foundation:42.1 Foundation Materials
$501
Date Vendor Description Class Amount
2025-11-25 Jaeger Lumber 185_Foundation Material $105
2025-12-29 Jaeger Lumber 185F_Foundation Materials $119
2025-12-31 Jaeger Lumber 185F_Foundation Materials $94
2026-01-15 Jaeger Lumber 185F_Foundation Materials $184
2026-01-15 Jaeger Lumber 185F_Foundation Materials_discount on 1/26/2026 $-2
44 Site Work last: 2026-04-20 L $10,438
$17,700* +$7,042 60%
$10,658
40 - Foundation and Site Work:44 Site Work:44.4 Excavation/Backfill/Grading Labor
$5,363
Date Vendor Description Class Amount
2026-01-23 J & M Contractors LLC 185F. Inv 01.12-01.18.26 44.4 cleaning the trench and preparing for inspection $1,535
2026-01-23 J & M Contractors LLC 185F. Inv 12.29.25-01.04.26 Digging for plumbing subterranean electric pipes, and preparing for inspection $980
2026-02-23 J & M Contractors LLC 2026-01-27 | Gerardo | 8h: 44.4 backfilling the trench. 2026-01-27 | Mario | 8h: 44.4 backfilling the trench. 2026-01-27 | Ramon | 8h: 44.4 backfilling the trench. 2026-01-28 | Gerardo | 8h: 44.4 backfilling the trench and demolishing the chimney 2026-01-28 | Mario | 8h: 44.4 backfilling the trench and demolishing the chimney 2026-01-28 | Ramon | 8h: 44.4 backfilling the trench and demolishing the chimney 2026-01-29 | Mario | 8h: 44.4 backfilling the trench and loading the dumpster 2026-01-29 | Ramon | 8h: 44.4 backfilling the trench and loading the dumpster $1,920
2026-02-23 J & M Contractors LLC 2026-01-23 | Gerardo | 8h: 44.4 backfilling the trench. 2026-01-23 | Mario | 8h: 44.4 backfilling the trench. 2026-01-23 | Ramon | 8h: 44.4 backfilling the trench. $730
2026-04-20 Buildesign Home Improvement, LLC Roberto (N4) Digging for extra footing $198
44.4 Excavation/Backfill/Grading Labor
$5,075
Date Vendor Description Class Amount
2026-01-15 J & M Contractors LLC SOW1. Excavation Full Payment $4,005
2026-01-15 J & M Contractors LLC SOW2. Excavation Full Payment $1,070
40 - Foundation and Site Work:44 Site Work:44.0 Site Work
$220
Date Vendor Description Class Amount
2026-01-23 J & M Contractors LLC 185F. Inv 01.12-01.18.26 92.7 cleaning out the garage. $220
52 Framing last: 2026-06-11 M $109,454 L $109,012
$183,600* -$34,976 119%
$218,576
52.4 Framing Labor
$90,290
Date Vendor Description Class Amount
2026-01-22 Bergen-Essex Contractors Inc Pmt 1 - Down Payment $10,000
2026-01-22 Bergen-Essex Contractors Inc Pmt 5 - Basement Framing (Part 1 of 4) $6,000
2026-02-19 Bergen-Essex Contractors Inc Pmt 2 - 1st Floor Deck & Walls (Part 1 of 3) $8,250
2026-02-27 Bergen-Essex Contractors Inc Pmt 3 - 2nd Floor Deck & Walls (Part 1 of 3) $5,000
2026-02-27 Bergen-Essex Contractors Inc Pmt 5 - Basement Framing (Part 2 of 4) $2,400
2026-03-05 Buildesign Home Improvement, LLC Pmt 2 - Complete the New Back Staircase $1,200
2026-03-05 Buildesign Home Improvement, LLC Pmt 3 - Complete Interior Garage Framing. Including Shower Pan + Niche and New Collar Ties $2,000
2026-03-12 Bergen-Essex Contractors Inc Pmt 2 - 1st Floor Deck & Walls (Part 2 of 3) $1,750
2026-03-12 Bergen-Essex Contractors Inc Pmt 3 - 2nd Floor Deck & Walls (Part 2 of 3) $4,000
2026-03-12 Bergen-Essex Contractors Inc Pmt 6 - Stair Installation, Shower Pans + Niches, Windows & Exterior Door Rough Openings (Part 1 of 2) $4,000
2026-03-26 Bergen-Essex Contractors Inc Pmt 5 - Basement Framing (Part 3 of 4) $2,600
2026-03-31 Buildesign Home Improvement, LLC 185F_Windows Install_Full Payment (Part 1 of 2) $4,680
2026-03-31 Buildesign Home Improvement, LLC 185F_Back Deck Framing_Payment 1 $750
2026-04-10 Buildesign Home Improvement, LLC Framing Labor. Payment 1 - Complete leveling and smoothening of all ceilings and walls $3,205
2026-04-10 Buildesign Home Improvement, LLC Framing Labor. Payment 2 - Complete all subfloor repair and resecuring $3,205
2026-04-16 Buildesign Home Improvement, LLC Framing Labor. Pmt 2 - Complete Deck Framing $4,000
2026-04-16 Buildesign Home Improvement, LLC Framing Labor. Pmt 3 - Complete Roof Framing and Sheathing (Part 1 of 2) $4,500
2026-04-30 Buildesign Home Improvement, LLC Back Deck Framing $500
2026-04-30 Bergen-Essex Contractors Inc Pmt 2 (P3o3)First Floor Deck and Walls $1,000
2026-04-30 Bergen-Essex Contractors Inc Pmt 3 (P3o3) 2nd Floor Deck and Walls $1,000
2026-04-30 Bergen-Essex Contractors Inc Pmt 4 (Part 1 of 2) Basement Framing/stair install sheating exit door /windows $3,000
2026-04-30 Bergen-Essex Contractors Inc Pmt 4 (Part 2 of 2) Attic Deck walls/roof $5,000
2026-04-30 Bergen-Essex Contractors Inc Pmt 1-Sun room Reframing CO-Buyer Upgrade/Change Order $1,500
2026-04-30 Bergen-Essex Contractors Inc Pmt 2-Repair of Damaged floor or ceiling Joists CO-Buyer Upgrade/Change Order $2,000
2026-04-30 Bergen-Essex Contractors Inc Pmt 3-Replacement of flat 2x4 walls CO-Buyer Upgrade/Change Order $1,600
2026-04-30 Bergen-Essex Contractors Inc Replacement of the damaged kitchen areas CO-Buyer Upgrade/Change Order $2,150
2026-04-30 Bergen-Essex Contractors Inc Replacement of the damaged 2nd floor joists CO-Buyer Upgrade/Change Order $1,000
2026-05-28 Bergen-Essex Contractors Inc 185F_Framing Labor_Payment 6(2of3) $2,000
2026-06-11 Bergen-Essex Contractors Inc 185F_Framing Labor_Payment 6(3of3) $2,000
50 - Framing and Shell:52 Framing:52.1 Standard Framing Materials
$63,912
Date Vendor Description Class Amount
2026-01-12 Jaeger Lumber 185F_Framing Materials $4,655
2026-01-12 Jaeger Lumber 185F_Framing Materials_Discount on1/21/2026 $-43
2026-01-13 Jaeger Lumber 185F_Framing Materials $83
2026-01-13 Jaeger Lumber 185F_Framing Materials-Discount on 1/21/2026 $-1
2026-01-17 Jaeger Lumber 185F_Framing Materials $1,014
2026-01-17 Jaeger Lumber 185F_Framing Materials_Discount on 1/21/2026 $-10
2026-01-21 Jaeger Lumber 185F_Framing Materials $3,019
2026-01-21 Jaeger Lumber 185F_Framing Materials $149
2026-01-29 Jaeger Lumber 185F_Framing Materials $3,797
2026-02-03 Jaeger Lumber 185F_Framing Materials $2,276
2026-02-04 Jaeger Lumber 185F_Framing Materials $1,152
2026-02-06 Jaeger Lumber 185F_Framing Materials $396
2026-02-13 Jaeger Lumber 185F_Framing Materials $1,522
2026-02-17 Jaeger Lumber 185F_Framing Materials $4,265
2026-02-17 Jaeger Lumber 185F_Framing Materials $658
2026-02-17 Jaeger Lumber 185F_Framing Materials $52
2026-02-19 Jaeger Lumber 185F_Framing Materials $1,507
2026-02-27 Jaeger Lumber 185F_Framing Materials $1,909
2026-02-27 Jaeger Lumber 185F_Framing Materials $2,271
2026-02-28 Jaeger Lumber 185F_Framing Materials $629
2026-02-28 Jaeger Lumber 185F_Framing Materials $181
2026-03-06 Jaeger Lumber Framing Materials $1,144
2026-03-12 Jaeger Lumber 185F_Framing Materials $5,227
2026-03-13 Jaeger Lumber 185F_Framing Materials $277
2026-03-18 Jaeger Lumber 185F_Framing Materials $3,274
2026-03-19 Jaeger Lumber 185F_Framing Materials $91
2026-03-20 Jaeger Lumber 185F_Framing Materials $3,442
2026-03-21 Jaeger Lumber 185F_Framing Materials $615
2026-03-23 Jaeger Lumber 185F_Siding Materials $235
2026-03-23 Jaeger Lumber 185F_Siding Materials $188
2026-03-24 Jaeger Lumber 185F_Framing Materials $1,951
2026-03-25 Jaeger Lumber 185F_Framing Materials $345
2026-03-25 Jaeger Lumber 185F_Framing Materials $1,276
2026-03-25 185F_REFUND_Framing materials_Credit Note# 157822 $-254
2026-03-26 Jaeger Lumber 185F_Framing Materials $626
2026-03-26 Jaeger Lumber 185F_Framing Materials $5,717
2026-03-28 Jaeger Lumber 185F_Framing Materials $91
2026-03-30 Jaeger Lumber 185F_Framing Materials $443
2026-04-03 Jaeger Lumber 185F_Framing Materials $416
2026-04-15 Jaeger Lumber 185F_Framing Materials $85
2026-04-16 185F_REFUND_Framing materials_Credit Note# 158624 from Invoice# 2516731 $-39
2026-04-18 Jaeger Lumber 185F_Framing Materials $1,310
2026-04-23 Jaeger Lumber 185F_Framing Materials $2,356
2026-04-24 Jaeger Lumber 185F_Framing Materials $660
2026-04-27 Jaeger Lumber 185F_Framing Materials $548
2026-04-27 Jaeger Lumber 185F_Framing Materials $1,130
2026-04-27 Jaeger Lumber 185F_Framing Materials $401
2026-04-28 Jaeger Lumber 185F_Framing Materials $198
2026-04-30 Jaeger Lumber 185F_Framing Materials $734
2026-05-04 Jaeger Lumber 185F_Standard Framing Materials $237
2026-05-08 Jaeger Lumber 185F_Standard Framing $173
2026-05-11 Jaeger Lumber 2X4X10 #2 & BTR PREMIUM DOUG FIR,2X6X10 #2 & BTR PREMIUM DOUG FIR,- 2X8X10 #2 & BTR. DOUG FIR,- 4X8-23/32 [3/4] CDX FIR $514
2026-05-12 Jaeger Lumber Standard Framing Material $311
2026-05-26 Jaeger Lumber Standard Framing Material $444
2026-06-01 Jaeger Lumber 185F_Standard Framing $44
2026-06-04 Jaeger Lumber 185F_Standard Framing Materials $225
52.1 Standard Framing Materials
$24,253
Date Vendor Description Class Amount
2025-11-28 Home Depot 185F. Framing Materials $276
2025-12-01 Home Depot 185F. Framing Materials $32
2025-12-12 Home Depot 185F. Framing Materials $55
2025-12-17 Jaeger Lumber 185F_Framing Materials $394
2025-12-29 Woodhaven Lumber & Millwork 185F_PSL $16,424
2026-01-14 R. S. Phillips Steel, LLC 185F. Bolts & Nuts $3,080
2026-01-28 RS PHILLIPS STEEL 185F_Bolts to secure nailers $578
2026-03-30 Woodhaven Lumber & Millwork PSL list for attic revisions and the back deck roof $3,413
50 - Framing and Shell:52 Framing:52.4 Framing Labor
$18,722
Date Vendor Description Class Amount
2026-03-25 Buildesign Home Improvement, LLC 2026-03-21 | Nixon (N2) | 8h: Worked grinding in the back deck $192
2026-04-08 Buildesign Home Improvement, LLC 2026-03-30 | Nixon (N2) | 8h: Worked in clean crawlspace 2026-03-30 | Pedro Cárdenas (N2) | 8h: Worked in clean crawlspace 2026-03-31 | Nixon (N2) | 8h: Worked in clean nails wall and ceiling 2026-03-31 | Pedro Cárdenas (N2) | 8h: Worked in clean nails wall and ceiling $840
2026-04-20 Buildesign Home Improvement, LLC Dany (N3) Worked in framing changes for plumbing and HVAC/Herson (N2) Framing arch/Kristian (N2) Worked in framing changes HVAC /Nixon (N2) Worked attached steel plate to the beam /Noé (N3)Worked on install structural hangers /Pedro Cárdenas (N2)Worked attached steel plate to the beam/Roberto (N4) Install plywood on new shed dormer $4,194
2026-04-22 Buildesign Home Improvement, LLC 2026-04-17 | Dany (N3) | 8h: Worked in framing changes for ductwork 2026-04-17 | Kristian (N2) | 8h: Worked in framing changes for ductwork 2026-04-18 | Dany (N3) | 8h: Worked in framing changes for ductwork and plumbing 2026-04-18 | Kristian (N2) | 8h: Worked in framing changes for ductwork and plumbing $780
2026-05-06 Buildesign Home Improvement, LLC RFW 1 | cost code: masonry Worked on masonry close basement windows _Dany (N3)$204.00/Herson (N2) $330.00/Kristian_$186.00/Noé (N3)$234.00 $954
2026-05-06 Buildesign Home Improvement, LLC RFW 5 | cost code: already specified as framing (not other exterior carpentry)Worked existing soffit framing repair _ Herson (N2) $330.00/Nixon (N2)$192.00/Noé (N3)$234.00/Roberto (N4)$198.00 $954
2026-05-06 Buildesign Home Improvement, LLC RFW 6 | cost code: framing Worked aesthetic framing repair in Attic _ Dany (N3)$204.00 $204
2026-05-06 Buildesign Home Improvement, LLC RFW 9 | cost code: half for plumbing and half for HVAC | split hours to 50% = plumbing + 50% = hvac Worked make holes in mason walls for plumbing and ductwork | cost code: half for plumbing and half for HVAC | split hours to 50% = plumbing + 50% = hvac_Dany (N3)_$204.00/Herson (N2)_$330.00/Nixon (N2)_$192.00_Noé (N3)$234.00 $960
2026-05-06 Buildesign Home Improvement, LLC RFW 10 | cost code: framing Framing platform and soffit in garage for furnace and ductwork _Herson (N2) $330.00/Noé (N3)$234.00 $564
2026-05-06 Buildesign Home Improvement, LLC RFW 11 | cost code: framing Worked in existing sheeting repair _Kristian (N2)$186.00/Roberto (N4)_$198.00 $384
2026-05-06 Buildesign Home Improvement, LLC 2026-04-27 | Herson (N2) | 8h: Worked framing modifications 2026-04-28 | Dany (N3) | 8h: Repair existing roof framing 2026-04-28 | Kristian (N2) | 8h: Remove insulation in the attic and clean up 2026-04-28 | Nixon (N2) | 8h: Remove insulation in the attic and clean up 2026-04-28 | Noé (N3) | 8h: Finish welding 2026-04-29 | Dany (N3) | 8h: Repair existing roof framing 2026-04-29 | Herson (N2) | 4h: Repair existing roof framing 2026-04-29 | Kristian (N2) | 8h: Repair existing roof framing 2026-04-29 | Nixon (N2) | 8h: Repair existing sud floor in attic 2026-04-29 | Noé (N3) | 8h: Repair existing sud floor in attic 2026-04-29 | Roberto (N4) | 6h: Repair existing roof framing 2026-04-30 | Herson (N2) | 8h: Existing roof framing repair 2026-04-30 | Nixon (N2) | 8h: B. Existing sud floor repair and cosmetic wall repair in attic 2026-04-30 | Roberto (N4) | 8h: Existing roof framing repair 2026-05-01 | Dany (N3) | 8h: Cosmetic framing in attic 2026-05-01 | Herson (N2) | 8h: Existing front roof framing structural repair 2026-05-01 | Kristian (N2) | 8h: Worked framing additional window in the kitchen 2026-05-01 | Nixon (N2) | 8h: Cosmetic framing in attic 2026-05-01 | Noé (N3) | 8h: Worked framing additional window in the kitchen 2026-05-01 | Roberto (N4) | 8h: Existing front roof framing structural repair 2026-05-02 | Herson (N2) | 8h: Worked reframing existing soffit around the house 2026-05-02 | Kristian (N2) | 8h: Worked reframing existing soffit around the house 2026-05-02 | Nixon (N2) | 8h: Worked reframing existing soffit around the house 2026-05-02 | Noé (N3) | 8h: Worked reframing existing soffit around the house 2026-05-02 | Roberto (N4) | 8h: Worked reframing existing soffit around the house $5,480
2026-05-20 Buildesign Home Improvement, LLC RFW# 7 - 185F_Noé (N3)_Add an additional 2-2446 window in the kitchen / eat-in area where the plans called for a coffee bar. Reframe to accommodate for a new window opening. Add new structural hangers Install the new window. Move the electric as necessary away from the new window opening. $234
2026-05-20 Buildesign Home Improvement, LLC RFW# 8 - 185F_Dany (N3),Noé (N3),Roberto (N4)_Frame out for (5) arched openings as per the plans $636
2026-05-20 Buildesign Home Improvement, LLC RFW# 9 - 185F_Kristian (N2),Nixon (N2),Noé (N3)_“Rough Framing” - Re-frame to accommodate for the furnace in the basement, frame soffits for furnace ductwork. Re-frame in the basement to accommodate for the electric and plumbing runs. Some framing needed to be moved for installation of utilities. Leveling/adjusting the rafters for the skylights after the roofer installed them. $1,155
2026-06-03 Buildesign Home Improvement, LLC RFW# 14 Herson (N2),Kristian (N2)Noé (N3) Scope of Work:1st floor family room fireplace chimney - Re-route it to terminate on the side lowbrow roof instead of through the siding of the house as shown on the plans. Frame the soffit for the duct, install fire rated insulation around the pipe, and then frame out around the termination box for the fireplace exhaust on the side lowbrow roof. Note : Noe and Herson in Framing. Kristian 4 Hours Insulation and 4 hours Framing and buy materials $657
2026-06-03 Buildesign Home Improvement, LLC RFW# 15 Dany (N3),Nixon (N2),Noé (N3 )Scope of Work: Remove the existing 2nd - attic staircase and install the new 2nd - attic staircase | Comments: Change Order. Not included in the framers SOW as our original plan was to keep the existing staircase. The existing stairs will not fit as shown on the architectural plans. We need to replace this staircase. $528
2026-06-03 Buildesign Home Improvement, LLC RFW# 15 Dany (N3) Scope of Work: Remove the existing 2nd - attic staircase and install the new 2nd - attic staircase | Comments: Change Order. Not included in the framers SOW as our original plan was to keep the existing staircase. The existing stairs will not fit as shown on the architectural plans. We need to replace this staircase. [Danny's payment was mistakenly entered under the old payroll account (Danny (2) instead of the correct payroll account Danny (N3)].He was also underpaid by $6.00 on payroll dated 06/03/2026 $6
52.3 Steel Framing Materials
$18,538
Date Vendor Description Class Amount
2025-12-23 Allied Steel Steel Framing Materials with Processing Fee $18,538
50 - Framing and Shell:52 Framing:52.2 Structural Framing Materials
$2,475
Date Vendor Description Class Amount
2026-04-24 Jaeger Lumber 185F_Framing Materials $409
2026-04-25 Jaeger Lumber 185F_Framing Materials $526
2026-04-28 Jaeger Lumber 185F_Framing Materials $198
2026-05-01 Jaeger Lumber 185F_Structural Framing $286
2026-05-01 Jaeger Lumber 185F_Structural Framing $687
2026-05-04 Jaeger Lumber 185F_Structural Framing $370
52.2 Structural Framing Materials
$277
Date Vendor Description Class Amount
2026-04-24 Woodhaven Lumber & Millwork 185F_Additional PSL's (New Window in the Kitchen) SC - Scope Changes $277
50 - Framing and Shell:52 Framing:52.0 Framing
$110
Date Vendor Description Class Amount
2026-01-23 J & M Contractors LLC 185F. Inv Inv 01.05-01.11.26 unloading framing materials from the truck. $110
53 Roofing last: 2026-06-18 M $2,650 L $7,200
$14,000* +$4,150 70%
$9,850
53.4 Roofing Labor
$7,200
Date Vendor Description Class Amount
2026-05-07 Blue Eagle Construction LLC 185F_Roofing Labor Payment 1 - Roof Repair $3,000
2026-06-18 Blue Eagle Construction LLC 185F_Roofing Labor Payment 1 - Roof Repair $4,200
53.1 Roofing Materials
$2,090
Date Vendor Description Class Amount
2026-05-08 QXO Roofing Materials $1,186.99 + tax of $78.64 $1,266
2026-05-08 SRS Building Products 185F_Garage Roof materials $301
2026-05-12 QXO 185F_Roofing Materials $194
2026-05-12 SRS Building Products 185F_Additional Roofing Materials $329
50 - Framing and Shell:53 Roofing:53.1 Roofing Materials
$560
Date Vendor Description Class Amount
2026-03-24 Jaeger Lumber 185F_Roofing Material $92
2026-05-06 Jaeger Lumber 185F_Roofing Materials $267
2026-05-11 Jaeger Lumber IceWaterShingle RESISTO-Tax Included $201
54 Windows & Exterior Doors last: 2026-05-28 M $57,486
$66,000* +$8,514 87%
$57,486
50 - Framing and Shell:54 Windows and Exterior Doors:54.2 Window Materials
$46,982
Date Vendor Description Class Amount
2026-03-23 Blue Ridge Lumber 185F_Windows $140
2026-03-23 Blue Ridge Lumber 185F_Flashing $1,379
2026-03-23 Blue Ridge Lumber 185F_Skylight Window $1,544
2026-03-23 Blue Ridge Lumber 185F_Window Materials $38,663
2026-04-27 Blue Ridge Lumber 185F_Window Materials $3,899
2026-05-07 Blue Ridge Lumber 185F_Vinyl Windows $582
2026-05-28 Blue Ridge Lumber 185F_Vinyl Windows $776
50 - Framing and Shell:54 Windows and Exterior Doors:54.3 Exterior Door Materials
$6,305
Date Vendor Description Class Amount
2026-03-23 Blue Ridge Lumber 185F_Exterior Door Materials $6,305
54.3 Exterior Door Materials
$4,100
Date Vendor Description Class Amount
2026-03-26 Grand Entry Doors Front Door $4,100
54.2 Window Materials
$99
Date Vendor Description Class Amount
2026-05-08 E.L. Congdon & Sons Lumber Co 185F_RFW #1_Basement Windows $99
56 Interior Stairs last: 2026-05-07 M $2,820
$12,500* +$9,680 23%
$2,820
56.1 Interior Stair Materials
$2,820
Date Vendor Description Class Amount
2026-05-07 J and R Railings Inc. 185_Interior Stairs Payment 1 $2,820
58 Siding & Shutters last: 2026-05-08 M $1,347
$80,200* +$78,853 2%
$1,347
58.2 Siding Materials
$1,347
Date Vendor Description Class Amount
2026-05-08 QXO Siding Materials $1263.05+Tax of $83.68 $1,347
62 HVAC last: 2026-05-28
$55,700* +$20,600 63%
$35,100
62.7 HVAC Flat Price
$34,000
Date Vendor Description Class Amount
2026-05-15 Nestor Tacconi 185F_Hvac Flat Price Payment_1 $10,000
2026-05-21 Nestor Tacconi 185F_HVAC Flat Fee Payment 3 Pass the rough Inspection $12,000
2026-05-28 Nestor Tacconi 185F_HVAC Flat Fee Payment 2 _P1of2 $12,000
62.9 HVAC Manuals
$1,050
Date Vendor Description Class Amount
2025-12-11 HVAC Experts LLC HVAC Manual J and S. $1,050
60 - Building Systems:62 HVAC:62.9 HVAC Manuals
$50
Date Vendor Description Class Amount
2025-09-29 Staples HVAC Manual Printing $50
63 Plumbing last: 2026-05-19 M $2,199 L $15,500
$93,800* +$68,170 27%
$25,630
63.4 Plumbing Labor
$10,000
Date Vendor Description Class Amount
2026-05-15 TenMen Home Improvements LLC 185F_ Plumbing Labor. Payment 1(downpayment) $10,000
63.2 Plumbing Fixtures
$6,497
Date Vendor Description Class Amount
2025-12-29 Home Depot 185F. Sump pump Materials $322
2026-01-02 Home Depot 185F. Sump pump Materials $84
2026-03-26 WaterWays Decor 185F_2nd Floor_Bathtubs, overflow & drain $3,471
2026-05-01 Etsy 185F_Powder Room Sink_Custom Marble $2,519
2026-05-19 UPS Tariff and Import Fees $100
60 - Building Systems:63 Plumbing:63.4 Plumbing Labor
$5,500
Date Vendor Description Class Amount
2025-01-06 Yover Tenezaca (Plumber) 185F. Plumbing Labor $5,500
63.1 Plumbing Rough Materials
$2,199
Date Vendor Description Class Amount
2025-11-24 Home Depot 185F. Plumbing Materials $34
2026-01-09 Home Depot Plumbing/Trench $238
2026-02-14 Home Depot Plumbing Materials $94
2026-03-26 WaterWays Decor 185_(Hydrachoice, thermostatic valve) $936
2026-03-26 Ferguson Home/Ferguson Plumbing Roughs $897
60 - Building Systems:63 Plumbing:63.7 Plumbing Rough Flat Price
$1,435
Date Vendor Description Class Amount
2026-02-20 Di Santi Mechanical Inc 185F. Plumbing Labor & Parts (Sprinkler System) $1,435
64 Electrical last: 2026-06-03 M $12,443 L $7,500
$60,600* +$36,407 40%
$24,193
64.1 Electrical Materials Rough
$12,443
Date Vendor Description Class Amount
2026-01-09 Home Depot Electrical/Trench $29
2026-04-08 Grant Supplies 185F_Electrical Materials_Rough $9,293
2026-04-14 Home Depot Electrical Materials $128
2026-05-01 Home Depot Electrical Materials $83
2026-05-05 Grant Supplies 185F_Electrical Materials $3,615
2026-05-06 Home Depot 185F_ Additional Electrical Materials Rough $449
2026-05-07 Feldman Brothers Electrical materials $192
2026-06-03 VG Builders LLC TNRX142_1000 - 14/2 ROMEX - 1,000 FT $-302
2026-06-03 VG Builders LLC TNRX122_1000 - 12/2 ROMEX - 1,000 FT $-434
2026-06-03 VG Builders LLC TNRX143_1000 - 14/3 ROMEX - 1,000 FT $-391
2026-06-03 VG Builders LLC TNRX102 - 10/2 ROMEX - 250 FT $-140
2026-06-03 VG Builders LLC CWRG6U_1_WH - RG6U COAX CABLE-1000FT WHITE $-8
2026-06-03 VG Builders LLC CW23/4PR_C6__V_1_BL - 23/4-PR CAT6 UTP CMR 1000' BLU $-33
2026-06-03 VG Builders LLC RP3GNW-NAIL-44_CA - 3G NEW CAPTIVE NAIL 44CU $-38
64.4 Electrical Labor
$7,500
Date Vendor Description Class Amount
2026-05-15 Jose Moreno (Electrician) 185F_electrical Labor Payment_1 $7,500
64.2 Electrical Fixtures
$4,249
Date Vendor Description Class Amount
2026-03-26 Ferguson Home/Ferguson Wall Mounted Widespread Bathroom Faucet $909
2026-05-06 Prestige Lighting 185F. Electrical Fixtures $3,340
65 Security & Technology
$400* +$400 0%
$0
66 Fireplaces last: 2026-06-10
$14,900* -$3,202 122%
$18,102
66.7 Fireplace Flat Price
$18,102
Date Vendor Description Class Amount
2026-05-20 Noble Builders & Fireplaces LLC 185F_Fireplace Install Payment 1 of 2 $9,051
2026-06-10 Noble Builders & Fireplaces LLC 185F_Fireplace Install Payment 2 of 2 Remaining Balanace $9,051
67 Insulation & Soundproofing last: 2026-06-03 M $86 L $894
$14,000* +$8,020 43%
$5,980
67.7 Insulation/Fire Stop Flat Price
$5,000
Date Vendor Description Class Amount
2026-05-15 EMG Construction LLC 185F_Insulation Flat Price_Payment 1(downpayment) $5,000
60 - Building Systems:67 Insulation:67.4 Insulation/Fire Stop Labor
$894
Date Vendor Description Class Amount
2026-05-20 Buildesign Home Improvement, LLC RFW# 12 - 185F_Nixon (N2),Noé (N3)_Clean the electrical and plumbing holes for proper installation of fire stop insulation foam $213
2026-05-27 Buildesign Home Improvement, LLC RFW# 13 - 185F_UPDATED_Dany (N3),Kristian (N2),Roberto (N4)_1- Install pipe wrap insulation around all pipes in vulnerable areas: basement perimeter walls, crawl spaces, exterior walls on 1st, 2nd, and 3rd | 2- Move materials out of the 1st floor of the garage so that the insulators can reach the ceiling. Move materials back into the garage after insulation has been installed | Comments: The insulation subcontractor was going to pipe wrap for us, but he will not have enough time to pipe wrap and finish installing insulation for our inspection. We will pipe wrap so that we can keep the job moving forward. The insulator was not going to charge for this work / it was not part of his scope. No need for payment deductions. $588
2026-06-03 Buildesign Home Improvement, LLC RFW# 14_Kristian (N2) Scope of Work: 1st floor family room fireplace chimney - Re-route it to terminate on the side lowbrow roof instead of through the siding of the house as shown on the plans. Frame the soffit for the duct, install fire rated insulation around the pipe, and then frame out around the termination box for the fireplace exhaust on the side lowbrow roof (Note:Kristian 4 Hours Insulation and 4hours Framing and buy materials) $93
67.1 Insulation/Fire Stop Materials
$86
Date Vendor Description Class Amount
2026-02-05 Home Depot Insulation Materials $86
69 Drywall last: 2026-06-18 L $204
$55,400* +$12,296 78%
$43,104
69.7 Drywall/Spackle Flat Price
$42,900
Date Vendor Description Class Amount
2026-05-28 YF Interior 185FDrywall/spackle Flat fee.Payment 1 Material Downpayment $15,000
2026-06-05 YF Interior 185FDrywall/spackle Flat fee.Payment 2_Complete Steelrock Install $14,150
2026-06-11 YF Interior 185_FDrywall/spackle Flat fee.Payment 3_(Part 1 of 2) $10,000
2026-06-18 YF Interior 185_F_Drywall/spackle Flat fee.Payment 3_(Pmt 2 of 2) $3,750
60 - Building Systems:69 Drywall:69.4 Drywall/Spackle Labor
$204
Date Vendor Description Class Amount
2026-05-06 Buildesign Home Improvement, LLC 2026-04-30 | Dany (N3) | 8h: B. Existing sud floor repair and cosmetic wall repair in attic $204
71 Tile last: 2026-06-17 M $14,038 L $4,728
$34,600* +$15,834 54%
$18,766
71.1 Tile Materials
$14,038
Date Vendor Description Class Amount
2026-06-11 Standard Tile 185F_Tile Materials_Mudroom $967
2026-06-11 Standard Tile 185F_Tile Materials_Princess Bathroom $1,318
2026-06-11 Standard Tile 185F_Tile Materials_Kids 2nd Floor Bath $2,694
2026-06-11 Standard Tile 185F_Tile Materials_Basement Bathroom $494
2026-06-11 Standard Tile 185F_Tile Materials_Garage $2,077
2026-06-11 Standard Tile 185F_Tile Materials_Primary $3,534
2026-06-11 Standard Tile 185F_Tile Materials_Attic $1,227
2026-06-11 Standard Tile 185F_Tile Materials_2nd Floor $1,246
2026-06-11 M S International, Inc. (MSI) 185F_Tile Materials $479
70 - Finishes:71 Tile Installation:71.4 Tile Labor
$4,728
Date Vendor Description Class Amount
2026-06-10 Buildesign Home Improvement, LLC RFW# 16 Dany (N3),Nixon (N2),Pedro Cárdenas (N2),Roberto (N4) Scope of Work: 1. Prepare and Install (2) heated floor systems. (1) in the mudroom and (1) in the master bathroom 2. Prepare all bathrooms for tile installation: walls, floors, shower floors $1,278
2026-06-17 Buildesign Home Improvement, LLC Dany (N3),Kristian (N2),Nixon (N2),Noé (N3) Pedro Cárdenas (N2),Roberto (N4) Work Not Yet Completed | This is about $1,000 more than it normally would be, labor and material, for the heated floor system because we have 45 degree subfloor in the master bedroom and the mudroom. We need to add 1/4" wonder board on top of the 45 degree subfloor. Otherwise, the grout for the heated floor mat would crack. | 1. 3 days, 2 guys for the heated floor system. 2 days, 2 guys to prep (wonderboard, glue down the floor mats). 1 day, 2 guys to install the wire systems in both rooms. ~ $1,400 | 2. 2 guys, 2 days to prep each bathroom. 3 days, 2 guys for the master bath. 2 bathrooms worked on during each day, 8 bathrooms total. ~ $6,400 ($800/bath) $3,450
72 Flooring last: 2026-06-11 M $11,614
$38,400* +$26,786 30%
$11,614
72.2 Hardwood Floor Materials
$11,614
Date Vendor Description Class Amount
2026-06-11 P.C. Hardwood Floors 185F_Hardwood floor Materials $11,614
73 Cabinetry & Countertops
$66,500* +$66,500 0%
$0
74 Interior Carpentry
$115,700* +$115,700 0%
$0
75 Painting, Wallpaper & Stain
$42,100* +$42,100 0%
$0
76 Accessories
$6,900* +$6,900 0%
$0
77 Appliances
$24,200* +$24,200 0%
$0
82 Exterior Carpentry last: 2026-04-14 M $6,064
$37,800* +$31,736 16%
$6,064
80 - Exterior Work:82 Exterior Carpentry:82.1 Deck/Porch Materials (carpentry)
$5,888
Date Vendor Description Class Amount
2026-04-01 Jaeger Lumber 185F_Decking Materials $3,478
2026-04-07 Jaeger Lumber 185F_Decking Materials $769
2026-04-08 Jaeger Lumber 185F_Decking Materials $387
2026-04-14 Jaeger Lumber 185F_Decking Materials $1,253
82.1 Deck/Porch Materials (carpentry)
$176
Date Vendor Description Class Amount
2026-04-09 Home Depot Decking Materials $176
84 Exterior Masonry
$9,700* +$9,700 0%
$0
88 Landscape & Grounds last: 2025-06-20
$43,600* +$42,800 2%
$800
80 - Exterior Work:88 Lanscape and Grounds:88.7 Tree Removal and Site Clean Up / Demo
$800
Date Vendor Description Class Amount
2025-06-20 A-R General Contractor_Alberto Landscape & Snow Removal Fallen Tree Removal $800
92 Punch List
$6,600* +$6,600 0%
$0