| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-08-20 | Garfinkel Design Group LLC | Zelle - Architectural Plans. Payment 1. | — | $3,000 |
| 2024-11-13 | Garfinkel Design Group LLC | Architectural plans. Invoice# 24-3170 | — | $6,755 |
| 2025-03-21 | Staples | 16.7 Architectural Plans | — | $197 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-10-10 | Township of Montclair | Ck 8959. Interior Exploratory Demo Permit | — | $51 |
| 2025-03-06 | Township of Montclair | Construction Permit Fee | — | $4,212 |
| 2025-08-21 | Township of Montclair | 63M_HVAC Change of Contractor | — | $170 |
| 2026-01-07 | Township of Montclair | 63M_Smoke Certification Inspection | — | $75 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-07-23 | Safehouse Title Agency LLC | Hud Line 1304. Survey Fee | — | $750 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-09-24 | Staples | 2087D. Bathroom Vanities Plans Printing | — | $34 |
| 2025-09-29 | Staples | 63M. Closet 3 Plan. Printing | — | $6 |
| 2025-09-29 | Staples | Closet Plan - Printing | — | $40 |
| 2025-10-14 | Staples | 63M. Kitchen/Laundry/WineBar Plan - Printing | — | $40 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-12-31 | J & M Contractors LLC | 63M_2025 Project Supervision | — | $24,410 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-01-02 | Buildesign Home Improvement, LLC | Project Supervision_Hector_Wk.12.22-12.28.25(Punchlist) | — | $75 |
| 2025-04-09 | Buildesign Home Improvement, LLC | Project Supervision_Hector_Wk. 2025.04.09 ( Excavación guy) | — | $75 |
| 2025-04-16 | Buildesign Home Improvement, LLC | Project Supervision_Hector_Wk. 2025.04.16(Met with Andrew and Edgardo to discuss footing problems) | — | $150 |
| 2025-04-23 | Buildesign Home Improvement, LLC | Project Supervision_Hector_Wk 4.14-20.25(Check mason guy and drop materials/Met with plumber guy) | — | $225 |
| 2025-04-30 | Buildesign Home Improvement, LLC | Project Supervision_Hector_Wk 2025.04.30(check mason work) | — | $750 |
| 2025-05-07 | Buildesign Home Improvement, LLC | Project Supervision_Hector_ 4.28-5.4.25(Check Mason Guy) | — | $150 |
| 2025-05-21 | Buildesign Home Improvement, LLC | Project Supervision_Hector_ Inv 5.12-5.18.25(Check foundation work) | — | $225 |
| 2025-05-28 | Buildesign Home Improvement, LLC | Project Supervision_Hector_Wk 2025.05.28 (Check framing) | — | $188 |
| 2025-06-04 | Buildesign Home Improvement, LLC | Project Supervision_Hector_Wk 5.26-6.1.25(Check Framing) | — | $112 |
| 2025-06-11 | Buildesign Home Improvement, LLC | Project Supervision_Hector_Wk of 2025.06.11 ( Receive and Checked material/checked roofing work/met with framing to check framing details) | — | $188 |
| 2025-06-18 | Buildesign Home Improvement, LLC | Project Supervision_Hector_Wk 2025.06.18 (Check Framing) | — | $188 |
| 2025-06-25 | Buildesign Home Improvement, LLC | Project Supervision_Hector_Wk 2025.06.25 (Check framing) | — | $112 |
| 2025-07-02 | Buildesign Home Improvement, LLC | Project Supervision_Hector_Wk of 6.23-6.29.25 (Check Framing) | — | $75 |
| 2025-07-16 | Buildesign Home Improvement, LLC | Project Supervision_Hector_Wk 7.7-7.13.25(Met with Andrew to check framing on the front porch Check ceiling levels) | — | $150 |
| 2025-07-23 | Buildesign Home Improvement, LLC | Project Supervision_Hector_Wk 7.14-7.20.25(We working in trenche for garage electrical) | — | $38 |
| 2025-07-30 | Buildesign Home Improvement, LLC | Project Supervision_Hector_Wk. 7.21-7.27.25(Met with plumber and electrician to review framing) | — | $188 |
| 2025-08-06 | Buildesign Home Improvement, LLC | Project Supervision_Hector_Wk 2025.08.06 (Check framing work) | — | $262 |
| 2025-08-13 | Buildesign Home Improvement, LLC | Project Supervision_Hector_Wk 8.4-8.10.25(Check Framing) | — | $112 |
| 2025-08-20 | Buildesign Home Improvement, LLC | Project Supervision_Hector_ Invoice for 8.11-8.17.25(Check framing/ Check plumbing work and job site) | — | $225 |
| 2025-08-27 | Buildesign Home Improvement, LLC | Project Supervision_Hector_Inv for 8.18-8.24.25(Framing Inspection) | — | $75 |
| 2025-09-03 | Buildesign Home Improvement, LLC | Project Supervision_Hector_Wk. 8.25-8.31.25 (Check Stairs) | — | $38 |
| 2025-10-01 | Buildesign Home Improvement, LLC | Project Supervision_Hector_Wk 9.22-28.25( Check the work) | — | $900 |
| 2025-10-08 | Buildesign Home Improvement, LLC | Project Supervision_Hector_Wk.9.29-10.5.25(Closets and Trims) | — | $1,312 |
| 2025-10-15 | Buildesign Home Improvement, LLC | Project Supervision_Hector_Wk. 10.6-10.12.25(Carpentry) | — | $1,162 |
| 2025-10-22 | Buildesign Home Improvement, LLC | Project Supervision_Hector_Wk 10.13-19.25 ( Buy materials and lay out basement closet) | — | $1,012 |
| 2025-10-29 | Buildesign Home Improvement, LLC | Project Supervision_Hector_Wk.10.20-26.25(Check work in Vanities/Basement steps) | — | $300 |
| 2025-11-05 | Buildesign Home Improvement, LLC | Project Supervision_Hector_ Wk 10.27-11.02(Met with Shlomo and Andrew ) | — | $75 |
| 2025-11-12 | Buildesign Home Improvement, LLC | Project Supervision_Hector_Wk 11.3-11.9.25 (Met with siding guy) | — | $38 |
| 2025-11-19 | Buildesign Home Improvement, LLC | Project Supervision_Hector_Wk 11.10-11.16.25(Check Work) | — | $1,200 |
| 2025-11-26 | Buildesign Home Improvement, LLC | Project Supervision_Hector_ Wk 11.17-11.23.25(Met with Andrew/ Check siding work met with electrician guy) | — | $938 |
| 2025-12-03 | Buildesign Home Improvement, LLC | Project Supervision_Hector_Wk 11.24-11.30.25.(Worked in carpentry) | — | $788 |
| 2025-12-10 | Buildesign Home Improvement, LLC | Project Supervision_Hector_Wk. 12.1-12.7.25( Worked buy siding material, met with Shlomo, Andrew at 56 Benson St, Glen Ridge) | — | $562 |
| 2025-12-17 | Buildesign Home Improvement, LLC | Project Supervision_Hector_Wk. 12.8-12.14.25 (Worked Move garbage and material/Buy material and make connections for water meter) | — | $450 |
| 2025-12-24 | Buildesign Home Improvement, LLC | Project Supervision_Hector_Wk.12.15-21.25(Punchlist/I worked buy material and met with Shlomo and Andrew ) | — | $825 |
| 2026-01-07 | Buildesign Home Improvement, LLC | Project Supervision_Hector_Wk. 12.29.25-01.04.26(Missing Dimension and met with dishwasher guy technical) | — | $75 |
| 2026-01-14 | Buildesign Home Improvement, LLC | Project Supervision_Hector_Wk. 01.05-01.11.26(work detail for home inspection) | — | $495 |
| 2026-01-14 | J & M Contractors LLC | 63M_JJ Project Management_Split 2 of $5500 | — | $550 |
| 2026-01-21 | Buildesign Home Improvement, LLC | Project Supervision_Hector_Wk. 01.12-01.18.26( Punch list) | — | $330 |
| 2026-01-30 | J & M Contractors LLC | 63M_JJ Project Management_Split 1 of $4K | — | $667 |
| 2026-02-11 | Buildesign Home Improvement, LLC | Project Supervision_Hector_Wk.2.2.26-2.8.26( 4h: Worked in spackle and paint) | — | $165 |
| 2026-02-18 | Buildesign Home Improvement, LLC | Project Supervision_Hector_Wk. 2.9.26-2.15.26(4h: Check freezing pipe/| 5h: Worked insulation around water line to prevent freezing / 4h: Worked Sheetrock, spackle,paint and spray foam around the house to prevent freezing pipe | — | $485 |
| 2026-02-24 | J & M Contractors LLC | 63M__Project Supervision Split 4 of $2500 Wk 3 | — | $338 |
| 2026-02-24 | J & M Contractors LLC | 63M__Project Supervision Split 6 of $2250 | — | $135 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-06-03 | Ashpa Management | Roll Off & Dumping 06/03 | — | $422 |
| 2025-06-04 | Ashpa Management | Roll Off & Dumping 06/04 | — | $750 |
| 2025-06-11 | Ashpa Management | 63M. Roll Off & Dumping 6/11 | — | $703 |
| 2025-06-20 | Ashpa Management | Roll Off & Dumping | — | $742 |
| 2025-07-31 | Ashpa Management | Roll off and Dumping | — | $808 |
| 2025-08-26 | Ashpa Management | 63M_Roll off and Dumping | — | $736 |
| 2025-10-30 | Ashpa Management | 63M_Roll Off & Dumping | — | $827 |
| 2025-11-10 | Ashpa Management | 63M_Roll Off & Dumping | — | $723 |
| 2025-11-14 | Ashpa Management | 63M_Roll Off & Dumping | — | $672 |
| 2025-12-02 | Ashpa Management | 63M.Roll Off and Dumping 12/01 | — | $783 |
| 2025-12-11 | Ashpa Management | 63M_Roll Off & Dumping | — | $791 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-03-24 | Ashpa Management | 63M. Porta 3/24-4/20 | — | $135 |
| 2025-04-18 | Ashpa Management | Portable Comfort Station | — | $135 |
| 2025-05-19 | Ashpa Management | Portable Comfort Station | — | $135 |
| 2025-06-16 | Ashpa Management | Portable Comfort Station 6/16-7/13 | — | $135 |
| 2025-07-14 | Ashpa Management | Portable Comfort Station | — | $135 |
| 2025-08-25 | Ashpa Management | Portable Comfort Station | — | $135 |
| 2025-09-12 | Ashpa Management | Portable Comfort Station 9/8-10/5 | — | $135 |
| 2025-09-25 | Ashpa Management | 63M. Roll Off & Dumping 9/22 | — | $834 |
| 2025-10-12 | Ashpa Management | 63M_Portable Comfort Station | — | $135 |
| 2025-11-04 | Ashpa Management | 63M_Portable Comfort Station | — | $135 |
| 2025-12-03 | Ashpa Management | 63MPortable Comfort Station | — | $135 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-12-23 | Capital Fence Co, LLC | 63M_Fence Install Check# 179 | — | $1,940 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-05-21 | J & M Contractors LLC | Site clean up and loading the extra material to bring to another job | — | $110 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-04-23 | J & M Contractors LLC | 63M. Wk 4.14-20.25. Septic Installation | — | $520 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-12-12 | Township of Montclair | 63M_New water meter Check#144 | — | $492 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-10-31 | J & J Demo LLC | Pmt 1 - Down Payment | — | $2,000 |
| 2024-10-31 | J & J Demo LLC | Pmt 2 - Backyard Demo and Clean-up | — | $1,750 |
| 2024-10-31 | J & J Demo LLC | Pmt 3 - Complete House Demo to Studs | — | $8,750 |
| 2024-11-13 | J & J Demo LLC | Pmt 4 - Final Cleanup | — | $3,000 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-04-07 | Benchmark Excavating LLC | Existing Foundation Wall and House Demo | — | $1,000 |
| 2025-08-27 | J & M Contractors LLC | 63M. Demolishing the roof on the porch | — | $410 |
| 2025-11-19 | Buildesign Home Improvement, LLC | 63M. Worked on demolition deck front porch | — | $372 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-04-07 | Ashpa Management | 30 yd Roll off Service and Dumping | — | $1,056 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-05-02 | Rent All Center | 63 Montclair machine rental, dirt removal; asked Andrew for receipt NO RECEIPTS YET | — | $850 |
| 2025-05-15 | Rent All Center | Refund -NO RECEIPTS YET | — | $55 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-06-12 | Benchmark Excavating LLC | Pmt 2 - DemolitionClean up | — | $800 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-04-08 | E.L. Congdon & Sons Lumber Co | Footing Materials | — | $1,747 |
| 2025-04-14 | E.L. Congdon & Sons Lumber Co | Foundation footing Materials | CO - Change Orders (deleted) | $388 |
| 2025-04-14 | Home Depot | Foundation Materials | CO - Change Orders (deleted) | $535 |
| 2025-04-15 | County Concrete Corp. | County Concrete Ready-Mix concrete for the footings at 63 Montclair. | — | $704 |
| 2025-04-15 | County Concrete Corp. | County Concrete Ready-Mix concrete for the footings at 63 Montclair. | — | $1,846 |
| 2025-04-16 | Home Depot | Masonry Materials | — | $241 |
| 2025-04-25 | E.L. Congdon & Sons Lumber Co | Slab Materials | — | $2,444 |
| 2025-04-29 | E.L. Congdon & Sons Lumber Co | Garage foundation materials | — | $1,699 |
| 2025-05-01 | SRM Concrete | 63M-Ready mix concrete for the basement slab WAITING FOR THE RECEIPT | — | $2,107 |
| 2025-05-01 | SRM Concrete | 63M-Ready mix concrete for the basement slab WAITING FOR THE RECEIPT | — | $793 |
| 2025-05-05 | E.L. Congdon & Sons Lumber Co | Foundation Materials | — | $2,355 |
| 2025-05-14 | E.L. Congdon & Sons Lumber Co | Foundation materials | — | $746 |
| 2025-05-17 | E.L. Congdon & Sons Lumber Co | Foundation Materials | — | $85 |
| 2025-05-17 | Home Depot | Foundation Materials | — | $371 |
| 2025-05-20 | E.L. Congdon & Sons Lumber Co | 63M_ Foundation Materials | — | $88 |
| 2025-05-20 | County Concrete Corp. | Concrete slab. Garage & basement. | — | $1,927 |
| 2025-12-10 | Home Depot | 63M. Foundation Materials | — | $35 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-05-21 | Eduar Raudales | Foundation Labor. Pmt 2 - Garage. Pass foundation/backfill inspection | — | $1,500 |
| 2025-05-21 | Eduar Raudales | Foundation Labor. Pmt 3 - Garage. Pour the garage slab | — | $1,500 |
| 2025-05-21 | Eduar Raudales | Foundation Labor. Pmt 3 - House Addition. Pass foundation/backfill inspection | — | $4,000 |
| 2025-05-21 | Eduar Raudales | Foundation Labor. Pmt 5 - House Addition. Pour the new basement slab | — | $4,500 |
| 2025-08-15 | Eduar Raudales | Foundation Labor. Pmt 2 & 6 | — | $2,000 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-05-01 | Eduar Raudales | Foundation labor | DM - Damage or Site Variances (deleted) | $3,500 |
| 2025-05-15 | Eduar Raudales | Foundation labor. House Addition | CO - Change Orders (deleted) | $3,500 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-12-17 | Buildesign Home Improvement, LLC | 63M. Worked on Repair a drain pipe that broke by nails | — | $300 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-04-11 | Jaeger Lumber | Footing Materials | — | $165 |
| 2025-08-14 | — | Refund/Return Pallet from Org I26772/1 | — | $-187 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-04-03 | MJJ Trucking, LLC | Dirt Removal | — | $1,800 |
| 2025-06-12 | Benchmark Excavating LLC | 5 hours @ $150/hr. | CO - Change Orders (deleted) | $750 |
| 2025-06-20 | MJJ Trucking, LLC | Dirt removal | — | $2,925 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-04-07 | Benchmark Excavating LLC | Excavation Foundation | — | $1,500 |
| 2025-04-07 | Benchmark Excavating LLC | Existing driveway removal | — | $425 |
| 2025-05-08 | J & M Contractors LLC | Excavation/backfill | — | $320 |
| 2025-07-23 | Buildesign Home Improvement, LLC | 63M_We working in trenche for garage electrical | — | $384 |
| 2025-11-07 | A-R General Contractor_Alberto Landscape & Snow Removal | 63M. To fill sink hole | DM - Damage or Site Variances (deleted) | $550 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-06-12 | Benchmark Excavating LLC | Pmt 5 - Backfill and Grading | — | $725 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-05-08 | J & M Contractors LLC | Dirt removal | — | $120 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-06-12 | Bergen-Essex Contractors Inc | Pmt 1 - Down Payment | — | $4,000 |
| 2025-07-03 | Bergen-Essex Contractors Inc | Pmt 4 - Attic Deck and Walls & Roof | — | $5,000 |
| 2025-07-03 | Bergen-Essex Contractors Inc | Pmt 2 - 1st Floor Deck & Walls | — | $7,000 |
| 2025-07-03 | Bergen-Essex Contractors Inc | Pmt 3 - 2nd Floor Deck & Walls | — | $7,000 |
| 2025-07-10 | Bergen-Essex Contractors Inc | Pmt 5 - Basement Framing | — | $6,000 |
| 2025-07-31 | Buildesign Home Improvement, LLC | CO1 Pmt 1 - Complete removal and disposal of all existing finish flooring | — | $750 |
| 2025-07-31 | Buildesign Home Improvement, LLC | CO1 Pmt 2 - Complete patching, re-securing, and re-nailing all of the subfloors in the house | — | $750 |
| 2025-07-31 | Buildesign Home Improvement, LLC | CO1 Pmt 3 - Complete install of leveling 2x4s in all specified ceilings and walls | — | $1,500 |
| 2025-07-31 | Buildesign Home Improvement, LLC | CO1 Pmt 4 - Complete framing the front porch area and new roof | — | $1,500 |
| 2025-08-25 | Bergen-Essex Contractors Inc | Pmt 7 - Final Payment (Pass Inspection) | — | $5,000 |
| 2025-08-28 | Bergen-Essex Contractors Inc | Pmt 6 - Stair Installation, Sheathing, All Windows & Exterior Door Installation (Part 1 of 3) | — | $1,000 |
| 2025-11-14 | Bergen-Essex Contractors Inc | Pmt 6 - Stair Installation, Sheathing, All Windows & Exterior Door Installation (Part 2 of 3) | — | $2,500 |
| 2025-12-11 | Bergen-Essex Contractors Inc | Pmt 6 - Stair Installation, Sheathing, All Windows & Exterior Door Installation (Part 3 of 3) | — | $2,500 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-04-03 | Jaeger Lumber | Temp framing materials | — | $223 |
| 2025-04-03 | Jaeger Lumber | Framing Materials | — | $73 |
| 2025-05-28 | Jaeger Lumber | 63M_Framing Materials | — | $4,573 |
| 2025-05-28 | Jaeger Lumber | 63M_Framing Materials | — | $628 |
| 2025-06-03 | Jaeger Lumber | Framing materials | — | $694 |
| 2025-06-04 | Jaeger Lumber | Framing materials | — | $11,815 |
| 2025-06-17 | Jaeger Lumber | 63M_Framing materials | — | $1,188 |
| 2025-06-27 | Jaeger Lumber | 63M_Framing materials | — | $256 |
| 2025-07-31 | — | Refund | — | $-18 |
| 2025-09-11 | Jaeger Lumber | 63M. Framing Materials | — | $186 |
| 2025-09-25 | Jaeger Lumber | 63M. Framing Materials | — | $781 |
| 2025-10-01 | Jaeger Lumber | 63M_Framing Materials | — | $353 |
| 2025-10-10 | Jaeger Lumber | 63M_Framing Materials | — | $26 |
| 2025-10-10 | Jaeger Lumber | 63M_Framing Materials | — | $274 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-05-28 | Woodhaven Lumber & Millwork | PSL | — | $4,428 |
| 2025-06-06 | Jaeger Lumber | 63M_Framing Materials | — | $2,338 |
| 2025-06-09 | Jaeger Lumber | 63M_Framing Materials | — | $466 |
| 2025-06-09 | Jaeger Lumber | 63M_Framing Materials | — | $405 |
| 2025-06-16 | Jaeger Lumber | 63M_Framing Materials | — | $100 |
| 2025-06-26 | Jaeger Lumber | 63M_Framing Materials | — | $1,311 |
| 2025-07-16 | Jaeger Lumber | 63M_Framing Materials | — | $251 |
| 2025-07-21 | Jaeger Lumber | 63_Montclair_Framing Materials cc xx4311 | — | $7,637 |
| 2025-07-29 | Home Depot | Framing Materials | — | $106 |
| 2025-07-30 | Jaeger Lumber | Framing Materials | — | $84 |
| 2025-08-02 | Jaeger Lumber | 63M_Framing Materials | — | $636 |
| 2025-08-04 | Jaeger Lumber | 63M_Framing Materials x cc4311 | — | $154 |
| 2025-08-05 | Jaeger Lumber | 63M_Framing Materials x cc4311 | — | $441 |
| 2025-08-18 | Jaeger Lumber | Framing Materials | — | $366 |
| 2025-08-19 | Home Depot | Framing Materials | — | $136 |
| 2025-08-20 | Jaeger Lumber | Framing Materials | — | $159 |
| 2025-08-21 | Home Depot | 63M. Framing Materials | — | $156 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-04-09 | Buildesign Home Improvement, LLC | 63M.We working in temporary framing | — | $696 |
| 2025-07-30 | Buildesign Home Improvement, LLC | Performed framing modifications for plumbing throughout | — | $600 |
| 2025-07-30 | J & M Contractors LLC | building plumbing boxe | — | $110 |
| 2025-08-06 | Buildesign Home Improvement, LLC | 63M. modify framing for basement stairs | — | $96 |
| 2025-08-06 | Buildesign Home Improvement, LLC | CO1 Pmt 5 - Complete garage framing | — | $2,500 |
| 2025-08-06 | Buildesign Home Improvement, LLC | CO1 Pmt 6 - Complete back deck framing | — | $2,500 |
| 2025-08-20 | Buildesign Home Improvement, LLC | 63M. Framing for duct work | — | $372 |
| 2025-08-27 | J & M Contractors LLC | 63M. Reinforcing Framing on stairs and attic preparing for framing | — | $1,495 |
| 2025-09-03 | J & M Contractors LLC | 63M. Framing Labor | — | $800 |
| 2025-09-24 | Buildesign Home Improvement, LLC | 63M. We working in move fireplace (Framing Edits) | — | $246 |
| 2025-10-02 | J & M Contractors LLC | 63M. Framing Labor | — | $360 |
| 2025-10-08 | J & M Contractors LLC | 63M. Leveling the balcony / faming in the basement | — | $940 |
| 2025-11-05 | Buildesign Home Improvement, LLC | 63M. Worked in windows repair / Worked in framing extend the fireplace walls | — | $972 |
| 2025-11-12 | Buildesign Home Improvement, LLC | 63M. Reframing fireplace box | — | $180 |
| 2025-11-26 | Buildesign Home Improvement, LLC | 63M. Buy material and repair window / Worked make window | — | $1,200 |
| 2025-12-03 | Buildesign Home Improvement, LLC | 63M. Worked in make window | — | $600 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-06-23 | SRS Building Products | Roofing Materials | — | $79 |
| 2025-07-18 | SRS Building Products | Roofing Materials | — | $1,881 |
| 2025-08-02 | Jaeger Lumber | 63M_Roofing Materials | — | $472 |
| 2025-09-10 | SRS Building Products | Roofing Materials | — | $1,475 |
| 2025-09-16 | Home Depot | $62.61 | — | $63 |
| 2025-10-21 | Home Depot | Shingle | — | $18 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-12-31 | Lucky Gutters LLC | 63M_Gutters/Leaders Paid upon completion | — | $1,900 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-10-07 | Blue Eagle Construction LLC | Roofing Labor. Full Payment - Install New Roofing | — | $1,620 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-07-17 | Blue Ridge Lumber | Windows | — | $30,920 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-12-11 | NJ Garage | 63M. Garage Doors. Full Payment | — | $2,150 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-05-06 | Grand Entry Doors | Front door | — | $1,900 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-12-09 | Ferguson Home/Ferguson | 63M. Garage entry knob | — | $59 |
| 2025-12-11 | Ferguson Home/Ferguson | 63M. Garage knob and deadbolt | — | $109 |
| 2025-12-11 | Amazon | 63M. Front door handleset | — | $151 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-09-10 | Buildesign Home Improvement, LLC | 120B. Receive doors and move to the location | — | $98 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-09-16 | Jaeger Lumber | 63M. Interior Stair Materials | — | $373 |
| 2025-11-19 | Home Depot | 63M. Railing Materials | — | $3,028 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-12-04 | Buildesign Home Improvement, LLC | Full Payment - Interior Stair modifications | — | $1,800 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-08-25 | J and R Railings Inc. | 63M. Basement Sitars. Downpayment | — | $585 |
| 2025-10-30 | J and R Railings Inc. | 63M. Basement Stairs. Final | — | $585 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-09-16 | Boards & Beams LLC | 63M_Interior Stair Materials | — | $110 |
| 2025-11-14 | J and R Railings Inc. | 63M. Stair Materials. | — | $225 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-10-22 | Jaeger Lumber | 63M_Siding Materials | — | $19,367 |
| 2025-11-05 | Jaeger Lumber | 63M_Siding Material | — | $153 |
| 2025-11-06 | Jaeger Lumber | 63M_Siding Material | — | $1,736 |
| 2025-11-12 | Jaeger Lumber | 63_M Siding Materials | — | $1,031 |
| 2025-11-22 | Jaeger Lumber | 63M_Siding Materials | — | $2,262 |
| 2026-02-28 | — | Credit Note | — | $-1,380 |
| 2026-03-12 | — | Credit Note :IInvoice number 2430095, cust ref 63 montclair ave, order number 12144430 | — | $-1,903 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-12-16 | Blue Eagle Construction LLC | 63M-Siding Labor(temporary receipt) | — | $14,128 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-11-18 | QXO | 63M. Metal Soffit (Siding) | — | $927 |
| 2025-11-24 | QXO | 63M. Additional Siding Materials | — | $391 |
| 2025-12-01 | QXO | 63M. Additional Siding Materials | — | $265 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-08-27 | J & M Contractors LLC | 63M. Installing Tyvek | — | $250 |
| 2025-09-03 | Buildesign Home Improvement, LLC | 63M. Install Tybeck | — | $96 |
| 2025-10-08 | J & M Contractors LLC | 63M. Installing Tyvek | — | $255 |
| 2025-11-11 | Jaeger Lumber | 63M_House Wrap | — | $256 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-12-03 | Buildesign Home Improvement, LLC | 63M. Worked to fix shutters | — | $492 |
| 2025-12-10 | Buildesign Home Improvement, LLC | 63M. Worked Fix existing shutters | — | $300 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-07-01 | Jaeger Lumber | 63M_Housewrap Material | — | $460 |
| 2025-08-22 | Home Depot | 63M. House Wrap | — | $239 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-11-25 | SRS Building Products | 63M. Shutters | — | $277 |
| 2025-11-25 | Amazon | 63M. Shutters' S-holders | — | $96 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-08-15 | Nestor Tacconi | HVAC Downpayment | — | $5,000 |
| 2025-08-28 | Nestor Tacconi | HVAC Flat. Pmt2. Purchase Furnaces | — | $5,000 |
| 2025-12-31 | Nestor Tacconi | HVAC Flat Price_Pmt 3 & 6 | — | $6,000 |
| 2026-01-09 | Nestor Tacconi | 63M.. HVAC Flat Price_Pmt 7 | — | $4,000 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-08-25 | Nestor Tacconi | Pmt 4 | — | $4,000 |
| 2025-11-19 | Nestor Tacconi | HVAC Flat Price. Pmt 5 - Purchase Condensers | — | $4,000 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-09-16 | Standard Tile | Heated Floor System | — | $726 |
| 2025-11-28 | Home Depot | 63M. HVAC Materials | — | $55 |
| 2025-12-03 | Home Depot | 63M. Louvered Cap | — | $39 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-12-16 | Amazon | 63M. Replacement thermostat | — | $244 |
| 2025-12-23 | Walmart | 63M_Replacement Thermostat | — | $187 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-08-27 | J & M Contractors LLC | 63M. HVAC Labor | — | $375 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-10-30 | Amazon | 63M. Google Nest Learning Thermostat | — | $218 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-07-18 | Yover Tenezaca (Plumber) | Plumbing Labor_Payment 1_ | — | $8,817 |
| 2025-08-28 | Yover Tenezaca (Plumber) | Plumbing Labor_Payment 2 | — | $8,817 |
| 2026-01-15 | Yover Tenezaca (Plumber) | 63M. Plumbing Labor. Pmt 3 | — | $8,817 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-07-17 | Amazon | Delta faucet | — | $693 |
| 2025-04-28 | Home Depot | Sump pump | — | $90 |
| 2025-09-20 | Home Depot | 63M.Sump Pump | — | $386 |
| 2025-10-29 | WaterWays Decor | 63M_Plumbinmg Materials | — | $5,056 |
| 2025-10-29 | Ferguson Home/Ferguson | 63M. Kitchen and Master Bath Sinks | — | $1,597 |
| 2025-11-17 | Ferguson Home/Ferguson | 63M. Kitchen, Laundry Faucet, & Bathroom fixtures | — | $3,328 |
| 2025-11-19 | Amazon | 63M. garbage disposal, air switch, pot filler | — | $1,246 |
| 2025-11-20 | Amazon | 63M. Faucet | — | $312 |
| 2025-11-21 | Dowell | 63M. Pop up drainer & Faucets | — | $1,046 |
| 2025-12-03 | Ferguson Home/Ferguson | 63M. Replacement Toilet | — | $533 |
| 2025-12-03 | Ferguson Home/Ferguson | 63M. Kitchen, Laundry Faucet, & Bathroom fixtures | — | $533 |
| 2025-12-04 | Ferguson Home/Ferguson | 63M. Bar Faucet | — | $186 |
| 2025-12-04 | Ferguson Home/Ferguson | 63M_Hot Water Heater | — | $2,287 |
| 2025-12-04 | Amazon | 63M. Replacement laundry faucet | — | $225 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-07-04 | WaterWays Decor | Downpayment for 63 Montclair rough plumbing materials | — | $3,500 |
| 2025-11-01 | Home Depot | 63M. Plumbing Materials | — | $95 |
| 2025-12-02 | Home Depot | Pop-Up Floor Box (Brass) | — | $112 |
| 2025-12-09 | Home Depot | Plumbing Materials | — | $103 |
| 2025-12-15 | Home Depot | Plumbing Materials | — | $43 |
| 2025-12-15 | GPS - Orange | Plumbing Materials | — | $106 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-11-19 | Home Depot | 63M. Plumbing Fixtures | — | $1,488 |
| 2025-11-26 | — | 63M. Plumbing Fixtures | — | $-134 |
| 2025-12-08 | Home Depot | 63M. Toilet/Plumbing Materials | — | $504 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-04-30 | J & M Contractors LLC | Preparing for inspection | — | $130 |
| 2025-09-17 | J & M Contractors LLC | Installing new water pipes for the sump pumps | — | $220 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-04-11 | Home Depot | Electric materials | — | $168 |
| 2025-07-10 | Grant Supplies | Electrical Materials- Roughs | — | $4,785 |
| 2025-07-16 | Home Depot | 63M. Electrical Materials Rough | — | $576 |
| 2025-08-06 | Grant Supplies | Electrical Materials- Roughs | — | $2,264 |
| 2025-08-27 | Home Depot | 63M. Electrical Roughs | — | $25 |
| 2025-09-02 | Prestige Lighting | Lighting Materials (IC Cans) | — | $1,672 |
| 2025-09-05 | Grant Supplies | Electrical Materials | — | $1,068 |
| 2025-09-29 | Home Depot | Roughs Materials | — | $576 |
| 2025-11-22 | Home Depot | Roughs Materials | — | $2,486 |
| 2025-12-01 | Home Depot | Rough Materials | — | $301 |
| 2025-12-02 | Grant Supplies | 63M. Eletrical Roughs | — | $1,875 |
| 2025-12-06 | Home Depot | Rough Materials | — | $21 |
| 2025-12-12 | Home Depot | Electrical Materials | — | $19 |
| 2026-01-05 | Home Depot | Electrical Plug | — | $20 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-11-18 | Shades of Light | 63M. Reading nook light fixture | — | $393 |
| 2025-11-19 | Shades of Light | 63M. Light fixtures | — | $1,567 |
| 2025-11-19 | Birch Lane | 63M. Light fixtures | — | $1,071 |
| 2025-11-19 | Birch Lane | 63M. Light fixtures | — | $2,515 |
| 2025-12-01 | Amazon | LED Driver and Connector | — | $180 |
| 2025-12-02 | Home Depot | Plastic Pull Chain Lamp Holder | — | $5 |
| 2025-12-03 | Home Depot | 63M. Flood light | — | $53 |
| 2025-12-03 | Shades of Light | 63M. Additional exterior lights | — | $372 |
| 2025-12-23 | Prestige Lighting | 63M Lighting materials | — | $1,318 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-08-25 | Jose Moreno (Electrician) | Pmt 1 - Begin | — | $3,000 |
| 2025-08-25 | Jose Moreno (Electrician) | Pmt 2 - Pass the rough inspection | — | $3,000 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-04-21 | J & M Contractors LLC | Electrocal Labor | — | $130 |
| 2025-08-19 | Jose Moreno (Electrician) | Pmt 3 - Pass the final inspection | — | $3,000 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-11-20 | Amazon | 63M. Doorbell & Chime | — | $201 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-07-10 | Noble Builders & Fireplaces LLC | Downpayment | — | $2,932 |
| 2025-08-01 | Noble Builders & Fireplaces LLC | 2087D. Fireplace Final Payment | — | $2,932 |
| 2025-11-28 | Noble Builders & Fireplaces LLC | 63M. RW Rerun Fireplace | RW - Rework Variances (deleted) | $650 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-09-19 | Noble Builders & Fireplaces LLC | 63M. RW Exhaust Reroute | — | $950 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-11-15 | Home Depot | 63M. Fireplace Brick Installation Materials | — | $141 |
| 2025-11-26 | E.L. Congdon & Sons Lumber Co | 63M. Bluestone (Fake fireplace stone) | — | $88 |
| 2025-11-26 | E.L. Congdon & Sons Lumber Co | 63M. Bluestone (Fake fireplace stone) | — | $16 |
| 2025-12-11 | SP Stone & Tile Corp | Marble Material for Fireplace | — | $275 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-08-28 | EMG Construction LLC | 63M. Insulation. Pmt2. | — | $3,300 |
| 2025-08-28 | EMG Construction LLC | 63M. Insulation. Down payment | — | $3,300 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-08-19 | Jaeger Lumber | 63M. Insulation Materials | — | $184 |
| 2025-12-05 | Jaeger Lumber | 63M_Insulation Materials | — | $98 |
| 2026-02-01 | Home Depot | Insulation Materials | — | $169 |
| 2026-02-02 | Home Depot | Insulation Materials | — | $67 |
| 2026-02-10 | Home Depot | Insulation Materials | — | $91 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2026-02-18 | Buildesign Home Improvement, LLC | 2026-02-10 | Pedro Cárdenas (N2) | 5h: Worked insulation around water line to prevent freezing 2026-02-11 | Pedro Cárdenas (N2) | 4h: Worked Sheetrock, spackle,paint and spray foam around the house to prevent freezing pipe | — | $308 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-09-11 | Old School Drywall | Sheetrock Labor Pmt1o2 | — | $6,000 |
| 2025-09-26 | Old School Drywall | Sheetrock_Payment 3 (Part 1 of 2) | — | $6,000 |
| 2025-12-11 | Old School Drywall | 63M_Sheetrock Labor_Pmt 2 (Part 2 of 2) & Pmt 3 (Part 2 of 2)_$2,000 | — | $2,000 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-08-26 | Campbell Supply Company | Sheetrock 50% Downpayment | — | $5,655 |
| 2025-08-29 | Campbell Supply Company | Sheetrock 50% Finalpayment | — | $5,655 |
| 2025-11-25 | Home Depot | 63M. Drywall Materials | — | $89 |
| 2025-12-04 | Home Depot | 63M. Sheetrock Materials | — | $78 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-09-17 | J & M Contractors LLC | Interior patching holes and installing Sheetrock | — | $500 |
| 2025-10-22 | Buildesign Home Improvement, LLC | 63M. Worked spackle and tile sealer / Worked in spackle | — | $555 |
| 2025-10-29 | Buildesign Home Improvement, LLC | 63M. Worked in spackle and clean up | — | $444 |
| 2025-11-26 | Buildesign Home Improvement, LLC | 63M. Worked Sanding spackle / Worked on touch up spackle | — | $333 |
| 2025-12-03 | Buildesign Home Improvement, LLC | 63M. Sheetrock under the stairs / Worked touch up spackle and sanding | — | $402 |
| 2025-12-10 | Buildesign Home Improvement, LLC | 63M. Worked install Sheetrock mechanical room / Worked on Intall Sheetrock in the back wall attic bathroom / Worked touch up spackle | — | $1,086 |
| 2025-12-17 | Buildesign Home Improvement, LLC | 63M. Worked in drywall and spackle in mechanical and storage / Worked in sanding spackle | — | $642 |
| 2026-02-11 | Buildesign Home Improvement, LLC | 2026-02-02 | Pedro Cárdenas (N2) | 8h: Worked in spackle and paint | — | $228 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-08-27 | J & M Contractors LLC | 63M. Tile labor | — | $1,155 |
| 2025-09-03 | J & M Contractors LLC | 63M. Tile Labor | — | $220 |
| 2025-09-24 | J & M Contractors LLC | 63M. Repairing holes on the floor, loading the dumpster. | — | $125 |
| 2025-10-01 | Buildesign Home Improvement, LLC | 63M. Prepare for tile / Worked in Tile | — | $978 |
| 2025-10-08 | Buildesign Home Improvement, LLC | 63M. Worked in Tile | — | $2,100 |
| 2025-10-15 | Buildesign Home Improvement, LLC | 63M. Worked in tile | — | $2,100 |
| 2025-10-22 | Buildesign Home Improvement, LLC | 63M. Worked in tile | — | $1,410 |
| 2025-10-29 | Buildesign Home Improvement, LLC | 63M. Worked on tile / Worked tile Sealer and cleanup | — | $784 |
| 2025-11-26 | Buildesign Home Improvement, LLC | 63M. Worked in backsplash | — | $444 |
| 2025-12-03 | Buildesign Home Improvement, LLC | 63M. Worked in back splash | — | $666 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-09-15 | M S International, Inc. (MSI) | 63M. Tile materials plus CC Fee | — | $1,062 |
| 2025-09-15 | The Tile Shop | 63M. Tile materials | — | $353 |
| 2025-09-17 | Home Depot | 63M. Tiling Materials | — | $134 |
| 2025-09-17 | Standard Tile | 63M. Tile materials_Princess suite | — | $305 |
| 2025-09-17 | Standard Tile | 63M. Tile materials_Primary Bath | — | $1,337 |
| 2025-09-17 | Standard Tile | 63M. Tile materials_2F Hall Bath | — | $1,301 |
| 2025-09-17 | Standard Tile | Tile Materials | — | $164 |
| 2025-09-18 | Floor & Decor | 63M. Tile Materials | — | $401 |
| 2025-09-26 | Home Depot | 63M. Tiling Materials | — | $663 |
| 2025-09-30 | Home Depot | 63M. Tiling Materials | — | $159 |
| 2025-10-01 | Home Depot | 63M. Tiling Materials | — | $180 |
| 2025-10-08 | Home Depot | 63M. Tiling Materials | — | $124 |
| 2025-10-09 | Home Depot | 63M. Tiling Materials | — | $26 |
| 2025-10-11 | Home Depot | 63M. Tiling Materials | — | $88 |
| 2025-10-14 | Home Depot | 63M. Tiling Materials | — | $97 |
| 2025-10-15 | Standard Tile | 63M. Mink Grout | — | $43 |
| 2025-10-17 | Home Depot | 63M. Tiling Materials | — | $231 |
| 2025-10-17 | Standard Tile | 63M. Additional Primary Bath Tiles | — | $186 |
| 2025-10-21 | Home Depot | Jolly & Mortar | — | $219 |
| 2025-10-24 | Standard Tile | 63M. Additional Grout | — | $28 |
| 2025-10-29 | Standard Tile | 63M_Backsplash Tiles | — | $635 |
| 2025-11-28 | Home Depot | 63M. Tile Materials | — | $19 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-10-03 | Jaeger Lumber | 63M_Tile Materials | — | $132 |
| 2025-11-20 | J & M Contractors LLC | 63M. installing tile in the backsplash. | — | $270 |
| 2025-11-26 | Standard Tile | 63M_Caulk & Grout | — | $54 |
| 2025-12-03 | J & M Contractors LLC | 63M. Doing Grout | — | $220 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-10-08 | Buildesign Home Improvement, LLC | 63M. Worked buy material in tile prepared | — | $111 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-12-11 | Advanced Flooring, LLC | Hardwood Floor Materials. Full Payment - 4inch Red Oak | — | $9,665 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-10-29 | Direct Builders Trade Inc | 63M. Install | — | $3,536 |
| 2025-12-10 | Direct Builders Trade Inc | 63M_ Flooring Labor Payment 2-Staining | — | $5,711 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-10-29 | Direct Builders Trade Inc | 63M. Install | — | $895 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-09-26 | Advanced Flooring, LLC | Additional 4inch Red Oak | — | $755 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-09-24 | TSG Cabinets | 63M. Vanities | — | $3,054 |
| 2025-10-16 | TSG Cabinets | 63M. Kitchen cabinets. Deposit | — | $2,138 |
| 2025-10-17 | TSG Cabinets | 63M. Kitchen (Final), wine bar and laundry cabinets | — | $11,373 |
| 2025-10-21 | Home Depot | Cabinet Screw | — | $63 |
| 2025-11-17 | Urbandi | 63M. Floating Shelves | — | $1,145 |
| 2025-11-24 | Home Depot | 63M. Vanities Paint Materials | — | $74 |
| 2025-11-25 | Ferguson Home/Ferguson | 63M. Cabinet Bar Pulls | — | $904 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-12-04 | SP Stone & Tile Corp | 63M. Countertops. Pmt 1 | — | $5,233 |
| 2025-12-11 | SP Stone & Tile Corp | Countertops Pmt 2 | — | $5,000 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-10-15 | Buildesign Home Improvement, LLC | 63M. Worked in Carpentry book shelves/Mud room | — | $906 |
| 2025-10-29 | Buildesign Home Improvement, LLC | 63M. Worked install vanities / Worked in kitchen cabinets | — | $888 |
| 2025-11-05 | Buildesign Home Improvement, LLC | 63M. Worked in carpentry books shelves / Worked in carpentry books shelves, bench and trim | — | $1,416 |
| 2025-11-12 | Buildesign Home Improvement, LLC | 63M. Worked in kitchen cabinets | — | $780 |
| 2025-11-19 | Buildesign Home Improvement, LLC | 63M. Worked in kitchen cabinet | — | $609 |
| 2025-11-26 | Buildesign Home Improvement, LLC | 63M. Worked in kitchen cabinets | — | $714 |
| 2025-12-10 | Buildesign Home Improvement, LLC | 63M. B. Worked install closet pole and cabinet hardware / Worked install kitchen, hardware and miscellaneous / Worked in Kitchen cabinet trim / Worked in reinstalled vanities in primary bathroom | — | $1,002 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-11-19 | Home Depot | 63M. Cabinet Hardware Materials | — | $213 |
| 2025-11-26 | Home Depot | Cabinet knobs | — | $80 |
| 2025-11-26 | — | 63M. Cabinet Hardware Materials | — | $-79 |
| 2025-12-09 | Amazon | 63M. Wine glass racks | — | $19 |
| 2025-12-22 | Home Depot | 63M. Cabinet Knobs | — | $10 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-09-22 | Jaeger Lumber | 63M. Trim Materials | — | $11,436 |
| 2025-09-30 | Jaeger Lumber | 63M.Basic Trim Material | — | $427 |
| 2025-10-01 | Jaeger Lumber | 63M Trim Materials | — | $69 |
| 2025-10-07 | Jaeger Lumber | 63M Trim Materials | — | $727 |
| 2025-10-11 | — | Invoice number 2421351, cust ref 63 MONTCLAIR, order number 12117430 | — | $-66 |
| 2025-10-16 | Jaeger Lumber | 63M_Trim Materials | — | $171 |
| 2025-10-18 | Jaeger Lumber | 63M_Trim Materials | — | $96 |
| 2025-10-22 | Jaeger Lumber | 63M_Trim Materials | — | $1,463 |
| 2025-10-22 | Jaeger Lumber | 63M_Trim Materials | — | $3,646 |
| 2025-10-30 | Jaeger Lumber | 63M_Trim Materials | — | $177 |
| 2025-11-04 | Blue Ridge Lumber | 63MBead Board & Crown | — | $1,072 |
| 2025-12-03 | Buildesign Home Improvement, LLC | 63M. Worked Kitchen trim / Worked Kitchen trim | — | $852 |
| 2025-12-17 | Buildesign Home Improvement, LLC | 63M. B. Worked in trim detail and hardware door | — | $372 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-10-01 | Buildesign Home Improvement, LLC | 63M. Worked trim | — | $384 |
| 2025-10-08 | Buildesign Home Improvement, LLC | 63M. Worked in Trim | — | $3,348 |
| 2025-10-08 | J & M Contractors LLC | 63M. Installing molding and working on the chimney | — | $250 |
| 2025-10-15 | Buildesign Home Improvement, LLC | 63M. Worked in Trim | — | $2,208 |
| 2025-10-22 | Buildesign Home Improvement, LLC | 63M. Details in trim | — | $1,656 |
| 2025-10-29 | Buildesign Home Improvement, LLC | 63M. Worked install shoe molding in basement / Carpentry access panels | — | $606 |
| 2025-11-05 | Buildesign Home Improvement, LLC | 63M. Worked in paneling in powder room | — | $150 |
| 2025-11-19 | Buildesign Home Improvement, LLC | 63M. Worked in shoe molding / Worked in trim | — | $540 |
| 2025-11-26 | Buildesign Home Improvement, LLC | 63M. Install shoe molding / Worked trim / Kitchen trim / Worked trim detail in basement / Worked in stairs case trim detail | — | $1,578 |
| 2025-12-10 | Buildesign Home Improvement, LLC | 63M. Worked kitchen trim | — | $300 |
| 2025-12-17 | Buildesign Home Improvement, LLC | 63M. Worked in trim around the base column front porch | — | $402 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-09-22 | Blue Ridge Lumber | Interior Door Materials | — | $6,886 |
| 2025-09-22 | Blue Ridge Lumber | Interior Door Materials | — | $753 |
| 2025-09-30 | Blue Ridge Lumber | 2025.09.22_Interior Door_Invoice# 407940_$753.45 | — | $15 |
| 2025-09-30 | Blue Ridge Lumber | 2025.09.22_Interior Doors_Invoice# 407942_$6,885.81 | — | $138 |
| 2025-10-30 | Blue Ridge Lumber | 2025.09.22_Interior Door_Invoice# 407940_$753.45 | — | $15 |
| 2025-10-30 | Blue Ridge Lumber | 2025.09.22_Interior Doors_Invoice# 407942_$6,885.81 | — | $138 |
| 2025-12-03 | — | Credited ($49.50) thru Pay Pal | — | $-50 |
| 2026-01-08 | Blue Ridge Lumber | 63M_Smooth Door | — | $178 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-10-08 | Buildesign Home Improvement, LLC | 63M. Worked in Fireplace Carpentry | — | $300 |
| 2025-10-15 | Buildesign Home Improvement, LLC | 63M. Worked in Coffered Ceiling / Fireplace | — | $2,028 |
| 2025-10-15 | J & M Contractors LLC | 63M. Installing Molding and working in the fireplace | — | $250 |
| 2025-12-10 | Buildesign Home Improvement, LLC | 63M. Worked laundry carpentry | — | $198 |
| 2025-12-17 | Buildesign Home Improvement, LLC | 63M. Worked in trim on custom window | — | $372 |
| 2025-12-17 | J & M Contractors LLC | 63M. Working on the fireplace | — | $245 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-10-08 | Buildesign Home Improvement, LLC | 63M. Worked in Closet | — | $1,920 |
| 2025-10-15 | Buildesign Home Improvement, LLC | 63M. Worked in Closet | — | $384 |
| 2025-10-22 | Buildesign Home Improvement, LLC | 63M. Worked in closets | — | $414 |
| 2025-12-10 | Buildesign Home Improvement, LLC | 63M. B. Worked install closet pole and cabinet hardware | — | $198 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-07-30 | J & M Contractors LLC | interior carpentry labor and pulling out nails from the walls. | — | $440 |
| 2025-08-06 | J & M Contractors LLC | 63M. Interior Carpentry | — | $440 |
| 2025-09-29 | Staples | Closet Plan - Printing | — | $0 |
| 2025-10-01 | Buildesign Home Improvement, LLC | 63M. We working in Receive materials, doors and trim / Check Work | — | $384 |
| 2025-10-08 | J & M Contractors LLC | 63M. Installing windows/ Side door | — | $470 |
| 2025-10-15 | Buildesign Home Improvement, LLC | 63M. Worked in Carpentry | — | $150 |
| 2025-10-22 | Buildesign Home Improvement, LLC | 63M. Worked on Carpentry | — | $222 |
| 2025-12-10 | Buildesign Home Improvement, LLC | 63M. Worked miscellaneous | — | $192 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-10-01 | Buildesign Home Improvement, LLC | 63M. Install Doors | — | $1,152 |
| 2025-10-08 | Buildesign Home Improvement, LLC | 63M. Worked in Door | — | $414 |
| 2025-12-17 | Buildesign Home Improvement, LLC | 63M. Worked hardware door and install doorstop | — | $390 |
| 2025-12-17 | J & M Contractors LLC | 63M. Installing door locks | — | $270 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-09-24 | J & M Contractors LLC | 63M. Cleaning the entire house | — | $110 |
| 2025-11-05 | Buildesign Home Improvement, LLC | 63M. Check the project | — | $75 |
| 2025-11-12 | Buildesign Home Improvement, LLC | 63M. Worked in Cleanup moved materials | — | $372 |
| 2025-11-19 | Buildesign Home Improvement, LLC | 63M. Worked on Protect the floor / Worked protection in bathroom floors | — | $1,038 |
| 2025-12-10 | Buildesign Home Improvement, LLC | 63M. Worked move material and clean up | — | $576 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2026-01-07 | J and R Railings Inc. | 63M. Interior post, Spindle & Railing. Final Payment Invoice | — | $2,132 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-11-21 | J and R Railings Inc. | 63M. Interior Railings. Downpayment | — | $2,132 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-09-04 | Home Depot | 63M. Door Knobs | — | $43 |
| 2025-09-22 | Home Depot | 63M. Interior Door | — | $192 |
| 2025-11-21 | Wayfair | 63M. Laurel Privacy Door Knob - sample knob (Kwikset) | — | $55 |
| 2025-11-25 | Amazon | 63M. Sample Schlage Privacy Knob | — | $34 |
| 2025-11-29 | Home Depot | 63M. Door Stopper | — | $106 |
| 2025-12-03 | Door Locks Direct | 63M. Door Knobs | — | $685 |
| 2025-12-03 | Door Locks Direct | 63M. Door Knobs | — | $477 |
| 2025-12-03 | Amazon | 63M. Door hardware | — | $139 |
| 2025-12-04 | Ferguson Home/Ferguson | 63M. Pocket Door Lock | — | $29 |
| 2025-12-12 | Home Depot | Door Accessories | — | $60 |
| 2025-12-20 | Home Depot | Door Stop | — | $22 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-07-31 | Jaeger Lumber | Trim Materials | — | $29 |
| 2025-09-22 | Home Depot | 63M. Trim Materials | — | $192 |
| 2025-09-26 | Home Depot | 63M. Trim Materials | — | $246 |
| 2025-10-08 | Home Depot | 63M. Trim Materials | — | $172 |
| 2025-10-17 | Home Depot | 63M. Trim Materials | — | $91 |
| 2025-10-21 | Home Depot | Trim Screw | — | $62 |
| 2025-11-05 | QXO | 63M. SS Trim (Nails) | — | $32 |
| 2025-12-04 | Home Depot | Carpentry Materials | — | $124 |
| 2025-12-08 | Jaeger Lumber | 63M_Trim Materials | — | $72 |
| 2025-12-09 | Sheppard Brackets | 63M. Shell Bracket | — | $300 |
| 2025-12-09 | Jaeger Lumber | 63M_Trim Materials | — | $75 |
| 2025-12-12 | Home Depot | Carpentry Materials | — | $166 |
| 2025-12-12 | Jaeger Lumber | 63M _Trim Materials | — | $62 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-10-17 | Home Depot | 63M. Carpentry Materials | — | $19 |
| 2025-11-29 | Home Depot | 63M. Hat & Coat Hools | — | $9 |
| 2025-11-29 | Home Depot | 63M. Closet Materials | — | $366 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-10-07 | Jaeger Lumber | 63M_Specialty Trim materials | — | $272 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-11-12 | Home Depot | 63M. Floor Protection | — | $239 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-10-14 | Home Depot | 63M. Bench Carpentry Materials | — | $64 |
| 2025-12-19 | Home Depot | Hand Railing | — | $136 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-09-17 | Home Depot | 63M. Carpentry Materials | — | $140 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-12-04 | Fabian's Painting LLC | 63 Montclair Ave. Paint Labor. Pmt 2 $3k. Pmt 3 $2k. Pmt 4 $4k. | — | $9,000 |
| 2025-12-18 | Fabian's Painting LLC | 63M. Paint Labor_Payment 5 & 7 | — | $5,000 |
| 2025-12-24 | Fabian's Painting LLC | 63M. Paint Labor. Pmt 6, 8, & 9 | — | $2,900 |
| 2026-01-22 | Fabian's Painting LLC | 63M. Paint Labor. Pmt 10 | — | $1,500 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-11-17 | Anthropologie | 63M. Sunshine Masquerade Wallpaper | — | $318 |
| 2025-11-17 | Mitchell Black | 63M. Jandaya High Wallpaper | — | $251 |
| 2025-12-15 | Mitchell Black | 63M. Addl't Jandaya High Wallpaper | — | $548 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-11-17 | Fabian's Painting LLC | 63M. Downpayment | — | $1,000 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-12-24 | Buildesign Home Improvement, LLC | 63M. We worked on stain front porch ceiling | — | $714 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2026-01-02 | Wallworks Painting & Wallpaper | 63M. Wallpaper Installation Labor | — | $700 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-12-24 | Buildesign Home Improvement, LLC | 63M. Worked stain front door | — | $222 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-11-26 | Buildesign Home Improvement, LLC | 63M. Protect basement floor | — | $192 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-12-17 | Sherwin Williams | Paint Materials | — | $71 |
| 2025-12-18 | Home Depot | Stain Materials | — | $111 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-10-17 | Jaeger Lumber | 63M_Paint Material | — | $18 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-11-28 | Tor Glass | 63M. Frameless Glass Enclosures and Mirrors Pmt 1 - Deposit | — | $1,300 |
| 2025-12-11 | Tor Glass | 63M. Pmt 2. Final | — | $1,300 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-11-19 | Amazon | 63M. Mirrors | — | $488 |
| 2025-11-19 | Wayfair | 63M. Attic Mirror | — | $88 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-12-10 | Buildesign Home Improvement, LLC | 63M. Worked install bathroom accessories | — | $222 |
| 2025-12-17 | Buildesign Home Improvement, LLC | 63M. Worked installing bathroom accessories | — | $222 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-11-26 | Home Depot | Towel Bar | — | $79 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-12-03 | Steel Appliances | 63M. Renaissance Appliances | — | $12,469 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-12-17 | Buildesign Home Improvement, LLC | 63M. Worked in install appliances | — | $522 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-08-25 | Jaeger Lumber | Deck Materials | — | $141 |
| 2025-10-02 | Abbe Lumber Corporation | Back Deck Trex | — | $3,199 |
| 2025-10-31 | Abbe Lumber Corporation | 63M_Front Porch Trex | — | $2,019 |
| 2025-11-28 | Home Depot | 63M0 Decking Materials | — | $88 |
| 2025-11-29 | Home Depot | 63M. Lattice Materials | — | $261 |
| 2025-12-01 | Jaeger Lumber | 63M_Porch Materials | — | $1,272 |
| 2025-12-06 | Jaeger Lumber | 63M Porch Materials | — | $1,184 |
| 2025-12-11 | Home Depot | 63M. Front Porch Materials | — | $126 |
| 2025-12-11 | Home Depot | 63M. Front Porch Materials | — | $21 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-09-03 | J & M Contractors LLC | 63M. Porch Labor | — | $540 |
| 2025-10-15 | Buildesign Home Improvement, LLC | 63M. Worked in Decking | — | $372 |
| 2025-10-22 | Buildesign Home Improvement, LLC | 63M. Worked decking boards | — | $522 |
| 2025-11-19 | Buildesign Home Improvement, LLC | 63M. Deck front porch framing / Worked in front porch support and framing | — | $192 |
| 2025-11-20 | J & M Contractors LLC | 63M. working on the porch. | — | $790 |
| 2025-11-26 | Buildesign Home Improvement, LLC | 63M. Worked in decking boards | — | $180 |
| 2025-12-03 | Buildesign Home Improvement, LLC | 63M. Worked balcony railing / Worked framing for lattice in deck / Framing for lattice in front porch | — | $1,776 |
| 2025-12-03 | J & M Contractors LLC | 63M. Deck Work | — | $270 |
| 2025-12-10 | Buildesign Home Improvement, LLC | 63M. Worked Install lattice on deck / Worked Install lattice on front porch / Worked on buy material and install baedboard panel on porch | — | $2,118 |
| 2025-12-10 | J & M Contractors LLC | 63M. Deck labor and emptying out the garage. | — | $220 |
| 2025-12-17 | Buildesign Home Improvement, LLC | 63M. Worked in make stair on front porch / Worked install railing on front porch | — | $894 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-12-03 | Buildesign Home Improvement, LLC | 63M. Platform for A/C condenser | — | $384 |
| 2025-12-03 | J & M Contractors LLC | 63M. Building Platform for condensers | — | $220 |
| 2025-12-10 | Buildesign Home Improvement, LLC | 63M. Worked pvc in front porch gable | — | $222 |
| 2025-12-17 | Buildesign Home Improvement, LLC | 63M. Worked on pvc carpentry work on front porch | — | $1,530 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-08-26 | Jaeger Lumber | Deck Materials | — | $140 |
| 2025-10-02 | Jaeger Lumber | 63M_Deck Materials | — | $21 |
| 2025-10-29 | Jaeger Lumber | 63M. Framing Materials | — | $291 |
| 2025-11-15 | Jaeger Lumber | 63M_Deck Materials | — | $211 |
| 2025-11-28 | Jaeger Lumber | 63M_Porch Material | — | $561 |
| 2025-11-28 | Jaeger Lumber | 63M_Porch Material | — | $38 |
| 2025-11-28 | Jaeger Lumber | 63M_Porch Material | — | $74 |
| 2025-12-04 | — | 63M_Refund_Invoice# 2451058_Credit Note# 154683 | — | $-70 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-11-20 | J & M Contractors LLC | 63M. Working in the chimney | — | $270 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-10-30 | Amazon | 63M. Mailbox | — | $97 |
| 2025-11-19 | Home Depot | 63M. House Number | — | $23 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-12-12 | Garden State Construction (Asphalt) | 63M. Driveway | — | $5,200 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-10-29 | Home Depot | 120B. Masonry Materials - Mortar Mix | — | $9 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-12-04 | A-R General Contractor_Alberto Landscape & Snow Removal | 63M_Final Landscaping_Deposit_Pmt 1, 2, 3, 4, 5 & 6 | — | $5,000 |
| 2025-12-11 | A-R General Contractor_Alberto Landscape & Snow Removal | 63M_Final Landscaping_Pmt 1(P2o2), Pmt 2(P2o2), Pmt 3(P2o2) & Pmt 5(P2o2) | — | $4,220 |
| 2025-12-18 | A-R General Contractor_Alberto Landscape & Snow Removal | 63 Montclair Ave. Landscaping. Pmt 4 P2o2 $630. Pmt 6 P2o2 $700. Pmt 7 $450 | — | $1,780 |
| 2025-12-18 | A-R General Contractor_Alberto Landscape & Snow Removal | CO1 $100. Driveway Clean up. Additional line in Invoice. | CO - Change Orders (deleted) | $100 |
| 2025-12-26 | A-R General Contractor_Alberto Landscape & Snow Removal | 63M_CO2_Final Landscaping | — | $850 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-07-25 | A-R General Contractor_Alberto Landscape & Snow Removal | Tree removal and trimming. | — | $5,800 |
| 2025-08-15 | A-R General Contractor_Alberto Landscape & Snow Removal | CO_ Tree Removal | — | $5,500 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-07-30 | J & M Contractors LLC | 88.7 site clean up | — | $110 |
| 2025-08-01 | — | 63M Payment from Daniel Jones(Neighbor) Tree removal. | — | $-2,750 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-12-24 | Buildesign Home Improvement, LLC | 63M. We worked on punch list | — | $2,420 |
| 2026-01-14 | Buildesign Home Improvement, LLC | 63M. Inspection / Work detail for home inspection / Worked in punch list | — | $650 |
| 2026-01-21 | Buildesign Home Improvement, LLC | 63M. Punch list | — | $186 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-11-22 | American Royal Hardware | 63M. Punchlist Materials | — | $20 |
| 2025-12-12 | Home Depot | 63M. Punchlist Materials | — | $10 |
| 2025-12-13 | Home Depot | 63M. Punchlist Materials | — | $93 |
| 2026-01-08 | Home Depot | Shower Materials | — | $96 |
| 2026-01-10 | Home Depot | Punch List | — | $10 |
| 2026-01-13 | American Royal Hardware | Glass | — | $43 |