| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-02-01 | Garfinkel Design Group LLC | Acceptance Fee | — | $3,000 |
| 2024-03-19 | Garfinkel Design Group LLC | Architectural Plans.Payment 2. | — | $4,500 |
| 2024-04-10 | Staples | Receipt for prints | — | $80 |
| 2024-04-19 | Garfinkel Design Group LLC | Architectural Plans.Payment 3. 12 sets printing included | — | $2,294 |
| 2024-06-03 | Garfinkel Design Group LLC | HPC Extra Time | — | $3,501 |
| 2024-10-17 | Staples | receipt for Lighting Layout | — | $27 |
| 2024-12-16 | Staples | Kitchen Vanities | — | $34 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-02-21 | Borough of Glen Ridge | Zoning Compliance / Change of ownership | — | $250 |
| 2024-07-24 | Borough of Glen Ridge | Renovation Construction Permit fee | — | $5,062 |
| 2025-07-08 | Borough of Glen Ridge | 76M. Fire Dept Inspection | — | $250 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-03-13 | JM Structural Consulting LLC | Site Visit & Design Consultation | — | $3,500 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-03-05 | Safehouse Title Agency LLC | Hud line line 1305. Survey fee | — | $750 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-12-31 | J & M Contractors LLC | 2025 Project Supervision | — | $23,355 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-09-26 | Ashpa Management | Roll Off Recycle and Concrete | — | $780 |
| 2024-10-07 | Ashpa Management | Roll Off and Dumping | — | $861 |
| 2024-11-06 | Ashpa Management | Roll Off and Dumping | 76 Midland (deleted) | $686 |
| 2024-11-26 | Ashpa Management | Roll Off and Dumping | 76 Midland (deleted) | $946 |
| 2025-01-29 | Ashpa Management | Roll off and Dumping | — | $645 |
| 2025-03-06 | Ashpa Management | Dumpster | — | $805 |
| 2025-04-10 | Ashpa Management | Roll Off and Dumping | — | $696 |
| 2025-05-02 | Ashpa Management | Roll off and dumping | — | $559 |
| 2025-05-16 | Ashpa Management | Roll off and dumping | — | $572 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-10-17 | J & M Contractors LLC | cleaning and loading the dumpster. | — | $110 |
| 2024-11-04 | Ashpa Management | Roll Off and Dumping | — | $826 |
| 2024-11-04 | Ashpa Management | Roll Off and Dumping | — | $742 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-09-24 | Ashpa Management | Porta | — | $135 |
| 2024-10-22 | Ashpa Management | Porta | — | $135 |
| 2024-11-19 | Ashpa Management | Portable Comfort Stations | 76 Midland (deleted) | $135 |
| 2024-12-17 | Ashpa Management | Porta Rental | 76 Midland (deleted) | $135 |
| 2025-01-14 | Ashpa Management | 76M. Portable Comfort Stations.Invoice# 3131971 | — | $135 |
| 2025-02-11 | Ashpa Management | Porta Rental - 2/11-3/10 | 76 Midland (deleted) | $135 |
| 2025-03-11 | Ashpa Management | Porta Comfort Station - 3/11-4/27 | — | $135 |
| 2025-04-09 | Ashpa Management | Portable Comfort Station | — | $135 |
| 2025-05-07 | Ashpa Management | Portable Comfort Station 76 Midland Ave - 5/7-6/3 | — | $135 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-11-04 | Ashpa Management | Porta | — | $135 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-03-12 | Amazon | Lock key and Door knob | — | $36 |
| 2024-03-29 | E.L. Congdon & Sons Lumber Co | Brackets and nails. This was purchased to secure the property. | — | $79 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-10-24 | Simple Tank Services | Tank Removal_Deposit | — | $488 |
| 2025-01-21 | Simple Tank Services | Tank Removal | — | $488 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-08-22 | J & J Demo LLC | Down Payment | — | $2,000 |
| 2024-09-22 | J & J Demo LLC | Pmt 3 - Complete House Demo to Studs | — | $6,200 |
| 2024-09-22 | J & J Demo LLC | Final Payment - Final Cleanup | — | $2,000 |
| 2024-11-07 | J & J Demo LLC | Garage and house garbage removal | — | $1,800 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-10-02 | Eduar Raudales | Complete demo of existing Basement Slab | — | $1,000 |
| 2025-01-16 | J & M Contractors LLC | Demolishing the stairs and Loading the dumpster with trash. | — | $970 |
| 2025-01-20 | J & M Contractors LLC | JJ's Pay. B | — | $193 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-12-18 | Ashpa Management | Roll off and Dumping | — | $1,014 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-10-08 | Eduar Raudales | Complete pour of new basement slab and pier footings | — | $2,500 |
| 2024-10-11 | Buildesign Home Improvement, LLC | Foundation Labor - Wk of 2024.10.09 | — | $810 |
| 2024-11-07 | J & M Contractors LLC | repairing the basement columns and cleaning the entire house. | — | $950 |
| 2025-02-14 | J & M Contractors LLC | Installing pocket doors,Laundry cabinets, and repairing the house footing. B | — | $707 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-10-01 | E.L. Congdon & Sons Lumber Co | Basement slab materials | — | $1,600 |
| 2024-10-04 | Quick Concrete Ready Mix | Basement Slab | — | $1,966 |
| 2025-06-03 | Home Depot | Foundation Materials | — | $26 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-10-08 | Eduar Raudales | Install French drain | — | $1,000 |
| 2025-03-05 | Buildesign Home Improvement, LLC | Drainage Labor | — | $516 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-04-03 | J & M Contractors LLC | Foundation labor | — | $500 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-07-08 | J & M Contractors LLC | 76M. Sump pump work | — | $135 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-10-01 | — | Refund/Return Basement Slab Material | — | $-197 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-03-27 | J & M Contractors LLC | ACH. 76M. Basic Trim Labor ($1,910), 69.4 Drywall/Spackle Labor ($540), 72.4 Floor Tile Labor ($750), 44.4 Excavation/Backfill/Grading ($500), 56.4 Interior Stair Labor ($510), 82.5 Deck/Porch Labor (carpentry) ($840), 67.4 Insulation/Fire Stop Labor ($460) | — | $500 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-11-07 | J & M Contractors LLC | cleaning the walls and taking out nails and screws. | — | $240 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-09-22 | Bergen-Essex Contractors Inc | Pmt 1 - Down Payment | — | $3,000 |
| 2024-09-22 | Bergen-Essex Contractors Inc | Pmt 2 - 1st Floor Deck & Walls (Part 1 of 2) | — | $4,500 |
| 2024-09-22 | Bergen-Essex Contractors Inc | Pmt 3 - 2nd Floor Deck & Walls (Part 1 of 2) | — | $2,500 |
| 2024-10-02 | Buildesign Home Improvement, LLC | Check framing and Measure Window | — | $300 |
| 2024-10-08 | Bergen-Essex Contractors Inc | Pmt 2 - 1st Floor Deck & Walls (Part 2 of 2) | — | $500 |
| 2024-10-08 | Bergen-Essex Contractors Inc | Pmt 3 - 2nd Floor Deck & Walls (Part 2 of 2) | — | $2,500 |
| 2024-10-08 | Bergen-Essex Contractors Inc | Pmt 4 - Attic Deck and Walls and Roof | — | $5,000 |
| 2024-10-16 | Bergen-Essex Contractors Inc | Pmt 5 - Basement Framing | — | $5,000 |
| 2024-10-17 | J & M Contractors LLC | Doing framing and building plumbing boxes for the bathrooms.B | — | $130 |
| 2024-10-23 | Buildesign Home Improvement, LLC | Check Framing | — | $150 |
| 2024-10-30 | Buildesign Home Improvement, LLC | Met with Andrew for Kitchen layout and framing details | — | $150 |
| 2024-11-07 | J & M Contractors LLC | framing for master shower ,Repairing the kitchen tile, installing Sheetrock , spackle, working in the mechanical room in the attic. B | — | $417 |
| 2024-11-21 | Bergen-Essex Contractors Inc | Pmt 7 - Final Pmt - Pass Inspection | — | $7,000 |
| 2024-11-29 | Bergen-Essex Contractors Inc | Pmt 6 - Stair Installation, HVAC Soffits, All Windows and Exterior Door Installation (Part 1 of 2) | — | $2,625 |
| 2024-12-17 | J & M Contractors LLC | The guys were doing framing for the HVAC ducts. | — | $535 |
| 2025-01-16 | J & M Contractors LLC | Installation of molding, framing, closet, and electric work. Wk 01.066-12.205 | — | $1,230 |
| 2025-01-20 | J & M Contractors LLC | JJ's Pay. B | — | $244 |
| 2025-02-13 | Bergen-Essex Contractors Inc | Pmt 6 - Stair Installation, HVAC Soffits, All Windows and Exterior Door Installation (Part 2 of 2) | 76 Midland (deleted) | $875 |
| 2025-02-13 | Bergen-Essex Contractors Inc | CO1 - Pmt 2. Attic Floor Joist & Beam locations | 76 Midland (deleted) | $750 |
| 2025-02-13 | Bergen-Essex Contractors Inc | CO1 - Pmt 3. 1st Floor Rear Existing Kitchen Location | 76 Midland (deleted) | $500 |
| 2025-02-13 | Bergen-Essex Contractors Inc | CO1 - Pmt 1. Front Entry Location | 76 Midland (deleted) | $1,250 |
| 2025-03-05 | Buildesign Home Improvement, LLC | Framing Labor | — | $246 |
| 2025-03-13 | Buildesign Home Improvement, LLC | We working in framing | — | $2,610 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-08-27 | Huston Lumber | Framing Materials | — | $2,034 |
| 2024-10-11 | Home Depot | Framing materials. 11965 | — | $94 |
| 2024-11-03 | Blue Ridge Lumber | Inv# 280981 | — | $5,447 |
| 2024-11-03 | Blue Ridge Lumber | Inv# 283106 | — | $2,354 |
| 2024-11-03 | Blue Ridge Lumber | Inv# 283583 | — | $704 |
| 2024-11-03 | Blue Ridge Lumber | Inv# 285948 | — | $3,948 |
| 2024-11-03 | Blue Ridge Lumber | Inv# 287647 | — | $2,352 |
| 2024-11-05 | Jaeger Lumber | Framing Matearials | — | $4,081 |
| 2025-01-09 | Jaeger Lumber | Framing Materials | — | $2,456 |
| 2025-02-10 | Home Depot | Framing materials | — | $263 |
| 2025-02-12 | Home Depot | Framing materials | — | $77 |
| 2025-02-13 | Home Depot | Cedar undercourse shingle | — | $18 |
| 2025-02-28 | Kuiken Brothers Company Inc | Variance Framing Modification Material | RW - Rework Variances (deleted) | $1,381 |
| 2025-03-04 | Kuiken Brothers Company Inc | 76 m Beam | — | $86 |
| 2025-03-27 | Home Depot | Framing Modifications. Reimburse to J&M. | RW - Rework Variances (deleted) | $251 |
| 2025-03-27 | Home Depot | Framing Modifications. Reimburse to J&M. | RW - Rework Variances (deleted) | $38 |
| 2025-03-27 | Home Depot | Framing Modifications. Reimburse to J&M. | RW - Rework Variances (deleted) | $51 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-12-13 | Jaeger Lumber | Lumber_Invoice# 2249857 | — | $409 |
| 2025-01-29 | Jaeger Lumber | Stairs Framing_Invoice# 2270881 | — | $136 |
| 2025-02-04 | Jaeger Lumber | 76M.Lumber_Invoice# 2273976 | — | $865 |
| 2025-02-05 | Jaeger Lumber | Lumber_Invoice# 2274256 | — | $224 |
| 2025-02-06 | Jaeger Lumber | Framing_Invoice# 2275140 | — | $118 |
| 2025-02-07 | Jaeger Lumber | Framing_Invoice# 2276003 | — | $487 |
| 2025-02-14 | Jaeger Lumber | Framing Ceiling_Invoice# 2279060 | — | $371 |
| 2025-02-17 | Jaeger Lumber | Framing_Invoice# 2280115 | — | $112 |
| 2025-02-25 | Jaeger Lumber | 76M.Framing update_Invoice# 2284800 | — | $286 |
| 2025-03-03 | Jaeger Lumber | 76M |2025.03.03_Framing update_Invoice# 2287686_$201.31 | — | $201 |
| 2025-03-05 | Jaeger Lumber | Framing Materials | — | $106 |
| 2025-03-05 | Jaeger Lumber | Framing Materials | — | $246 |
| 2025-03-11 | — | "Cash Sale Refund. Invoice number 2156511, order number 10834340" | RW - Rework Variances (deleted) | $-62 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-12-05 | J & M Contractors LLC | Invoice_2024.11.25-12.01. Framing | — | $515 |
| 2025-03-13 | J & M Contractors LLC | framing update | — | $800 |
| 2025-03-13 | J & M Contractors LLC | framing update and relocating plumbing pipes and electric wires. B | — | $630 |
| 2025-04-03 | J & M Contractors LLC | Repairing doors and Reinforcing garage roof | — | $720 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-09-26 | National Building Supply | Roofing Materials | — | $4,500 |
| 2024-10-01 | Home Depot | Roofing materials. 86748 | — | $17 |
| 2024-10-01 | Home Depot | Roofing materials | — | $254 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-10-16 | Blue Eagle Construction LLC | Roofing Full Payment | — | $3,080 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-06-11 | Home Depot | Splash Blocks | — | $19 |
| 2025-06-20 | Lucky Gutters LLC | 76M. Pmt & Pmt 2 | CO - Change Orders (deleted) | $2,200 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-11-07 | Blue Ridge Lumber | Windows_Invoice# 307178 | — | $23,701 |
| 2024-11-15 | Blue Ridge Lumber | 76M. Windows_Invoice# 310134 | — | $2,951 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-08-01 | NJ Garage | Garage Doors Repair | — | $1,090 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-04-16 | Amazon | Front Door Handle Set | — | $193 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-07-09 | American Royal Hardware | Garage Windows | — | $53 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-01-16 | J & M Contractors LLC | Redoing attic stairs. Wk 01.066-12.205 | — | $2,460 |
| 2025-01-20 | J & M Contractors LLC | JJ's Pay. B | — | $488 |
| 2025-02-07 | J & M Contractors LLC | Redoing the attic stairs Installing molding and doing spackle. B | — | $330 |
| 2025-02-20 | Buildesign Home Improvement, LLC | We working in attic stairs | — | $1,420 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-12-19 | J and R Railings Inc. | Interior Stairs_Deposit | — | $1,380 |
| 2025-01-16 | J and R Railings Inc. | Interior Stairs. Pmt 2. Final | — | $1,380 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-01-13 | Home Depot | Interior stairs | — | $61 |
| 2025-02-11 | Home Depot | Attic stairs materials | — | $887 |
| 2025-02-12 | Home Depot | Attic stairs materials | — | $108 |
| 2025-02-15 | Home Depot | Attic stairs materials | — | $152 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-01-07 | Jaeger Lumber | Bathroom stairs_Invoice# 2259844 | — | $405 |
| 2025-02-11 | Jaeger Lumber | Stairs_Invoice# 2277456 | — | $433 |
| 2025-02-14 | Jaeger Lumber | .Stairs_Invoice# 2279396 | — | $113 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-03-27 | J & M Contractors LLC | ACH. 76M. Basic Trim Labor ($1,910), 69.4 Drywall/Spackle Labor ($540), 72.4 Floor Tile Labor ($750), 44.4 Excavation/Backfill/Grading ($500), 56.4 Interior Stair Labor ($510), 82.5 Deck/Porch Labor (carpentry) ($840), 67.4 Insulation/Fire Stop Labor ($460) | — | $510 |
| 2025-04-30 | J & M Contractors LLC | Interior Stair labor | — | $120 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-10-31 | Home Depot | Siding materials | 76 Midland (deleted) | $286 |
| 2025-04-16 | The Siding Depot | Cedar Siding | — | $11,129 |
| 2025-04-25 | Home Depot | Siding Material | — | $222 |
| 2025-04-26 | Home Depot | Siding Material | — | $167 |
| 2025-04-29 | Kuiken Brothers Company Inc | Siding Materials | — | $3,684 |
| 2025-05-01 | Jaeger Lumber | Siding materials | — | $61 |
| 2025-05-02 | Home Depot | Siding materials | — | $88 |
| 2025-05-02 | Home Depot | Siding Materials | — | $355 |
| 2025-05-05 | Home Depot | Siding Material | — | $79 |
| 2025-05-07 | The Siding Depot | Additional siding material | — | $4,738 |
| 2025-05-12 | Home Depot | Siding materials | — | $60 |
| 2025-05-12 | Home Depot | Siding Materials | — | $39 |
| 2025-05-15 | Home Depot | Siding Materials | — | $39 |
| 2025-05-27 | Home Depot | Siding Materials | — | $130 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-04-30 | Buildesign Home Improvement, LLC | We working in siding | — | $1,176 |
| 2025-05-07 | Buildesign Home Improvement, LLC | Siding labor | — | $3,153 |
| 2025-05-14 | Buildesign Home Improvement, LLC | Siding Labor | — | $2,244 |
| 2025-05-21 | Buildesign Home Improvement, LLC | Working in siding | — | $2,640 |
| 2025-05-28 | Buildesign Home Improvement, LLC | Siding | — | $2,524 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-04-25 | Beacon | Siding Materials | — | $533 |
| 2025-04-28 | Blue Ridge Lumber | E Prime | — | $5,391 |
| 2025-05-08 | Blue Ridge Lumber | Siding Materials | — | $609 |
| 2025-05-20 | Blue Ridge Lumber | Siding Materials | — | $645 |
| 2025-05-20 | Blue Ridge Lumber | Siding Materials | — | $339 |
| 2025-05-20 | — | Invoice number 363077, cust ref ., order number 1837875 | — | $-496 |
| 2025-07-30 | — | WRITE OFF | — | $-6 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-04-25 | Beacon | Tyvek | — | $780 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-04-25 | Lowes | Louvered Wood Exterior Shutters | — | $484 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-11-06 | Buildesign Home Improvement, LLC | We working in wrap at the house and inspection | — | $480 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-04-25 | Amazon | 76M. Shutter hinges & holder | — | $161 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-10-23 | Rosario AC & Heating | HVAC Flat Price_Payment 1 & 2 | — | $11,000 |
| 2024-10-31 | Rosario AC & Heating | HVAC Flat Price_Payment 3 | — | $3,000 |
| 2024-11-14 | Rosario AC & Heating | HVAC Flat Price_Payment 4 | — | $3,500 |
| 2025-05-01 | Rosario AC & Heating | Install Condensers | — | $2,500 |
| 2025-07-01 | Rosario AC & Heating | 76M. HVAC Flat Price Final Pmt 6 | — | $4,000 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-07-01 | HVACR Comfort Pro LLC | Manual JS | — | $1,000 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-04-25 | Amazon | Learning Thermostats | — | $489 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-01-02 | Home Depot | HVAC Materials. 11400 | — | $49 |
| 2025-06-14 | Home Depot | Laundry Room Vent - Louvered Exhaust Hood | — | $22 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-10-17 | J & M Contractors LLC | Doing framing and building plumbing boxes for the bathrooms..B | — | $130 |
| 2024-10-31 | Yover Tenezaca (Plumber) | Pmt1 & Pmt 2 | — | $9,766 |
| 2025-07-09 | Yover Tenezaca (Plumber) | Plumbing Labor. Pmt3. Finish | — | $4,884 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-07-17 | Amazon | Delta Faucet | 76 Midland (deleted) | $277 |
| 2024-10-07 | WaterWays Decor | Plumbing materials | — | $2,500 |
| 2025-01-07 | Ferguson Home/Ferguson | Kitchen & Primary bath sinks_Order# 90889757 | 76 Midland (deleted) | $1,431 |
| 2025-04-16 | Ferguson Home/Ferguson | Plumbing Fixtures | — | $2,371 |
| 2025-04-16 | Amazon | Plumbing Fixtures | — | $985 |
| 2025-04-16 | Home Depot | Primary Toilets | — | $398 |
| 2025-04-22 | Ferguson Home/Ferguson | Water Heater System | — | $1,745 |
| 2025-04-24 | Ferguson Home/Ferguson | Wall Mounted Pot Filler | — | $671 |
| 2025-04-28 | Home Depot | Plumbing materials - Sump pump | — | $285 |
| 2025-05-23 | Home Depot | Sump Pump | — | $51 |
| 2025-07-03 | American Royal Hardware | Plumbing Fixtures | — | $32 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-03-07 | J & M Contractors LLC | ACH. 76M. 64.4 Electrical Labor ($530), 63.4 Plumbing Labor ($1,325), Interior Door Labor ($1,590) | — | $1,325 |
| 2025-03-13 | J & M Contractors LLC | framing update and relocating plumbing pipes and electric wires. B | — | $630 |
| 2025-05-08 | J & M Contractors LLC | Plumbing labor | — | $250 |
| 2025-05-14 | J & M Contractors LLC | Plumbing labor | — | $147 |
| 2025-06-04 | J & M Contractors LLC | 76M. Digging for sump pump pipe | — | $110 |
| 2025-11-17 | Yover Tenezaca (Plumber) | 76M. Plumbing Extra_CO | CO - Change Orders (deleted) | $1,300 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-01-07 | WaterWays Decor | Plumbing materials | 76 Midland (deleted) | $2,513 |
| 2025-02-25 | Home Depot | Plumbing materials | — | $45 |
| 2025-03-27 | Home Depot | Plumbing Modification. Reimburse to J&M. | RW - Rework Variances (deleted) | $32 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-08-13 | Grant Supplies | 76M_Electrical Materials | — | $2,116 |
| 2024-10-10 | Grant Supplies | Electrical Materials | — | $3,681 |
| 2024-10-16 | Home Depot | Electrical Rough materials. ** | — | $64 |
| 2024-11-18 | Home Depot | Electrical Rough Materials. 686255` | — | $73 |
| 2024-11-22 | Grant Supplies | Electrical Materials | — | $1,260 |
| 2024-12-13 | Home Depot | Electrical Materials Rough. 676619 | — | $30 |
| 2024-12-20 | Home Depot | Electrical Rough materials. 98523 | — | $1,071 |
| 2024-12-20 | Home Depot | Electrical Materials Rough. 00320 | — | $768 |
| 2025-01-07 | Home Depot | Electrical rough materials. | 76 Midland (deleted) | $206 |
| 2025-01-08 | Home Depot | Electrical Materials Rough | — | $167 |
| 2025-01-10 | Home Depot | Electric and Tile Materials.B . 48208 | — | $116 |
| 2025-01-17 | Home Depot | Electrical Materials Rough | 76 Midland (deleted) | $1,659 |
| 2025-01-31 | Home Depot | Electric materials | — | $588 |
| 2025-03-11 | Home Depot | THE HOME DEPOT #0928 BLOOMFIELD NJ 03/12-Elecrical Materials | — | $181 |
| 2025-05-03 | Grant Supplies | Electrical Materials receipt requested by Andrew; possibly electrical materials for 76 Midland | — | $2,147 |
| 2025-05-06 | Home Depot | Electrical materials | — | $467 |
| 2025-06-11 | Home Depot | Fire extinguisher | — | $53 |
| 2025-06-13 | Home Depot | Roughs | — | $34 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-09-04 | Marcos Moncada | Electrical Labor 8/30 | — | $220 |
| 2024-10-16 | Marcos Moncada | Electrical Labor | — | $550 |
| 2024-10-30 | Marcos Moncada | Electrical Labor | — | $770 |
| 2024-11-07 | Marcos Moncada | Electrical Labor | — | $440 |
| 2024-11-20 | Buildesign Home Improvement, LLC | We working in electricity | — | $720 |
| 2024-11-21 | J & M Contractors LLC | doing electrical work. | — | $1,040 |
| 2024-11-23 | Marcos Moncada | Electrical Labor | — | $770 |
| 2024-11-28 | Marcos Moncada | Electrical Labor | — | $220 |
| 2024-12-11 | J & M Contractors LLC | Invoice_2024.12.02-08. doing electrical work for the HVAC machine. | — | $260 |
| 2025-01-23 | Marcos Moncada | Electrical Labor | — | $660 |
| 2025-01-30 | Marcos Moncada | Zelle payment to Marcos Mancada | — | $880 |
| 2025-02-07 | Marcos Moncada | Electrical Labor | — | $660 |
| 2025-03-13 | Marcos Moncada | Electrical labor | — | $660 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-04-09 | Shades of Light | Ceramic ceiling light | — | $273 |
| 2025-04-16 | Shades of Light | Electrical Fixtures (Vanity Lights, etc) | — | $3,194 |
| 2025-04-25 | Shades of Light | Replacement Kitchen Lights | — | $392 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-12-05 | J & M Contractors LLC | Invoice_2024.11.25-12.01. Electrical | — | $125 |
| 2025-03-07 | J & M Contractors LLC | ACH. 76M. 64.4 Electrical Labor ($530), 63.4 Plumbing Labor ($1,325), Interior Door Labor ($1,590) | — | $530 |
| 2025-03-13 | J & M Contractors LLC | framing update and relocating plumbing pipes and electric wires. B | — | $630 |
| 2025-04-30 | Marcos Moncada | Electrical Labor | — | $440 |
| 2025-05-07 | Marcos Moncada | Electrical Labor | — | $880 |
| 2025-05-21 | Marcos Moncada | Electrical Labor | — | $660 |
| 2025-06-18 | Marcos Moncada | Electrical Labor | — | $220 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-04-08 | Wayfair | 1F PR & 2F hall bath Lights | — | $184 |
| 2025-05-02 | Shades of Light | Alternative hall lights | — | $341 |
| 2025-05-06 | Amazon | 76M LED Light Bulbs | — | $54 |
| 2025-05-06 | Amazon | 76M Light Bulbs | — | $21 |
| 2025-05-07 | Home Depot | Electrical finishes | — | $64 |
| 2025-05-14 | Home Depot | Flood light | — | $53 |
| 2025-05-29 | Prestige Lighting | Downlight | — | $892 |
| 2025-05-30 | Home Depot | Light Bulb | — | $96 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-05-07 | — | Refund for returned electrical mat'l for 76 Midland | — | $-49 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-04-28 | Amazon | Video Doorbell & Chimes | — | $303 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-02-28 | Jaeger Lumber | Fireplace materials_Invoice# 2286629 | — | $199 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-11-21 | Doctor Drywall | Insulation | — | $3,000 |
| 2024-11-21 | Doctor Drywall | Insulation | — | $2,000 |
| 2024-12-05 | Doctor Drywall | Insulation | — | $1,000 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-03-27 | J & M Contractors LLC | ACH. 76M. Basic Trim Labor ($1,910), 69.4 Drywall/Spackle Labor ($540), 72.4 Floor Tile Labor ($750), 44.4 Excavation/Backfill/Grading ($500), 56.4 Interior Stair Labor ($510), 82.5 Deck/Porch Labor (carpentry) ($840), 67.4 Insulation/Fire Stop Labor ($460) | — | $460 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-10-28 | Home Depot | Insulation materials | — | $250 |
| 2025-06-06 | Home Depot | Crawlspace Materials -Sealant | — | $62 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-11-29 | Doctor Drywall | Sheetrock | — | $7,500 |
| 2024-12-26 | Doctor Drywall | ACH - Drywall/Spackle flat price. Pmt 2 ($2,500). Pmt 3 ($2,200). Pmt 4 ($1,700) | — | $6,400 |
| 2024-12-26 | Doctor Drywall | Drywall | — | $6,400 |
| 2025-03-13 | Elite Drywall Contracting LLC | RW. Drywall/Spackle Labor | RW - Rework Variances (deleted) | $2,500 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-11-07 | J & M Contractors LLC | framing for master shower ,Repairing the kitchen tile, installing Sheetrock , spackle, working in the mechanical room in the attic. B | — | $417 |
| 2025-01-23 | J & M Contractors LLC | Installing molding, doors, Sheetrock on stairs and preparing for tile. Wk 1.13-19.2025. B | — | $2,273 |
| 2025-01-30 | J & M Contractors LLC | Installing crown molding, doors, spackle, and tile. Wk 1.20-26.2025. B | — | $1,501 |
| 2025-02-07 | J & M Contractors LLC | installing molding spackle and grout. B | — | $375 |
| 2025-02-07 | J & M Contractors LLC | building closets installing doors and doing spackle. B | — | $330 |
| 2025-02-07 | J & M Contractors LLC | Redoing the attic stairs Installing molding and doing spackle. B | — | $330 |
| 2025-02-14 | J & M Contractors LLC | Installing molding, doors and doing spackle. B | — | $292 |
| 2025-02-20 | J & M Contractors LLC | Basement Spackle Wk 2.10-16.2025 | — | $1,790 |
| 2025-02-27 | J & M Contractors LLC | Installing Sheetrack under the attic stairs, master bathroom ceiling and repairing tile | — | $810 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-12-05 | J & M Contractors LLC | Invoice_2024.11.25-12.01. Drywall | — | $270 |
| 2025-03-20 | J & M Contractors LLC | 76M. 74.6 Interior Carpentry Labor- Basic trim Labor ($2,710), 72.4 Floor Tile Labor ($800), 73.4 Cabinet Labor ($870), 69.4 Drywall/Spackle Labor ($240) | — | $240 |
| 2025-03-27 | J & M Contractors LLC | ACH. 76M. Basic Trim Labor ($1,910), 69.4 Drywall/Spackle Labor ($540), 72.4 Floor Tile Labor ($750), 44.4 Excavation/Backfill/Grading ($500), 56.4 Interior Stair Labor ($510), 82.5 Deck/Porch Labor (carpentry) ($840), 67.4 Insulation/Fire Stop Labor ($460) | — | $540 |
| 2025-04-03 | J & M Contractors LLC | Drywall | — | $530 |
| 2025-04-10 | J & M Contractors LLC | Spackle Labor | — | $640 |
| 2025-04-30 | J & M Contractors LLC | Drywall labor | — | $530 |
| 2025-05-08 | J & M Contractors LLC | Spackle labor | — | $290 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-01-09 | Jaeger Lumber | Drywall/Spackle Materials | — | $71 |
| 2025-01-15 | Home Depot | Drywall materials | 76 Midland (deleted) | $350 |
| 2025-01-24 | Home Depot | Drywall materials | 76 Midland (deleted) | $65 |
| 2025-02-13 | Home Depot | Drywall materials | 76 Midland (deleted) | $28 |
| 2025-03-27 | Home Depot | Floor Protection | — | $46 |
| 2025-03-28 | Home Depot | Drywall materials | — | $110 |
| 2025-04-09 | Home Depot | Drywall materials | — | $14 |
| 2025-05-06 | Home Depot | Touchupsmaterials | — | $40 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-02-18 | Jaeger Lumber | Gypsum board_Invoice# 2280603 | — | $84 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-10-31 | J & M Contractors LLC | Repairing the floors in the 2floor bathroom | — | $250 |
| 2024-11-07 | J & M Contractors LLC | framing for master shower ,Repairing the kitchen tile, installing Sheetrock , spackle, working in the mechanical room in the attic. B | — | $417 |
| 2024-12-17 | J & M Contractors LLC | The guys were repairing the floors. | — | $2,310 |
| 2025-01-23 | J & M Contractors LLC | Installing doors, molding and tile. Wk 1.13-19.2025 | — | $337 |
| 2025-01-23 | J & M Contractors LLC | Installing molding, doors, Sheetrock on stairs and preparing for tile. Wk 1.13-19.2025. B | — | $2,273 |
| 2025-01-23 | J & M Contractors LLC | JJ's Pay. B | — | $188 |
| 2025-01-30 | J & M Contractors LLC | Installing crown molding, doors, spackle, and tile. Wk 1.20-26.2025. B | 76 Midland (deleted) | $1,501 |
| 2025-02-14 | J & M Contractors LLC | Installing backsplash in the kitchen and installing double doors. B | — | $635 |
| 2025-02-20 | J & M Contractors LLC | Floor Tile Labor Wk 2.10-16.2025 | — | $2,705 |
| 2025-02-27 | J & M Contractors LLC | Iinstalling tile in the hallway bathroom, fixing the floor in the master closet and spackle | — | $2,190 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-01-08 | Standard Tile | Shower walls materials | — | $967 |
| 2025-01-08 | Standard Tile | Basement Powder room TIles | — | $924 |
| 2025-01-08 | Standard Tile | Tiles | 76 Midland (deleted) | $1,533 |
| 2025-01-10 | Home Depot | Electric and Tile Materials.B . 48208 | — | $116 |
| 2025-01-13 | Home Depot | 76 Miland. Tile and Stairs. Visa x9119 Joel Serrano. | — | $61 |
| 2025-01-14 | Home Depot | J SERRANO-THE HOME DEPOT #0908 (Floor Tiles) | — | $480 |
| 2025-02-07 | M S International, Inc. (MSI) | Kitchen Backsplash Tiles | — | $671 |
| 2025-02-08 | Home Depot | Tile Materials | — | $196 |
| 2025-02-19 | Home Depot | Tile materials | — | $155 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-03-20 | J & M Contractors LLC | 76M. 74.6 Interior Carpentry Labor- Basic trim Labor ($2,710), 72.4 Floor Tile Labor ($800), 73.4 Cabinet Labor ($870), 69.4 Drywall/Spackle Labor ($240) | — | $800 |
| 2025-03-27 | J & M Contractors LLC | ACH. 76M. Basic Trim Labor ($1,910), 69.4 Drywall/Spackle Labor ($540), 72.4 Floor Tile Labor ($750), 44.4 Excavation/Backfill/Grading ($500), 56.4 Interior Stair Labor ($510), 82.5 Deck/Porch Labor (carpentry) ($840), 67.4 Insulation/Fire Stop Labor ($460) | — | $750 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-02-15 | Jaeger Lumber | Flooring_Invoice# 2279727 | — | $84 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-12-12 | Advanced Flooring, LLC | Hardwood Floor Materials. | — | $5,906 |
| 2024-12-12 | Advanced Flooring, LLC | 2087D. Hardwood Materials | — | $0 |
| 2025-02-03 | Standard Tile | Additional Wall Tiles | 76 Midland (deleted) | $329 |
| 2025-06-05 | General Investments LLC | 76M Hardwood Flooring Payment 2(Check #123_$4276) | — | $4,276 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-10-31 | J & M Contractors LLC | Repairing the kitchen floor. | — | $270 |
| 2025-02-10 | General Investments LLC | Flooring Payment 1 & 3 | — | $2,143 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-02-10 | General Investments LLC | Flooring Payment 1 & 3 | — | $342 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-02-18 | Jaeger Lumber | Floor repair_Invoice# 2280867 | — | $85 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-12-19 | TSG Cabinets | Inv T984200 | — | $1,427 |
| 2024-12-19 | TSG Cabinets | Kitching Cabinets - Inv T984202 | — | $4,348 |
| 2024-12-19 | TSG Cabinets | Bathroom Vanities - Inv T984201 | — | $1,243 |
| 2025-01-14 | TSG Cabinets | Additional cabinet materials | 76 Midland (deleted) | $309 |
| 2025-01-16 | Home Depot | Blades for cabinets | 76 Midland (deleted) | $77 |
| 2025-01-28 | TSG Cabinets | Laundry Room Cabinet | 76 Midland (deleted) | $1,825 |
| 2025-04-22 | Ferguson Home/Ferguson | Cabinet Pulls | — | $247 |
| 2025-04-28 | Amazon | Additional Drawer Pull | — | $41 |
| 2025-05-01 | Ferguson Home/Ferguson | 76M. Kitchen Pulls | — | $32 |
| 2025-05-19 | TSG Cabinets | Cabinet materials | — | $196 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-01-02 | J & M Contractors LLC | Receiving Cabinet Delivery Wk 12.16-22.2024 | — | $145 |
| 2025-01-09 | J & M Contractors LLC | JJ's Pay. B | — | $604 |
| 2025-01-09 | J & M Contractors LLC | Installation of kitchen cabinet, and window moldings. WK 12.30-1.5.2025 | — | $2,070 |
| 2025-01-09 | J & M Contractors LLC | Installation of kitchen cabinets and sealing kitchen windows. Wk 12.23-29.2025 | — | $1,790 |
| 2025-01-16 | J & M Contractors LLC | Installation of kitchen Cabinet. Wk 01.066-12.205 | — | $970 |
| 2025-01-20 | J & M Contractors LLC | JJ's Pay. B | — | $193 |
| 2025-02-07 | J & M Contractors LLC | Cabinet Labor | — | $1,980 |
| 2025-02-14 | J & M Contractors LLC | Installing pocket doors,Laundry cabinets, and repairing the house footing. B | — | $707 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-01-30 | SP Stone & Tile Corp | Kitchen countertops | — | $2,626 |
| 2025-03-20 | SP Stone & Tile Corp | Fabrication: Vanity tops and Laundry | — | $2,615 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-03-20 | J & M Contractors LLC | 76M. 74.6 Interior Carpentry Labor- Basic trim Labor ($2,710), 72.4 Floor Tile Labor ($800), 73.4 Cabinet Labor ($870), 69.4 Drywall/Spackle Labor ($240) | — | $870 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-12-30 | Jaeger Lumber | Cabinets & Trim_Invoice# 2256547 | — | $66 |
| 2025-04-17 | Home Depot | Cabinet Knob | — | $184 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-01-09 | J & M Contractors LLC | Installation of window moldings. WK 12.30-1.5.2025 | — | $1,360 |
| 2025-01-09 | J & M Contractors LLC | Unload molding and cleaning. Wk 12.23-29.2025 | — | $220 |
| 2025-01-16 | J & M Contractors LLC | Installation of doors, molding, and prep work tile installation. Wk 01.066-12.205 | — | $665 |
| 2025-01-16 | Buildesign Home Improvement, LLC | Check carpentry, and Meetings | — | $300 |
| 2025-01-20 | J & M Contractors LLC | JJ's Pay. B | — | $132 |
| 2025-01-23 | J & M Contractors LLC | Installing molding, doors, Sheetrock on stairs and preparing for tile. Wk 1.13-19.2025. B | — | $2,273 |
| 2025-01-23 | J & M Contractors LLC | Installing doors, molding and tile. Wk 1.13-19.2025 | — | $337 |
| 2025-01-23 | J & M Contractors LLC | JJ's Pay. B | — | $1,270 |
| 2025-01-30 | J & M Contractors LLC | Installing crown molding, doors, spackle, and tile. Wk 1.20-26.2025. B | — | $1,501 |
| 2025-01-30 | Buildesign Home Improvement, LLC | Interior Carpentry Labor | — | $150 |
| 2025-02-07 | J & M Contractors LLC | installing molding spackle and grout. B | — | $375 |
| 2025-02-07 | J & M Contractors LLC | Redoing the attic stairs Installing molding and doing spackle. B | — | $330 |
| 2025-02-14 | J & M Contractors LLC | Installing molding, doors and doing spackle. B | — | $292 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-11-07 | Blue Ridge Lumber | Flashing_Invoice# 307179 | — | $517 |
| 2024-12-26 | Jaeger Lumber | Trim_Invoice# 2254752 | — | $5,738 |
| 2024-12-28 | Jaeger Lumber | Trim_Invoice# 2254752 | — | $123 |
| 2025-01-09 | Jaeger Lumber | 76M. Crown_Invoice# 2260911 | — | $264 |
| 2025-01-15 | Jaeger Lumber | 76M. Stairs and Trim_Invoice# 2264152 | — | $116 |
| 2025-01-16 | Jaeger Lumber | 76M. Trim & Closet_Invoice# 2264948 | — | $257 |
| 2025-03-10 | Jaeger Lumber | 76M|2025.03.10_Trim Materials_Invoice # 2291782_$347.97 | — | $348 |
| 2025-03-11 | Jaeger Lumber | rim Materials | — | $192 |
| 2025-03-24 | Jaeger Lumber | Trim Materials | — | $104 |
| 2025-03-25 | Jaeger Lumber | Trim Materials | — | $207 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-03-13 | J & M Contractors LLC | Repairing molding in the second floor and installing doors. B | — | $375 |
| 2025-03-13 | J & M Contractors LLC | Re doing molding and repairing doors. B | — | $375 |
| 2025-03-20 | J & M Contractors LLC | 76M. 74.6 Interior Carpentry Labor- Basic trim Labor ($2,710), 72.4 Floor Tile Labor ($800), 73.4 Cabinet Labor ($870), 69.4 Drywall/Spackle Labor ($240) | — | $2,710 |
| 2025-03-27 | J & M Contractors LLC | ACH. 76M. Basic Trim Labor ($1,910), 69.4 Drywall/Spackle Labor ($540), 72.4 Floor Tile Labor ($750), 44.4 Excavation/Backfill/Grading ($500), 56.4 Interior Stair Labor ($510), 82.5 Deck/Porch Labor (carpentry) ($840), 67.4 Insulation/Fire Stop Labor ($460) | — | $1,910 |
| 2025-04-03 | J & M Contractors LLC | Basic trim/interior carpentry | — | $1,900 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-07-17 | Home Depot | Interior Door Hardware. Ref# 15293 | — | $31 |
| 2024-12-18 | Blue Ridge Lumber | Interior Door | — | $4,938 |
| 2025-04-16 | Amazon | Door Knobs 1_non-turning knob | — | $385 |
| 2025-04-16 | Amazon | Door Knobs 2_non-turning knob | — | $306 |
| 2025-04-16 | Amazon | Door Knobs 3 - non-turning knob | — | $69 |
| 2025-04-25 | Home Depot | Additional door stop | — | $66 |
| 2025-04-25 | Home Depot | Additional door stop | — | $0 |
| 2025-04-28 | Ferguson Home/Ferguson | Kwikset for Pocket door | — | $49 |
| 2025-04-30 | Home Depot | Door Stop | — | $60 |
| 2025-05-14 | Home Depot | barrel bolt | — | $6 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-03-27 | J and R Railings Inc. | Interior Posts, Spindles and railings | — | $2,435 |
| 2025-05-09 | J and R Railings Inc. | Interior Posts, Spindles and railings | — | $2,435 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-12-10 | Jaeger Lumber | Lumber_Invoice# 2247817 | — | $713 |
| 2025-04-09 | Buildesign Home Improvement, LLC | Met with railing guy | — | $75 |
| 2025-04-10 | J & M Contractors LLC | Interior Carpentry | — | $750 |
| 2025-04-21 | J & M Contractors LLC | Interior Carpentry Labor | — | $290 |
| 2025-04-23 | Jaeger Lumber | Floor protection materials | — | $96 |
| 2025-04-23 | J & M Contractors LLC | 76M. Wk 4.14-20.25. Interior Carpentry | — | $770 |
| 2025-04-30 | J & M Contractors LLC | Interior Carpentry | — | $435 |
| 2025-05-08 | J & M Contractors LLC | Interior carpentry labor | — | $730 |
| 2025-05-14 | J & M Contractors LLC | Interior carpentry | — | $257 |
| 2025-06-04 | J & M Contractors LLC | 76M. Interior Carpentry | — | $220 |
| 2025-06-11 | J & M Contractors LLC | 76M.Interior Carpentry | — | $330 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-01-23 | J & M Contractors LLC | Installing doors, molding and tile. Wk 1.13-19.2025 | — | $337 |
| 2025-01-30 | J & M Contractors LLC | Installing crown molding, doors, spackle, and tile. Wk 1.20-26.2025. B | — | $1,501 |
| 2025-02-07 | J & M Contractors LLC | building closets installing doors and doing spackle. B | — | $330 |
| 2025-02-14 | J & M Contractors LLC | Installing pocket doors,Laundry cabinets, and repairing the house footing. B | — | $707 |
| 2025-02-14 | J & M Contractors LLC | Installing molding, doors and doing spackle. B | — | $292 |
| 2025-02-14 | J & M Contractors LLC | Installing backsplash in the kitchen and installing double doors. B | — | $635 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-03-07 | J & M Contractors LLC | ACH. 76M. 64.4 Electrical Labor ($530), 63.4 Plumbing Labor ($1,325), Interior Door Labor ($1,590) | — | $1,590 |
| 2025-03-13 | J & M Contractors LLC | Re doing molding and repairing doors. B | — | $375 |
| 2025-03-13 | J & M Contractors LLC | Repairing molding in the second floor and installing doors. B | — | $375 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-01-31 | Blue Ridge Lumber | 76M. Additional Door_Invoice# 329591 | — | $650 |
| 2025-04-17 | Home Depot | Adjustable Floor Door stop | — | $133 |
| 2025-04-17 | — | Refund Door stop | — | $-60 |
| 2025-04-25 | — | Additional door stop was cancelled from order WG87391681 | — | $-66 |
| 2025-06-04 | Blue Ridge Lumber | Interior Door hardware | — | $221 |
| 2025-06-04 | Blue Ridge Lumber | Sliding Door Locking mechanism 2 | — | $139 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-01-06 | Home Depot | Trim materials | 76 Midland (deleted) | $106 |
| 2025-01-06 | Sherwin Williams | Trim materials | — | $40 |
| 2025-01-09 | Home Depot | Trim materials | 76 Midland (deleted) | $181 |
| 2025-01-23 | Home Depot | Trim materials | 76 Midland (deleted) | $141 |
| 2025-02-12 | Home Depot | Trim materials | 76 Midland (deleted) | $15 |
| 2025-03-27 | Home Depot | Trim Materials. Reimburse to J&M. | — | $111 |
| 2025-03-31 | Home Depot | Trim materials | — | $58 |
| 2025-04-24 | Home Depot | Trim materials | — | $26 |
| 2025-04-28 | Home Depot | Trim materials | — | $45 |
| 2025-05-09 | Home Depot | Touchups materials | — | $158 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-03-19 | Jaeger Lumber | Fireplace trime materials | — | $211 |
| 2025-04-10 | Jaeger Lumber | Moulded handrail and lancas | — | $536 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-02-07 | J & M Contractors LLC | building closets installing doors and doing spackle. B | — | $330 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-04-03 | J & M Contractors LLC | Work on fireplace | — | $290 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-05-01 | Home Depot | Closet materials | — | $220 |
| 2025-06-04 | Home Depot | Closet Materials | — | $68 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-03-27 | Carlos Painting LLC | Paint Flat Price. Pmt 1. Down Payment | — | $1,000 |
| 2025-05-15 | Carlos Painting LLC | Interior work. Pmt 5 - Second Coat | — | $4,000 |
| 2025-06-05 | Fabian's Painting LLC | Pmt 1 of 2. | — | $2,000 |
| 2025-06-12 | Fabian's Painting LLC | Paint labor | — | $3,500 |
| 2025-06-20 | Fabian's Painting LLC | 76M. Paint Labor_Pmt 2 P2o2, Pmt 3 P2o2 | — | $1,500 |
| 2025-08-25 | Carlos Painting LLC | Paint. Pmt 6 | — | $1,000 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-04-21 | Carlos Painting LLC | 76M. Paint Flat Price. Interior Work. Pmt 2 - Paint Prep | — | $3,000 |
| 2025-04-21 | Carlos Painting LLC | 76M. Paint Flat Price. Interior Work. Pmt 3 - Priming | — | $2,500 |
| 2025-04-21 | Carlos Painting LLC | 76M. Paint Flat Price. Interior Work. Pmt 4 - First Coat | — | $2,500 |
| 2025-11-14 | Fabian's Painting LLC | 76M. Payment 4 | — | $1,500 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-03-05 | Buildesign Home Improvement, LLC | Paint Labor | — | $184 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-06-04 | Buildesign Home Improvement, LLC | Check painters and move tools | — | $75 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-01-02 | Home Depot | Paint materials. 17976 | — | $24 |
| 2025-03-21 | Staples | 76M Paint Sched (specifying colors,) | — | $6 |
| 2025-05-14 | Sherwin Williams | Paint Materials | — | $31 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-05-05 | American Royal Hardware | Shoe cover | — | $55 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-04-30 | J & M Contractors LLC | Accessories Installation labor | — | $1,260 |
| 2025-05-08 | J & M Contractors LLC | Accessories installation | — | $1,520 |
| 2025-05-14 | J & M Contractors LLC | Accessories Installation Labor | — | $857 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-04-16 | Amazon | Mirror and bath accessories | — | $451 |
| 2025-04-16 | Birch Lane | Glover Solid Wood Round Mirror | — | $130 |
| 2025-04-16 | Wayfair | 76M Basement Bath Mirrors 50/50 112W and 76M | — | $106 |
| 2025-05-12 | WaterWays Decor | Bathroom accessories | — | $107 |
| 2025-05-14 | Home Depot | Robe hook | — | $25 |
| 2025-05-27 | WaterWays Decor | Bathroom accessories | — | $23 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-05-15 | Tor Glass | Frameless Glass Enclosures and Mirrors. Pmt 2 - Final | — | $750 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-04-11 | Tor Glass | Master Bathroom Glass | — | $750 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-04-24 | Steel Appliances | 76M. Appliances 50% Deposit | — | $5,648 |
| 2025-04-29 | Steel Appliances | 76M. Appliances Final Payment | — | $5,648 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-04-30 | J & M Contractors LLC | Appliance Installation labor | — | $530 |
| 2025-05-14 | Buildesign Home Improvement, LLC | Install hood | — | $150 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-03-27 | J & M Contractors LLC | ACH. 76M. Basic Trim Labor ($1,910), 69.4 Drywall/Spackle Labor ($540), 72.4 Floor Tile Labor ($750), 44.4 Excavation/Backfill/Grading ($500), 56.4 Interior Stair Labor ($510), 82.5 Deck/Porch Labor (carpentry) ($840), 67.4 Insulation/Fire Stop Labor ($460) | — | $840 |
| 2025-04-21 | J & M Contractors LLC | Deck Labor | — | $1,300 |
| 2025-04-23 | All-Star Fiberglass | Balcony Fiberglass Installation | — | $1,350 |
| 2025-04-23 | J & M Contractors LLC | 76M. Wk 4.14-20.25. Porch Labor | — | $1,350 |
| 2025-05-08 | J & M Contractors LLC | Deck Labor | — | $500 |
| 2025-05-28 | J & M Contractors LLC | Deck and porch labor | — | $290 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-03-20 | Jaeger Lumber | Deck/Porch Materials | — | $368 |
| 2025-04-08 | Jaeger Lumber | Decking materials | — | $2,570 |
| 2025-04-10 | Jaeger Lumber | Deck materials | — | $216 |
| 2025-04-11 | Jaeger Lumber | Deck materials | — | $657 |
| 2025-04-14 | Jaeger Lumber | Decking materials | — | $172 |
| 2025-04-15 | Jaeger Lumber | Balcony Materials | — | $77 |
| 2025-04-30 | Jaeger Lumber | Decking/Crawl space materials | — | $262 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-04-23 | Abbe Lumber Corporation | Balcony Railings | — | $942 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-01-09 | J & M Contractors LLC | JJ's Pay. B | — | $396 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-06-04 | J & M Contractors LLC | 76M. Exterior Carpentry | — | $260 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-04-25 | Home Depot | Benches | — | $90 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-04-16 | Home Depot | Metal House Numbers | — | $23 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-06-06 | Garden State Construction (Asphalt) | Driveway | — | $3,650 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-05-23 | Northeast Fencing LLC | Fence Install | — | $3,125 |
| 2025-06-03 | Northeast Fencing LLC | Fence Install.Final Pay | — | $3,125 |
| 2025-06-06 | Northeast Fencing LLC | 76M. Fence Panel (Additional) | — | $240 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-05-16 | A-R General Contractor_Alberto Landscape & Snow Removal | Landscaping | — | $2,140 |
| 2025-05-29 | A-R General Contractor_Alberto Landscape & Snow Removal | Landscaping_Final Payments_Payment 5 $ 7 | — | $850 |
| 2025-05-29 | A-R General Contractor_Alberto Landscape & Snow Removal | Landscaping_Final Payments_Payment 2 $ 3 | — | $860 |
| 2025-06-02 | Brookside Garden Center | Landscaping materials | — | $195 |
| 2025-06-05 | A-R General Contractor_Alberto Landscape & Snow Removal | Landscaping. Pmt 8 | — | $450 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2024-08-16 | A-R General Contractor_Alberto Landscape & Snow Removal | Clear out and tree removal | — | $1,200 |
| 2025-05-16 | A-R General Contractor_Alberto Landscape & Snow Removal | Clear out | — | $500 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-05-21 | A-R General Contractor_Alberto Landscape & Snow Removal | Install all topsoil & backyard grass seed and hay (Part 2 of 3) | — | $650 |
| 2025-05-21 | A-R General Contractor_Alberto Landscape & Snow Removal | Landscaping. Pmt 5 - Repair the city sidewalk and the house sidewalk (Part 2 of 3) | — | $250 |
| 2025-05-21 | A-R General Contractor_Alberto Landscape & Snow Removal | Landscaping. Pmt 6 - Repair the brick front steps (Part 2 of 2) | — | $300 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-06-04 | Buildesign Home Improvement, LLC | Met with Andrew and Alberto | — | $38 |
| Date | Vendor | Description | Class | Amount |
|---|---|---|---|---|
| 2025-05-14 | J & M Contractors LLC | Punch List and Sale Prep Labor | — | $110 |
| 2025-05-14 | Buildesign Home Improvement, LLC | Punchlist | — | $372 |
| 2025-05-21 | J & M Contractors LLC | 76M. Punchlist | — | $645 |
| 2025-06-04 | J & M Contractors LLC | 76M. Punch list | — | $490 |