VG Home Buyers · Work orders

Work Orders Field reference — sourced from reference/cost-codes/work-orders.yaml

P1 Site & Shell
13
P2 Systems & Ext
14
P3 Finishes
27
Total
54
Phase
54 WOs
No work orders match the current filters.
P0 · Pre-Project 3 segments

These are accounting categories tracked in QuickBooks, not field work orders. No WO IDs are issued for these segments.

Segment Name QB Account Category
12 Buying see chart of accounts
13 Financing see chart of accounts
14 Holding Costs see chart of accounts
P1 · Site, Shell & Structure 13 WOs
WO Name Cost Codes
P1W01a Site Management 18.0 · 18.1 · 18.2 · 18.6 · 18.7 · 18.8 · 18.9
P1W01b Tree Removal Optional 88.7 · 88.8
P1W02 Utility Modification / Sewer Systems 20.0 · 22.0 · 24.0 · 24.4 · 24.7 · 24.8 · 26.0 · 26.4 · 26.7 · 28.0 · 28.4 · 28.7 · 28.8 · 28.9 · 29.0 · 29.1 · 29.4
P1W03 Demolition 32.0 · 32.2 · 32.3 · 32.4 · 32.7
P1W04 Site Work 40.0 · 44.0 · 44.1 · 44.2 · 44.3 · 44.4 · 44.5 · 44.6 · 44.7 · 44.8 · 44.9
P1W05 Foundation 42.0 · 42.1 · 42.4
P1W06 Framing 50.0 · 52.0 · 52.1 · 52.2 · 52.3 · 52.4 · 52.5
P1W07 Roofing 53.0 · 53.1 · 53.4 · 53.7
P1W08 Windows & Exterior Doors 54.0 · 54.2 · 54.3 · 54.7
P1W09 Interior Stairs 56.0 · 56.1 · 56.4
P1W10 Siding & Shutters 58.0 · 58.1 · 58.2 · 58.3 · 58.4 · 58.5 · 58.6 · 58.7 · 58.8
P1W11 Gutters & Leaders 53.8
P1W12 End of Phase 1 Handoff Handoff 18.9
P2 · Systems & Exterior 14 WOs
WO Name Cost Codes
P2W01 Phase 2 Pre-Takeover Walkthrough Pre-Takeover 18.9
P2W02 Plumbing 63.0 · 63.1 · 63.2 · 63.4 · 63.7
P2W03 HVAC 62.0 · 62.1 · 62.2 · 62.4 · 62.7 · 62.8 · 62.9
P2W04 Electrical 64.0 · 64.1 · 64.2 · 64.3 · 64.4 · 64.6 · 64.7 · 64.8
P2W05 Security & Technology Optional 65.0
P2W06 Fireplaces 66.0 · 66.7
P2W07 Insulation & Soundproofing 67.0 · 67.1 · 67.4 · 67.7 · 68.0 · 68.1 · 68.4 · 68.7
P2W08 Drywall 69.0 · 69.1 · 69.4 · 69.7
P2W09 Exterior Carpentry 82.0 · 82.1 · 82.2 · 82.3 · 82.4 · 82.5 · 82.6 · 82.7
P2W09b Exterior Masonry Optional 84.8
P2W10 Landscape & Grounds 88.0 · 88.7 · 88.8
P2W11 Yard Fencing 86.0 · 86.1 · 86.4 · 86.7
P2W12 Driveway 84.7
P2W13 End of Phase 2 Handoff Handoff 18.9
P3 · Finishes 27 WOs
WO Name Cost Codes
P3W01 Phase 3 Pre-Takeover Walkthrough Pre-Takeover 18.9
P3W02 Tile Installation 71.0 · 71.1 · 71.4
P3W03 Flooring (Non-Tile) 72.0 · 72.2 · 72.3 · 72.5 · 72.6 · 72.7
P3W04 Cabinetry 73.0 · 73.1 · 73.2 · 73.4
P3W05 Interior Doors 74.1
P3W06 Closet Carpentry 74.2 · 74.5 · 74.6
P3W07 Basic Trim 74.3 · 74.7
P3W07a Specialty Trim — Mudroom Optional 74.4a · 74.8a
P3W07b Specialty Trim — Coffered Ceilings Optional 74.4b · 74.8b
P3W07c Specialty Trim — Specialty Walls Optional 74.4c · 74.8c
P3W07d Specialty Trim — Fireplace Specialty Optional 74.4d · 74.8d
P3W07e Specialty Trim — Specialty Beams Optional 74.4e · 74.8e
P3W07f Specialty Trim — Wainscoting Optional 74.4f · 74.8f
P3W07g Specialty Trim — Bookshelf Built Ins Optional 74.4g · 74.8g
P3W07h Specialty Trim — Bench Built Ins Optional 74.4h · 74.8h
P3W07i Specialty Trim — Specialty Ceilings Optional 74.4i · 74.8i
P3W07j Specialty Trim — Shiplap Optional 74.4j · 74.8j
P3W08 Painting & Wallpaper 75.0 · 75.1 · 75.2 · 75.4 · 75.5
P3W09 Countertops & Stone 73.0 · 73.4
P3W10 Stain Finishing Optional 75.8
P3W11 Backsplash 71.1 · 71.4
P3W12 Interior Accessories 76.0 · 76.1 · 76.4 · 76.7
P3W13 Door & Cabinet Knobs / Hardware 74.1
P3W14 MEP Finishes
P3W15 Shower Glass & Mirrors (Frameless) 76.1 · 76.7
P3W16 Appliances 77.0 · 77.1 · 77.4
P3W17 Final Punch List 92.4
P4 · Sale 4 segments

These are accounting categories tracked in QuickBooks, not field work orders. No WO IDs are issued for these segments.

Segment Name QB Account Category
93 Sale Preparation see chart of accounts
95 Other Expenses-NonCon see chart of accounts
96 Selling see chart of accounts
99 Sale see chart of accounts